Work Staging and Phasing Sample Clauses

Work Staging and Phasing. The Work to be performed shall be done in such a manner so as not to interfere with the normal City operations of the Project site or facility. The manner in which the Work is performed shall be subject to the approval of the Project Manager and Consultant, whom if necessary, shall have the authority to require changes in the manner in which the Work is performed. There shall be no obstruction of City services without the prior written approval of the Project Manager or Consultant. All requests for such interruption or obstruction must be given in writing to the Project Manager or Consultant 24 hours in advance of the interruption of City operations. The Design-Build Firm shall familiarize itself with normal City operations where the Work is to be performed so that it can conduct the Work in the best possible manner to the complete satisfaction of the Project Manager and Consultant. A staging plan must be submitted to and approved by the Project Manager or the Consultant prior to the start of construction and issuance of the Notice to Proceed. Such staging plan shall be revised and resubmitted as necessary during construction.
AutoNDA by SimpleDocs
Work Staging and Phasing. ‌ The Construction Work to be performed shall be done in such a manner so as not to interfere with the Adjacent Development Work or the Separate Contractors’ work. The manner in which the Work is performed shall be subject to the approval of the City’s Project Manager or Consultant, whom if necessary, shall have the authority to require changes in the manner in which the Work is performed. There shall be no obstruction of City services without the prior written approval of the City’s Project Manager. All requests for such interruption or obstruction must be given in writing to the City’s Project Manager 24 hours in advance of the interruption of City operations. The Construction Manager shall familiarize itself with normal City operations where the Construction Work is to be performed so that it can conduct the Construction Work in the best possible manner to the complete satisfaction of the Consultant and the City’s Project Manager. A staging plan must be submitted to and approved by the City’s Project Manager or the Consultant prior to the start of construction and issuance of the Notice to Proceed. Such staging plan shall be revised and resubmitted as necessary during construction.
Work Staging and Phasing. The Work to be performed shall be done in such a manner so as not to interfere with the normal Town operations of the Project site or facility. The manner in which the Work is performed shall be subject to the approval of the Project Manager, whom if necessary, shall have the authority to require changes in the manner in which the Work is performed. There shall be no obstruction of Town services without the prior written approval of the Project Manager. All requests for such interruption or obstruction must be given in writing to the Project Manager 24 hours in advance of the interruption of Town operations. The Contractor shall familiarize itself with normal Town operations where the Work is to be performed so that it can conduct the Work in the best possible manner to the complete satisfaction of the Project Manager. A staging plan may be submitted to and approved by the Project Manager prior to the start of construction and issuance of the Notice to Proceed. Such staging plan shall be revised and resubmitted as necessary during construction.
Work Staging and Phasing. The manner in which the Work is performed shall be subject to the approval of the Project Manager and DERM, whom if necessary, shall have the authority to require changes in the manner in which the Work is performed. There shall be no obstruction public roadways or any City operations without the prior written approval of the Project Manager. All requests for such interruption or obstruction must be given in writing to the Project Manager 24 hours in advance of the interruption or obstruction. The Project Manager shall issue a separate Notice to Proceed will be issued for each Phase of the Project. A staging plan for the storage of equipment and hauling must be submitted to and approved by the Project Manager prior to the start of construction and issuance of the Notice to Proceed for Phase IV. Such staging plan shall be revised and resubmitted as necessary during the performance of the Work. No staging of trucks will be permitted on public roads or the public right of way.
Work Staging and Phasing. ‌‌ Contractor shall be responsible for the staging and phasing of all Work and the Project Manager shall not have any responsibility of liability for the Contractor’s actions or its means and methods. The Contractor shall familiarize itself with Project site where the Work is to be performed so that it can conduct the Work in the best possible manner.

Related to Work Staging and Phasing

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.

  • Uncovering and Correction of Work 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 9.1.2

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • WORK ACCESS The Association shall provide a current, written list of its Association Representatives to all heads of departments, offices, or bureaus represented herein and the CAO. The Association shall be responsible for keeping the list current. An Association Representative shall have access to department, office, or bureau facilities where Unit members are employed during regular working hours to assist employees covered under this MOU in addressing grievances when such Association assistance is requested by a grievant(s) or to investigate matters arising out of the application of the provisions of this MOU. The Association Representative shall request authorization for such visits by contacting the designated Management representative of the head of the office, department, or bureau. In the event immediate access cannot be authorized, the designated Management representative shall inform the Association Representative as to the earliest time when access can be granted. This Article shall not be construed as a limitation on the power of the head of a department, office, or bureau to restrict access to areas designated for security or confidential purposes.

  • Commencement and Completion of Work Upon the Effective Date of the Contract, bidder agrees to commence all Preconstruction Activities. Upon issuance of a Proceed Order, bidder agrees to commence physical activities on the Site with adequate forces and equipment and to complete to Material Completion all work in 90 consecutive calendar days beginning the day after the date of the Proceed Order. Bid Bond. Enclosed herewith is a Bid Bond (NO OTHER FORM ACCEPTABLE) in the amount of Dollars ($ ) (being not less than five percent of the Bid). Bidder agrees that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by bidder’s failure to execute the Contract or to furnish the Performance and Payment Bonds should bidder’s bid be accepted. Obligation of Bid Bond. If this bid is accepted within thirty-five days after the date set for the opening of bids and bidder fails to execute the Contract within ten days after Notice of Successful Bid, or if bidder fails to furnish both Performance and Payment Bonds, the obligation of the Bid Bond will remain in full force and effect and the money payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the obligations of the Bid Bond will be null and void. Bidder Certification Certification under Oath. Under oath I certify that I am a principal or other representative of the bidder, and that I am authorized by it to execute the foregoing bid on its behalf; and further, that I am a principal person of the bidder with management responsibility for the construction for the bidder, and as such I am personally knowledgeable of all its pertinent matters. I further certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for the same services, materials, labor, supplies, or equipment and is in all respects fair and without collusion or fraud. Bidder and its principals understand that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. Bidder agrees to abide by all conditions of this bid. BY: Authorized Signature (BLUE INK) Printed Name Title Sworn to and subscribed before me this Day of , 20 . Notary Public My commission expires:

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

Time is Money Join Law Insider Premium to draft better contracts faster.