Verification of Energy Savings Sample Clauses

Verification of Energy Savings. The goal of this subtask is to document expected annual energy savings from participating projects, based on field verification of actual installed improvements; provide informative summary reports. The Contractor shall: • Establish on a per building basis minimum energy efficiency thresholds, project reporting procedures, verification protocols, and energy and carbon savings calculation methodologies. These elements will be incorporated into the implementation plan. • Develop a regional web-based tracking and reporting system for project results and environmental benefits. The Energy Commission will be granted real-time access and tracking system results will populate Retrofit Bay Area’s monthly performance reports. • Collect estimated energy savings from the post retrofit HERS II rater verification • Coordinate with CEC/DOE audit processCollaborate with the utility incentive programs to assemble detailed project-specific data to support ARRA reporting and the CPUC’s EM&V efforts, including energy usage and GHG emissions reductions, renewable energy generation, jobs created, number and amount of projects financed, number of contractors/workers trained, number of buildings and residences retrofitted, and utility xxxx savings by participants. Project-specific data will include pre- and post-retrofit home performance test results and billing data.
AutoNDA by SimpleDocs
Verification of Energy Savings. If applicable, the Design Documents shall set forth appropriate systems and procedures for measuring and verifying the actual energy savings resulting from the implementation of an ECO. At the Customer's request, the Company shall assist the Customer in measuring and verifying such energy savings with respect to each ECO following the Final Acceptance Date. The Company's compensation for such Services shall be included in the compensation to be paid to the Company pursuant to Schedule E.

Related to Verification of Energy Savings

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Account Verification Whether or not a Default or Event of Default exists, Agent shall have the right at any time, in the name of Agent, any designee of Agent or any Borrower, to verify the validity, amount or any other matter relating to any Accounts of Borrowers by mail, telephone or otherwise. Borrowers shall cooperate fully with Agent in an effort to facilitate and promptly conclude any such verification process.

  • Cost Savings Developer shall work cooperatively with Architect, Construction Manager, subcontractors and District, in good faith, to identify appropriate opportunities to reduce the Project costs and promote cost savings. Any identified cost savings from the Guaranteed Maximum Price shall be identified by Developer, and approved in writing by the District. In the event Developer realizes a savings on any aspect of the Project, such savings shall be added to the Contingency and expended consistent with the Contingency. In addition, any portion of Allowance remaining after completion of the Project shall be added to the Contingency. If any cost savings require revisions to the Construction Documents, Developer shall work with the District and Architect with respect to revising the Construction Documents and, if necessary, obtaining the approval of DSA with respect to those revisions. Developer shall be entitled to an adjustment of Contract Time for delay in completion caused by any cost savings adopted by District pursuant to Exhibit D, if requested in writing before the approval of the cost savings.

  • E-Verification If applicable, Contractor represents and warrants that it will ensure its compliance with the Mississippi Employment Protection Act of 2008, and will register and participate in the status verification system for all newly hired employees. Mississippi Code Annotated §§ 71-11-1 et seq. The term “employee” as used herein means any person that is hired to perform work within the State of Mississippi. As used herein, “status verification system” means the Illegal Immigration Reform and Immigration Responsibility Act of 1996 that is operated by the United States Department of Homeland Security, also known as the E-Verify Program, or any other successor electronic verification system replacing the E-Verify Program. Contractor agrees to maintain records of such compliance. Upon request of the State and after approval of the Social Security Administration or Department of Homeland Security when required, Contractor agrees to provide a copy of each such verification. Contractor further represents and warrants that any person assigned to perform services hereafter meets the employment eligibility requirements of all immigration laws. The breach of this agreement may subject Contractor to the following:

  • Medical Verification The Town may require medical verification of an employee’s absence if the Town perceives the employee is abusing sick leave or has used an excessive amount of sick leave. The Town may require medical verification of an employee’s absence to verify that the employee is able to return to work with or without restrictions.

  • Electronic Visit Verification (EVV). Provider shall cooperate with State requirements for electronic visit verification for personal care services and home health services, as applicable.

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Contractor Performance Evaluations The Contract Administrator will evaluate Contractor’s performance as often as the Contract Administrator deems necessary throughout the term of the contract. This evaluation will be based on criteria including the quality of goods or services, the timeliness of performance, and adherence to applicable laws, including prevailing wage and living wage. City will provide Contractors who receive an unsatisfactory rating with a copy of the evaluation and an opportunity to respond. City may consider final evaluations, including Contractor’s response, in evaluating future proposals and bids for contract award.

  • Employee Verification In accordance with Neb. Rev.

  • Electronic Visit Verification ("EVV Provider shall cooperate with State requirements for electronic visit verification for personal care services and home health services, as applicable.

Time is Money Join Law Insider Premium to draft better contracts faster.