T2S Executive Summary Plan Sample Clauses

T2S Executive Summary Plan. 288 The T2S Executive Summary Plan documents the milestones, synchronisation points and the 289 duration of activities for the major deliverables and phases of the T2S Programme in order to 290 provide a high-level summary view of the T2S Programme Plan. 291 5.3 T2S Critical Path 292 The critical path is the sequence of activities/tasks with the longest overall duration, determining 293 the shortest time possible to complete the programme. 294 The T2S Detailed Plan documents the critical path for the Eurosystem activities and includes 295 some external dependencies such as activities of Contracting CSDs. Building the critical path for 296 external dependencies requires a series of assumptions, as the plan cannot reflect detailed 297 dependencies with each Contracting CSD. The Eurosystem provides all such assumptions (Annex 298 4 to this Schedule) when providing the T2S Detailed Plan. The T2S Detailed and T2S Operational 299 Plan highlights (MS Project) the tasks belonging at the critical path in red. The critical path may 300 change because of updates of the T2S Detailed Plan. 301 6 Monitoring frameworks 302 The next sections define supporting materials and the methodology followed to assess progress 303 and report the risks and issues. 304 Section 7 describes the underlying process.
AutoNDA by SimpleDocs

Related to T2S Executive Summary Plan

  • Executive Summary Contractor shall, upon request by NASPO ValuePoint, provide NASPO ValuePoint with an executive summary that includes but is not limited to a list of states with an active Participating Addendum, states with which Contractor is in negotiations, and any Participating Addendum roll-out or implementation activities and issues. NASPO ValuePoint and Contractor will determine the format and content of the executive summary.

  • Staffing Plan The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Business Continuity Plan The Warrant Agent shall maintain plans for business continuity, disaster recovery, and backup capabilities and facilities designed to ensure the Warrant Agent’s continued performance of its obligations under this Agreement, including, without limitation, loss of production, loss of systems, loss of equipment, failure of carriers and the failure of the Warrant Agent’s or its supplier’s equipment, computer systems or business systems (“Business Continuity Plan”). Such Business Continuity Plan shall include, but shall not be limited to, testing, accountability and corrective actions designed to be promptly implemented, if necessary. In addition, in the event that the Warrant Agent has knowledge of an incident affecting the integrity or availability of such Business Continuity Plan, then the Warrant Agent shall, as promptly as practicable, but no later than twenty-four (24) hours (or sooner to the extent required by applicable law or regulation) after the Warrant Agent becomes aware of such incident, notify the Company in writing of such incident and provide the Company with updates, as deemed appropriate by the Warrant Agent under the circumstances, with respect to the status of all related remediation efforts in connection with such incident. The Warrant Agent represents that, as of the date of this Agreement, such Business Continuity Plan is active and functioning normally in all material respects.

  • Training Plan 19.6.1 An apprentice shall be a party to an individual Training Plan. 19.6.2 The Training Plan sets out the training that the apprentice will do both on – the – job and off – the – job. The Training Plan also sets out how the Registered Training Organisation (RTO) will ensure the apprentice will receive quality training – both on – the – job and off – the – job. 19.6.3 The Training Plan reflects the choices made by the employer and the apprentice in relation to:-

  • Transition Plan In the event of termination by the LHIN pursuant to this section, the LHIN and the HSP will develop a Transition Plan. The HSP agrees that it will take all actions, and provide all information, required by the LHIN to facilitate the transition of the HSP’s clients.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Program Description The employer agrees to provide a vision benefit to eligible employees and dependents. The vision benefit provided by the State shall have an employee co-payment of $10 for the comprehensive annual eye examination and $25 for materials.