STORAGE, HANDLING AND PROTECTION Sample Clauses

STORAGE, HANDLING AND PROTECTION. .1 Handle and store products in manner to prevent damage, adulteration, deterioration and soiling and in accordance with manufacturer's instructions when applicable.
AutoNDA by SimpleDocs
STORAGE, HANDLING AND PROTECTION. 1 Store spare parts, maintenance materials, and special tools in manner to prevent damage or deterioration.
STORAGE, HANDLING AND PROTECTION. 1 Handle and store products in manner to prevent damage, adulteration, deterioration and soiling and in accordance with manufacturer's instructions when applicable. .2 Store packaged or bundled products in original and undamaged condition with manufacturer's seal and labels intact. Do not remove from packaging or bundling until required in Work. .3 Store products subject to damage from weather in weatherproof enclosures. .4 Store cementitious products clear of earth or concrete floors, and away from walls. .5 Keep sand, when used for grout or mortar materials, clean and dry. Store sand on wooden platforms and cover with waterproof tarpaulins during inclement weather.
STORAGE, HANDLING AND PROTECTION. 1 Store, materials to be reused, recycled and salvaged in locations as directed by Contract Administrator.
STORAGE, HANDLING AND PROTECTION. .1 The Supplier shall provide the Construction Contractor with full instructions in writing of all preservation requirements, procedures and precautions for long-term storage and protection of the equipment. A copy of all instructions shall be provided to the Contract Administrator.
STORAGE, HANDLING AND PROTECTION. 1 Store materials to be reused, recycled and salvaged on-site until time for disposal.
STORAGE, HANDLING AND PROTECTION. 1 Handle and store products in manner to prevent damage, adulteration, deterioration and soiling and in accordance with manufacturer's instructions when applicable. .2 Store packaged or bundled products in original and undamaged condition with manufacturer's seal and labels intact. Do not remove from packaging or bundling until required in Work. .3 Store products subject to damage from weather in weatherproof enclosures. .4 Store cementitious products clear of earth or concrete floors, and away from walls. .5 Keep sand, when used for grout or mortar materials, clean and dry. Store sand on wooden platforms and cover with waterproof tarpaulins during inclement weather. .6 Store sheet materials, lumber on flat, solid supports and keep clear of ground. Slope to shed moisture. .7 Store and mix paints in ventilated area. Remove oily rags and other combustible debris from Site daily. Take every precaution necessary to prevent spontaneous combustion. .8 Remove and replace damaged products at own expense and to satisfaction of Contract Administrator. .9 Touch-up damaged factory finished surfaces to Contract Administrator’s satisfaction. Use touch-up materials to match original. Do not paint over name plates. 1.5 TRANSPORTATION .1 Pay costs of transportation of products required in performance of Work. 1.6
AutoNDA by SimpleDocs
STORAGE, HANDLING AND PROTECTION. .1 Store spare parts, maintenance materials, and special tools in manner to prevent damage or deterioration. Bid Opportunity No. 339-2016 MAINTENANCE REQUIREMENTS St.Vital Park Toboggan Slides & Shelter Page 3 .2 Store in original and undamaged condition with manufacturer's seal and labels intact.
STORAGE, HANDLING AND PROTECTION. 1 Handle and store products in manner to prevent damage, adulteration, deterioration and soiling and in accordance with manufacturer's instructions when applicable. .2 Store packaged or bundled products in original and undamaged condition with manufacturer's seal and labels intact. Do not remove from packaging or bundling until required in Work. .3 Store products subject to damage from weather in weatherproof enclosures. .4 Store cementitious products clear of earth or concrete floors, and away from walls. .5 Keep sand, when used for grout or mortar materials, clean and dry. Store sand on wooden platforms and cover with waterproof tarpaulins during inclement weather. .6 Store sheet materials, lumber, fencing on flat, solid supports and keep clear of ground. Slope to shed moisture. .7 Store and mix paints in heated and ventilated room. Remove oily rags and other combustible debris from site daily. Take every precaution necessary to prevent spontaneous combustion. .8 Remove and replace damaged products at own expense and to satisfaction of Departmental Representative. .9 Touch-up damaged factory finished surfaces to Departmental Representative's satisfaction. Use touch-up materials to match original. Do not paint over name plates.
STORAGE, HANDLING AND PROTECTION. 1 Store, materials to be reused, recycled and salvaged in locations as specified in MSSP. .2 Unless specified otherwise, materials for removal become Contractor's property. .3 Protect, stockpile, store and catalogue salvaged items. .4 Separate non-salvageable materials from salvaged items. Transport and deliver nonsalvageable items to licensed disposal facility. .5 Protect structural components not removed for demolition from movement or damage. .6 Support affected structures. If safety of building is endangered, cease operations and immediately notify Departmental Representative. .7 Protect surface drainage, mechanical and electrical from damage and blockage. .8 Separate and store materials produced during .9 dismantling of structures in designated areas. Prevent contamination of materials to be salvaged and recycled and handle materials in accordance with requirements for acceptance by designated facilities. .1 On-site source separation is recommended. .2 Remove co-mingled materials to off-site processing facility for separation. .3 Provide waybills for separated materials.
Time is Money Join Law Insider Premium to draft better contracts faster.