Topographic Surveys. A- E shall perform Topographic Surveys to provide necessary design and analysis information in support of the operations and projects of Orange County Public Works and other contract agencies. CADD drawings shall adhere to OC Survey Topographic Standards.
Topographic Surveys. Horizontal and vertical spatial relation of natural and manmade features including underground utilities.
Topographic Surveys. While some survey data is available, Engineer will provide additional field survey data for pavement and drainage improvements, and this survey will be tied to the Owner’s control network. In addition, Engineer shall establish control points for use during construction.
Topographic Surveys. (a) The Consultant shall undertake fresh topographic surveys of the new terminal locations or proposed expansion of existing terminal sites etc for preparation of lay-outs, General Arrangement (GA) Drawings, sections and elevations etc. These surveys shall be carried out up to the water line during the survey period as per standard norms and practices. Topographic survey of proposed new connectivity with road and rail (if feasible) shall also be undertaken;
(b) Apart from the main terminal area, the Topographic Survey will also be carried out in approximately 1 km downstream and 1 km upstream areas between the HFL line and the water line during the survey period on both the banks;
(c) The Consultant shall also carry out Topographic Survey required for preparation of lay- outs, GA Drawings, sections and elevations etc in respect of all other facilities/projects/ sub-projects (e.g. vessel repair facility, proposed sites for bank protection sites etc) proposed in the DPR as per the requirement; and
(d) The Topographic Survey charts shall be prepared in the scale of 1:1000 and these will include spot levels in a grid of 25 m as well as other physical features (such as structures / houses, trees, natural drains etc.) and contours. Both hard and soft copies of survey charts as well as raw data shall be submitted to the EIC as per normal practice.
Topographic Surveys. A-E shall perform Topographic Surveys in conformance with COUNTY SURVEYOR needs and standards. Topographic Surveys are required to provide necessary design and analysis information and in support of DISTRICT and COUNTY public works operations and projects.
Topographic Surveys. Portions of the land within the project area had been surveyed in prior projects, but additional surveys were required. The Humboldt County Public Works (HCPW) Department collected topographic surveys on parcels adjacent to the culvert, and M&T crews collected topography, channel profile, and cross section data upstream to station 69+00 and downstream to the Xxxxxx property. The resulting topographic surface provided the basis for hydraulic modeling and conceptual designs (Figure 10). We also obtained and orthorectified the 2001 aerial photographs from the Humboldt Bay Harbor, Recreation, and Conservation District for use as a basemap (Figure 10).
Topographic Surveys. May 26 -
Topographic Surveys. This scope does not include right-of-way surveys or mapping, parcel boundaries or identification of easements. Dokken Engineering will use readily available GIS right of way information for the PSR Equivalent phase. Dokken Engineering will provide topographic surveying services. Survey control will be established on both Fairmount Avenue and Aldine Drive and tied together in a project network. Land surveys will be tied to the City of San Diego benchmark and based horizontally on the North American Datum of 1983 (NAD83); and vertically on the National Geodetic Vertical Datum of 1929 (NGVD29). Topographic mapping will be at a 40-scale with 1-foot contours. Ground surveys include cross sections of Aldine Drive at 25ft sections EP to EP and utilities within Aldine Drive. Aerial mapping limits extend approximately 300ft to the north and south of the bridges on Fairmount Avenue and approximately 200ft to the east and 500ft to the west of the bridges on Aldine Drive. All survey files shall be prepared in accordance with the City’s Citywide CADD Standards and adhere to the City’s MicroStation level and attribute structure
Topographic Surveys. No topographic survey provided or required.
Topographic Surveys. Horizontal and vertical datum will be established at the site utilizing GPS survey equipment. Three control points will be set for use during the construction. Topographic survey will include the roadway for 350' in each direction from the bridge. Stream cross-sections will be taken at each bridge face and at 100', 500' and 1000' from the bridge. Photographs of the project locations will be taken for use in the design. Right-of-way lines will be indicated on the survey based on monumentation located in the field and the Department's mapping/records of the right-of-way width.