Similarities and differences between naturalistic driving and riding study methodologies Sample Clauses

Similarities and differences between naturalistic driving and riding study methodologies. The core difference between these types of studies is that today the existing knowledge of passenger car movement characteristics and driver behaviour is well advanced. On the contrary there is relatively little knowledge on PTW movement characteristics and rider behaviour. This makes the job of rider behaviour observation more difficult and at the same time more challenging, as the performance measurements cannot be tailored to specific behaviours. There are no set values to describe riding patterns, conflicts, etc. This will be achieved through a synthesis of the existing knowledge on passenger cars, the determination of the differences between a passenger car and a PTW and a trial- and-error procedure. The core similarity between the naturalistic driving and riding study methodologies is that the steps that need to be taken towards the design are similar. In particular, the aim of the experiment has to be defined and the different hypotheses and questions need to be elaborated. Based on the above, the behaviours that one wants to capture should be determined through the appropriate variables and scenarios. This means defining participant characteristics, recording instrumentation, and other data tools. Remaining issues relate to participant recruitment and briefing/training, instrumentation installation and testing, data storage and analysis, legal and ethical issues and other issues related to the conduct and implementation of the study. In general, in naturalistic driving studies extreme values of the scenario variables are avoided (i.e. high risk driver groups) so as not to put the driver at great risk. As noted in the previous section, PTW riders are at greater risk of crashing and seriously injuring themselves than drivers of other vehicles. This results in having to be even more cautious when designing the scenarios (determining rider characteristics and rider recruitment strategies, location characteristics and PTW characteristics), in order to avoid risky situations that could lead to PTW accidents during the study. Such variables can include for example type of road, road surface, weather conditions, participant age, participant experience, riding with passengers etc. Another similarity involves the monitored variables and the capabilities of the instrumentation. For example, in both cases the space and speed trajectory need to be recorded - and in both cases, there is a minimal frequency at which the recording should be made. In addition, a vi...
AutoNDA by SimpleDocs

Related to Similarities and differences between naturalistic driving and riding study methodologies

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • CHILD AND DEPENDENT ADULT/ELDER ABUSE REPORTING CONTRACTOR shall establish a procedure acceptable to ADMINISTRATOR to ensure that all employees, agents, subcontractors, and all other individuals performing services under this Agreement report child abuse or neglect to one of the agencies specified in Penal Code Section 11165.9 and dependent adult or elder abuse as defined in Section 15610.07 of the WIC to one of the agencies specified in WIC Section 15630. CONTRACTOR shall require such employees, agents, subcontractors, and all other individuals performing services under this Agreement to sign a statement acknowledging the child abuse reporting requirements set forth in Sections 11166 and 11166.05 of the Penal Code and the dependent adult and elder abuse reporting requirements, as set forth in Section 15630 of the WIC, and shall comply with the provisions of these code sections, as they now exist or as they may hereafter be amended.

  • Professional Development; Adverse Consequences of School Exclusion; Student Behavior The Board President or Superintendent, or their designees, will make reasonable efforts to provide ongoing professional development to Board members about the adverse consequences of school exclusion and justice-system involvement, effective classroom management strategies, culturally responsive discipline, appropriate and available supportive services for the promotion of student attendance and engagement, and developmentally appropriate disciplinary methods that promote positive and healthy school climates, i.e., Senate Bill 100 training topics. Board Self-Evaluation The Board will conduct periodic self-evaluations with the goal of continuous improvement. New Board Member Orientation The orientation process for newly elected or appointed Board members includes:

  • Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • COVID-19 Residents acknowledge that in March 2020 the World Health Organization declared a global pandemic of the virus leading to COVID-19. The Governments of Canada, the Province of Ontario, and local Governments responded to the pandemic with legislative amendments, controls, orders, by-laws, requests of the public, and requests and requirements to Humber (collectively, the “Directives”). It is uncertain how long the pandemic, and the related Directives, will continue, and it is unknown whether there may be a resurgence of the virus leading to COVID-19 or any mutation thereof (collectively, “COVID- 19”). Without limiting the generality of the foregoing paragraph, Humber shall not be held legally responsible or be deemed to be in breach of this Agreement for any damages or loss arising out of or caused by:

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Earned Value Management System ‌ An earned value management system (EVMS) means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of EVMS are described in American National Standards Institute /Electronics Industries Alliance (ANSI/EIA) Standard-748. An EVMS is not mandatory; however, Contractors are encouraged to have an EVMS ANSI/EIA Standard-748 during the entire term of OASIS. The Contractor shall notify the OASIS CO, in writing, if there are any changes in the status of their EVMS and provide the reasons for the change and copies of audits by the Defense Contract Management Agency (DCMA) or other cognizant Government administration office, as applicable. If only part of a Contractor’s organization is EVMS ANSI/EIA Standard-748 certified, the Contractor shall make the distinction between which business units or sites and geographic locations have been certified.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

Time is Money Join Law Insider Premium to draft better contracts faster.