Working Group 1. The Parties hereby establish a Working Group on Temporary Entry for Business Persons, which shall meet at least once every 3 years or on request of the Free Trade Commission to consider any matter arising under this Chapter. 2. The Working Group's functions shall include: (a) to review the implementation and operation of this Chapter; (b) to consider the development of measures to further facilitate temporary entry of business persons on a reciprocal basis; (c) the identification of measures that affect the temporary entry of business persons under this Chapter; and (d) the observance of the issues established under Article 121 (Cooperation).
Working Groups From time to time, a Joint Committee may establish and delegate duties to sub-committees or directed teams (each, a “Working Group”) on an “as-needed” basis to oversee particular projects or activities (e.g., joint project team, joint finance group, or joint intellectual property group). Each such Working Group shall be constituted and shall operate as the Joint Committee determines; provided, that each Working Group shall have equal representation from each Party, unless otherwise mutually agreed. Working Groups may be established on an ad hoc basis for purposes of a specific project or on such other basis as the Joint Committee may determine. Each Working Group and its activities shall be subject to the oversight, review and approval of, and shall report to, the Joint Committee that formed said Working Group. In no event shall the authority of the Working Group exceed that specified for the Joint Committee that formed the Working Group. All decisions of a Working Group shall be by unanimous agreement. Any disagreement between the designees of AbbVie and Ablynx on a Working Group shall be referred to the Joint Committee that formed the Working Group for resolution.
Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.
Annual Production Program document describing the forecasts for Production and handling of Oil, Gas, water, special fluids, and waste arising from the Production process of each Development Area or Field.
Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.
TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.
Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").
Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.
Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.