Stormwater Managemen Sample Clauses

Stormwater Managemen. The City Heights proposal would comply with the requirements of Ecology’s 2004 Stormwater Management Manual for Eastern Washington (SWMMEW) to mitigate the potential impacts of surface water runoff described above. Temporary erosion/sedimentation control (ESC) facilities would be installed during construction. ESC measures would minimize soil erosion once the natural vegetative cover has been removed, and would minimize the occurrence of sediment from those same areas migrating into water bodies such as streams. Permanent stormwater management facilities would be created concurrent with residential and commercial development on the site, and technologies associated with sustainable designs would be implemented. Possible treatment methods to accomplish this goal are described below. Based on the proposed design criteria and mitigation measures for stormwater management, it is anticipated that the City Heights project would not adversely affect the existing water quality of Crystal Creek during construction or in the completed condition of the development. Flow control and channel stabilization measures will be implemented throughout the project site in compliance with Ecology’s 2004 SWMMEW standards, especially near existing critical areas such as wetlands and streams (such as Stream D), to minimize both existing conditions of erosion and sediment transport and conditions that have the potential be made worse as a result of site development. Representative Best Management Practices are listed below: • BMP C102: Buffer Zones • BMP C120: Temporary and Permanent Seeding • BMP C122: Nets and Blankets • BMP C124: Sodding • BMP C200: Interceptor Dike and Xxxxxx • BMP C202: Channel Lining • BMP C207: Check Dams • BMP C209: Outlet Protection • BMP C234: Vegetated Strip • BMP C235: Straw Wattles • BMP F6.10: Detention Ponds • BMP F6.21: Infiltration Ponds • BMP F6.42: Full Dispersion • BMP T5.10: Infiltration Ponds • BMP T5.40: Biofiltration Xxxxxx • BMP T5.50: Vegetated Filter Strip
AutoNDA by SimpleDocs

Related to Stormwater Managemen

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • SITE MANAGEMENT We reserve the right, but not the obligation, to: (1) monitor the Site for violations of these Terms of Use; (2) take appropriate legal action against anyone who, in our sole discretion, violates the law or these Terms of Use, including without limitation, reporting such user to law enforcement authorities; (3) in our sole discretion and without limitation, refuse, restrict access to, limit the availability of, or disable (to the extent technologically feasible) any of your Contributions or any portion thereof; (4) in our sole discretion and without limitation, notice, or liability, to remove from the Site or otherwise disable all files and content that are excessive in size or are in any way burdensome to our systems; and (5) otherwise manage the Site in a manner designed to protect our rights and property and to facilitate the proper functioning of the Site.

  • FLOODPLAIN MANAGEMENT AND WETLAND PROTECTION Executive Order 11988, Floodplain Management, May 24, 1977 (42 FR 26951), 3 C.F.R., 1977 Comp., p. 117, as interpreted in HUD regulations at 24 C.F.R. Part 55, particularly Section 2(a) of the Order (For an explanation of the relationship between the decision- making process in 24 C.F.R. Part 55 and this part, see § 55.10.); and Executive Order 11990, Protection of Wetlands, May 24, 1977 (42 FR 26961), 3 C.F.R., 1977 Comp., p. 121 particularly Sections 2 and 5. COASTAL ZONE MANAGEMENT The Coastal Zone Management Act of 1972 (16 U.S.C. § 1451, et seq.), as amended, particularly sections 307(c) and (d) (16 U.S.C. § 1456(c) and (d)).

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Labour Management (a) No employee or group of employees will undertake to represent the Union at meetings with the University without the proper authorization of the Union. Neither will the University meet with any employee or group of employees undertaking to represent the Union without the authorization of the Union. In representing an employee or group of employees, an elected or appointed representative of the Union will speak for the Union.

  • Traffic Management The Customer will not utilize the Services in a manner which, in the view of the Centre Operator, significantly distorts traffic balance on the Centre Operator’s circuits which are shared with other users. If, in the reasonable view of the Centre Operator, the Customer’s traffic patterns cause or may cause such distortion, the Customer should have a dedicated circuit capability. If the Customer declines to do so then the Centre Operator may suspend the Services while the matter is being resolved. If there is no resolution within 5 business days then either party may terminate the Agreement.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Utilization Management Contractor shall maintain a utilization management program that complies with applicable laws, rules and regulations, including Health and Safety Code § 1367.01 and other requirements established by the applicable State Regulators responsible for oversight of Contractor.

Time is Money Join Law Insider Premium to draft better contracts faster.