Time of Moderation Sample Clauses

Time of Moderation. The Moderation ordinarily takes place in the second semester of the sophomore year. Transfer students entering with the equivalent of two full years of credit should, if possible, be moderated during the first semester of residence, but in no case later than the second. In order to be considered for Moderation, a student must have achieved eligibility for quantitative courses. To ensure sufficient lead time for students and advisers, an academic xxxx and/or the registrar will survey students at the beginning of the sophomore year, and again at the beginning of the second semester of sophomore year, gathering information on each student’s intended concentration or program. An academic xxxx or the registrar should recommend changes in adviser when appropriate (for example, when the adviser is not a member of the program in which the student intends to major) and, when appropriate, provide students with information about program requirements. In order to postpone Moderation one semester, a student must obtain the written approval of his or her adviser. Postponing Moderation a second semester requires the approval of the Faculty Executive Committee; without such approval a student is to be reviewed by the Faculty Executive Committee. For double majors (students who moderate in two separate disciplines and intend to complete two Senior Projects), the second Moderation may occur in the second semester of the sophomore year or in either semester of the junior year. No student who has not moderated in the appropriate program may register to start a Senior Project.
AutoNDA by SimpleDocs

Related to Time of Moderation

  • Method of Measurement The harmonics emission on AC power lines generated by the vehicle representative of its type shall be measured using the method described in Annex 11. The method of measurement shall be defined by the vehicle manufacturer in accordance with the Technical Service.

  • TIME OF COMPLETION The Owner shall issue a Notice to Proceed identifying the date for commencement of the Work. The commencement date shall be 10 or more days after the date the notice is issued. The Contractor shall achieve substantial completion of the Work within _____________________ (____) calendar days after the commencement date, as such completion date may be extended by approved Change Orders. The time set forth for completion of the Work is an essential element of the Contract.

  • DOMESTIC PREFERENCES FOR PROCUREMENTS To the extent applicable, Supplier certifies that during the term of this Contract will comply with applicable requirements of 2 C.F.R. § 200.322.

  • TIME OF COMMENCEMENT AND COMPLETION 2.1 The Contractor shall commence the Work upon the date established in the Notice to Proceed.

  • Change Order Conditions All Change Orders are issued under the following conditions and shall contain the following language as appropriate:

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Methods of Measurement The methods used to identify the educational strengths and needs of students are set forth in the approved Application.

  • 200 Domestic Preferences for Procurements As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award. For purposes of 2 CFR Part 200.322, “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stag through the application of coatings, occurred in the United States. Moreover, for purposes of 2 CFR Part 200.322, “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum, plastics and polymer-based products such as polyvinyl chloride pipe, aggregates such as concrete, glass, including optical fiber, and lumber. Pursuant to the above, when federal funds are expended by ESC Region 8 and TIPS Members, Vendor certifies that to the greatest extent practicable Vendor will provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). Does vendor agree? Yes

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Particular Methods of Procurement of Goods Works and Services (other than Consultants’ Services)

Time is Money Join Law Insider Premium to draft better contracts faster.