Site Calibration Sample Clauses

Site Calibration. In case Site Calibration revealed to be necessary according to the conclusions of 5.2.2 of this Part J-2-A, the IE will perform that Site Calibration in accordance to Annex C of [Ref.1] for each of the TWT requiring it. The Site Calibration works, involving the installation of met mast/s in the position of the TWT, will be scheduled in a manner that does not interfere on the civil works of the wind farm. The IE will propose a detailed schedule for the acceptance of the Parties. The IE will report periodically including information of the status of completion of the Site Calibration according to [Ref.1]. It will be aimed at the completion of representative measurement sectors which allows for the execution of the subsequent Power Curve Test in a reasonable amount of time. In case the Site Calibration must be extended for that purpose, the Parties will collaborate in the definition of the best solution which allows the completion of the measurements and causes the lowest impact on the execution of the wind farm works. The IE will issue a Site Calibration report according to [Ref.1], which will be shared between the involved parties. Regarding the procedure of site calibration, the requirements of points C.7 and C.8 of Annex C of IEC61400-12-1 Ed.2 should be met, especially the points related to: - Convergence check - Correlation check for linear regression - Change in correction between adjacent wind direction bins If these conditions are not met, the site calibration procedure will be carefully reviewed and, under consideration of the IE, uncertainties might be reviewed.
AutoNDA by SimpleDocs
Site Calibration. At least sixty (60) days prior to commencement of erection of any Wind Turbine at the Site, Owner shall cause, at its sole cost and expense, a third party engineer with significant experience in power curve testing of wind turbines who is mutually acceptable to Owner and Seller (the "Test Engineer") to complete Site Calibration pursuant to the Site Calibration Procedures described in Exhibit F. If Owner commences erection of a Wind Turbine prior to completion of the Site Calibration, the Power Curve Test shall be waived. The report and data of the Test Engineer on the Site Calibration shall be promptly delivered to Seller for its review and comment. In the event the parties cannot agree on a Test Engineer, then the Independent Engineer shall choose between the Owner's candidate and the Seller's candidate. The report and data of the Test Engineer on the Site Calibration shall be promptly delivered to Owner and Seller for their review and comment.

Related to Site Calibration

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!