Surface Tolerance Sample Clauses

Surface Tolerance. Add the following:
AutoNDA by SimpleDocs
Surface Tolerance. Provide a compacted surface in accordance with Section 423.3.5.5 “Surface tolerance”, Section 401 and these supplemental specifications. The Contactor shall profile the pavement surface that will be recycled, prior to beginning HIR work. The Contractor shall profile the pavement surface following the completion of HIR work. Any reduction in average IRI per 0.10 mile or bumps / dips that exceed the before HIR profile shall be corrected by the Contractor. Corrective measures may include, diamond grind followed by fog seal, mill and replace with approved HMA or recycle a second time or alternate as approved by the Project Manager. All corrective actions shall be responsibility of the Contractor. All corrected pavement shall be re-measured. Smoothness testing shall be paid under bid itemSampling and testing by Contractor. No price adjustments as described in Section 401 shall apply to HIR work under this Contract.
Surface Tolerance. The complete surface of the Full Depth Recycled course shall be shaped and maintained to a tolerance, above or below the required cross sectional shape, of ⅜ inch.
Surface Tolerance. 1 Concrete tolerance in accordance with CSA-A23.1/A23.2, straight edge method.
Surface Tolerance. The asphalt mixture will be accepted on the roadway with respect to surface tolerance in accordance with the applicable requirements of 334- 3.10.
Surface Tolerance. Section 409.3(l) but replace the requirement for defective pavement with the following: The pavement is defective if irregularities are more than 1/4-inch.
Surface Tolerance. Finished paving surfaces shall not vary more than 1/4" inch measured with a 10' metal straight edge, except at grade changes. No birdbaths or other surface irregularities will be permitted. Correct irregularities as directed.
AutoNDA by SimpleDocs
Surface Tolerance. The concrete surface shall not vary more than ¼” under a 10’ straight edge when measured in any direction.

Related to Surface Tolerance

  • Tolerance Average net mass of cement packed in bags in a sample shall be equal to or more than 50kg. If and as desired by the Engineer-in-Charge, the number of samples to be checked for net mass of cement per bag, in a given number of bags shall be as given below: 100 to 150 bags : 20 sample 150 to 280 bags : 32 sample 281 to 500 bags : 50 sample 501 to 1200 bags : 80 sample 1201 to 3200 bags : 125 sample 3201 and above : 200 sample The bags in a sample shall be selected at random. B- Sand (Fine Aggregate)

  • Tolerances 1. If a non-originating material used in the production of a product does not satisfy the requirements set out in Annex 3-B, the product shall be considered as originating in a Party, provided that:

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!