Technical Assistance for Dam Safety Components. Provision of technical assistance to the staff of the EPBiH PIU for: (i) studies to confirm the design of the rehabilitation measures, help the PIU prepare the bidding documents for the dam safety components, assist in the procurement process and evaluation of bids, and monitor Project implementation; and (ii) the review and evaluation of dam operation and maintenance procedures, including a review of existing dam safety plans, and assistance in upgrading these as may be necessary. Part B: EPHZHB
Technical Assistance for Dam Safety Components. Provision of technical assistance to the staff of the EPRS PIU for: (i) studies to confirm the design of the rehabilitation measures, help the PIU prepare the bidding documents for the dam safety components, assist in the procurement process and evaluation of bids, and monitor Project implementation; and (ii) the review and evaluation of dam operation and maintenance procedures, including a review of existing dam safety plans, and assistance in upgrading these as may be necessary. Part D: Project Activities Financed by Co-financiers 1. HPP Supporting Equipment (a) HPP Supporting Equipment (EPBiH) (i) HPP Grabovica – reconstruction of 220 kV switchgear; reconstruction of 35 kV facilities; rehabilitation and modernization of dam monitoring systems; (ii) HPP Salakovac – reconstruction of 220 kV switchgear; reconstruction of 35 kV facilities; rehabilitation and modernization of dam monitoring systems; and (iii) HPP Jablanica – replacement of primary equipment for the 35/0.4 Brana transformer station and the 35/0.4 entry building transformer station. (b) HPP Supporting Equipment (EPHZHB) (i) HPP Capljina – 35 kV switchgear replacement; replacement of 220 kV voltage measuring and current measuring transformers and surge arresters; replacement of 220 kV oil cables; and excitation system replacement; and (ii) HPP Rama – 220 kV transmission substation enlargement; and rehabilitation of one turbine, generator and block transformer unit. (c) HPP Supporting Equipment (EPRS) (i) HPP Visegrad – replacement of 400 kV voltage measuring and current measuring transformers; oil regulation system rehabilitation; and introduction of monitoring, automatization and remote control systems for three 105 MW generating sets and other high voltage equipment; (ii) HPP Bocac – reconstruction and rehabilitation of the 110 kV plant; and replacement of UPS, excitation systems, turbine regulation for the 2x55 MW generating sets, water cooling system and the plant control system. 2. HPP Works (a) HPP Works (EPBiH) (i) HPP Grabovica – repairs to address dam leakages; (ii) HPP Salakovac - repairs to address dam leakages; and (iii) HPP Jablanica – installation of monitoring system and rehabilitation of the “Kukovi” landslide. (b) HPP Works (EPHZHB) (c) HPP Works (EPRS) (i) HPP Trebinje – repairs to address dam leakages; (ii) HPP Visegrad – repairs to address dam leakages; and (iii) HPP Bocac – augmenting of spillway capacity. 3. Distribution Systems (EPBiH, EPHZHB and EPRS) 4. Distribution SCA...

Related to Technical Assistance for Dam Safety Components

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Technical Assistance DFPS may provide informal support, guidance, clarification, and other forms of technical assistance via phone, email, and virtual meeting to resolve Grant or performance compliance issues. Grantee will document all such instances of technical assistance by DFPS in writing, including any implementation work.

  • Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Peer Assistance and Review (PAR) Consulting Teachers (CT) will be assigned to all new teachers with no prior teaching experience and tenured teachers rated ineffective on the qualitative measures at the end of the previous school year and recommended by the PAR Panel. Evaluations for Probationary and Ineffective Teachers:

  • Third Party Components The Products and Services may contain third party components (including open source software) subject to separate license agreements. To the limited extent a third party license expressly supersedes this XXXX, such third party license governs Customer’s use of that third party component.

  • Directory Assistance Service Updates 8.3.3.1 BellSouth shall update end user listings changes daily. These changes include: 8.3.3.1.1 New end user connections 3.3.1.2 End user disconnections

  • Payments for Distribution Assistance and Administrative Support Services (a) Payments to the Distributor. In consideration of the payments made by the Fund to the Distributor under this Plan, the Distributor shall provide administrative support services and distribution services to the Fund. Such services include distribution assistance and administrative support services rendered in connection with Shares (1) sold in purchase transactions, (2) issued in exchange for shares of another investment company for which the Distributor serves as distributor or sub-distributor, or (3) issued pursuant to a plan of reorganization to which the Fund is a party. If the Board believes that the Distributor may not be rendering appropriate distribution assistance or administrative support services in connection with the sale of Shares, then the Distributor, at the request of the Board, shall provide the Board with a written report or other information to verify that the Distributor is providing appropriate services in this regard. For such services, the Fund will make the following payments to the Distributor:

  • Quality Assurance Program An employee shall be entitled to leave of absence without loss of earnings from her or his regularly scheduled working hours for the purpose of writing examinations required by the College of Nurses of Ontario arising out of the Quality Assurance Program.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order. (b) The technical evaluation committee may call the responsive bidders for discussion or presentation to facilitate and assess their understanding of the scope of work and its execution. However, the committee shall have sole discretion to call for discussion / presentation. (c) Financial bids of only those bidders who qualify the technical criteria will be opened provided all other requirements are fulfilled. (d) AIIMS Jodhpur shall have right to accept or reject any or all tenders without assigning any reasons thereof.

  • Contractor Licensing, etc. Notwithstanding Section 14.c, District may terminate this Contract immediately by written notice to Contractor upon denial, suspension, revocation, or non-renewal of any license, permit, or certificate that Contractor must hold to provide services under this Contract.