TEST PROTOCOL. It is the set of documents submitted by the CONCESSIONAIRE containing the tests established in paragraph 13, the results of which shall be submitted by the CONCESSIONAIRE to the DGPPC.
AutoNDA by SimpleDocs
TEST PROTOCOL. 13.1. The CONCESSIONAIRE must deliver to the DGPPC the TEST PROTOCOLS carried out during the commissioning for the SUPERVISION and final acceptance of the commitment of each of the BASE STATIONS: ● Installation, Commissioning and Initial Tuning Tests. ● Site Optimization Testing. 13.2. Prior to the performance of the Tests, the CONCESSIONAIRE must submit to the DGPPC a Checklist format of the parameters of the Test Protocols for the Commissioning of the first BASE STATION, such protocols are: i) Installation, Commissioning and Initial Tuning Test Protocols, and ii) Site Optimization Test Protocol, within a maximum term of ten (10) months from the CLOSING DATE and prior to the implementation of the first BASE STATION. The DGPPC must evaluate it within a maximum period of ten (10) working days thereafter, and in case of observation it must be corrected by the CONCESSIONAIRE, within the term granted for such purpose by the DGPPC. After the approval of the Test Protocol Checklist, the CONCESSIONAIRE shall run the Tests, the results of which shall be submitted to the DGPPC within the term established in paragraph 16.4.
TEST PROTOCOL. The XXXX system will be tested for up to a three (3) day duration to evaluate the separation and operational performance. 1. Testing will commence immediately or as soon as practical upon completion of installation. 2. The XXXX system will be started up and operated by SRS personnel for the entire testing duration. 3. The individual systems will be evaluated and monitored including validation of proper operation of the following components: 4. The Performance Test Criteria are as specifically detailed as follows: *** *** *** *** *** ***
TEST PROTOCOL. Owner shall, at its sole cost and expense, develop a test protocol applicable to the Testing (the “Test Protocol”). In the Test Protocol Owner shall specify which of the Plant’s CTs will be used for the Testing.
TEST PROTOCOL. The CONCESSIONAIRE must deliver to the DGPPC, the TEST PROTOCOL carried out during the Commissioning for the SUPERVISION and the final acceptance of the commitment of each of the BASE STATIONS, it must contain: ● Installation and Commissioning Testing and Initial Tunning. ● Site Optimization Testing.
TEST PROTOCOL. The program for testing the Technology set forth in Exhibit D to this Agreement.

Related to TEST PROTOCOL

  • Test procedure The engine speed shall be gradually increased from idle to the target engine speed, not exceeding the tolerance band of ±3 per cent of the target engine speed, and held constant. Then the throttle control shall be rapidly released and the engine speed shall be returned to idle. The sound pressure level shall be measured during a period of operation consisting of a maintaining constant engine speed of 1 second and throughout the entire deceleration period. The maximum sound level meter reading during this period of operation, mathematically rounded to the first decimal place, is taken as the test value.

  • Test Procedures For an Asset Review, the Asset Representations Reviewer will perform for each Asset Review Receivable the procedures listed under “Procedures to be Performed” in Schedule A for each representation and warranty (each, a “Test”), using the Asset Review Materials listed for each such Test in Schedule A. For each Test and Asset Review Receivable, the Asset Representations Reviewer will determine if the Test has been satisfied (a “Test Pass”) or if the Test has not been satisfied (a “Test Fail”).

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement and calculations following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation manual) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed Measurement and Verification Plan to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements and calculations, based on the M&V protocol for pre-install • Prepare and provide a Pre-Installation Measurement and Verification Findings Report which includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation manual) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and greenhouse gas emissions. • Prepare and provide a Post-Installation Measurement and Verification Findings Report that includes M&V protocol, pre and post install measurements and calculations, analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of greenhouse gas emissions that directly result from this project.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • Interoperability To the extent required by applicable law, Cisco shall provide You with the interface information needed to achieve interoperability between the Software and another independently created program. Cisco will provide this interface information at Your written request after you pay Cisco’s licensing fees (if any). You will keep this information in strict confidence and strictly follow any applicable terms and conditions upon which Cisco makes such information available.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!