Third Stage Submittal Sample Clauses

Third Stage Submittal. Complete system documentation, in the form of operation and maintenance manuals, shall be provided. Manuals shall include complete product instruction books for each item of equipment furnished. Where instruction booklets cover more than one specific model or range of instrument, product data sheets shall be included which indicate the instrument model number, calibrated range, and all other special features. A complete set of "as-built" wiring, fabrication, and interconnection drawings shall be included with the manuals. In addition, an electronic copy of all drawings shall be submitted to JEA. Electronic drawing files shall be AutoCAD Release 14 format.

Related to Third Stage Submittal

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

  • Bidding Phase 2.8.1 The Professional, following the Owner's approval of the Construction Document Phase, shall assist the Owner in obtaining bids and in award and preparation of Construction Contracts. 2.8.2 The Professional shall attend the bid opening and furnish a suitably detailed tabulation sheet for recording the name of each Bidder, the Bidder's Certificate of Responsibility Number, Bid Security, Base Bid, Alternates, and remarks. The Professional shall furnish sufficient tabulation sheets for all in attendance. Immediately after receipt of bids, the Professional shall submit to the Owner a certified tabulation of all bids received, along with his recommendation as to Contract award. 2.8.3 The Professional, following the award of a Construction Contract, shall prepare and submit to the Owner, two (2) copies of updated Construction Documents (Plans/Specifications). Each copy shall be marked OFFICIAL CONTRACT DOCUMENTS and shall include an executed bid Proposal Form, Agreement Form, Contract Bond, Power of Attorney, Certificate of Insurance, all bulletins, Addenda, and supplemental Drawings. One (1) copy shall be retained by the Owner, one (1) copy shall be for the Contractor. Any other contract document guidelines will be distributed to the Professional at the bid opening. 2.8.4 The Professional shall also furnish the area and volume of the building computed in accordance with criteria of the American Institute of Architects; and the square foot and cubic foot costs of only the building, the mechanical system, the electrical system, special built-in equipment, and the total Project cost. 2.8.5 The Professional shall, unless waived by the Owner, also submit one electronic format copy of the updated Contract Documents (plans and specifications) in coordination with said Contract Documents in 2.8.3 above. Said electronic submittal to be submitted within thirty (30) days after award by Owner in .pdf format. The actual cost of the electronic submittal shall be paid by the Owner, with cost approval by the Owner before printing is ordered in accordance with 3.4.

  • Project Closeout a. Participate in final inspection to prepare punch lists for project contractor to correct and/or to complete listed items. Verify that items on punch lists have been completed successfully assist COUNTY Project Manager or designee to determine completion date and coordinate project close out. a. Coordinate the preparation, acceptance and distribution of project closeout documents in accordance with COUNTY Project Manager or designee procedures to clients.

  • Submittal Schedule Within sixty days after the Effective Date of the Contract, the Contractor shall prepare and submit a Submittal Schedule for review and approval of the Design Professional. In establishing the Submittal Schedule the Contractor shall take into account large submittal documents that will require longer review times, e.g., submittals with over fifty sheets of drawings. The Design Professional’s approval shall be based on conformance of the Submittal Schedule with the Overall Project Schedule, subject to change from time to time in accordance with the progress of the Work.

  • Timeline Contractor must perform the Services and deliver the Deliverables according to the following timeline: