Unit Adjunct Faculty II Workload Sample Clauses

Unit Adjunct Faculty II Workload. 1. teaching Faculty. the minimum-workload offered to unit adjunct faculty II shall be six (6) credit or contact hours per semester and shall not exceed ten (10) credit or contact hours each semester without the written approval of the Vice President of teaching, Learning and student Development and the Association within 48 hours of the request from the xxxx provided such hours are available and the faculty member is qualified to teach them. Such approved load shall never exceed twelve (12) credit or contact hours, except as set forth in Appendix C-6 Letter of Agreement Regarding excess Load for Unit Adjunct Faculty.
AutoNDA by SimpleDocs
Unit Adjunct Faculty II Workload 

Related to Unit Adjunct Faculty II Workload

  • Faculty Workload The workload of faculty includes student advising, maintaining and improving expertise in a discipline and in pedagogy, serving on departmental and university committees, contributing to student growth and development, evaluating student performance, scholarly activities, and service to university and community, as well as teaching and class preparation. Additionally, as a professional, a faculty member shall devote a substantial amount of his/her workload to course preparation, research, the maintenance of professional expertise, innovations in teaching/learning and other similar activities. These endeavors shall comprise the faculty member’s workload.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • UNIT WORK When the Employer deems it necessary in order to carry out a mission and operations of the campus, the Employer may contract out work provided that the contracting out does not displace bargaining unit employees or reduces their scheduled hours. The Maine Community College shall notify MSEA-SEIU when contracting out is to be implemented. MSEA-SEIU may request to meet and confer on the impact on contracting out such work. The Maine Community College shall meet with MSEA- SEIU within thirty (30) days of such request. Notice to MSEA-SEIU shall be not later than one hundred twenty (120) days prior to the commencement of the contracting out. In emergency circumstances, when the College enters into a contract under which contracting out will commence in less than thirty (30) days, when possible, notification shall be made two (2) weeks prior to implementing the contract, but in no event later than ten (10) working days after the commencement of the contracting out. Prior to the meeting and conferring on contracting out, the Maine Community College System will provide MSEA-SEIU all relevant written information, including copies of bids received, any cost analysis used by the College to evaluate the need for contracting out, and all other relevant material used by the College in making its decision regarding contracting out. Contracting out of the type of work normally performed by existing bargaining unit members for limited periods not to exceed six (6) months shall be allowed without the Union’s agreement if one or more of the following conditions are present at the affected campus or other non-campus location (such as the System Office in Augusta):

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Employee Workload ‌ The Employer shall ensure that an employee’s workload is not unsafe as a result of employee absence(s). Employees may refer safety related workload concerns to the Occupational Health and Safety Committee for investigation under Article 22.3 (Occupational Health and Safety Committee).

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Unsafe Work (a) An employee may exercise their right to refuse to do unsafe work pursuant to Section 3.12 of the Occupational Health and Safety Regulations outlined in Information Appendix B.

Time is Money Join Law Insider Premium to draft better contracts faster.