Final Assembly Work definition

Final Assembly Work means the final assembly work for the completion of Turbine component assembly, as set forth in Exhibit P to the Supply Agreement, prior to the installation of the Turbine.
Final Assembly Work means final assembly and check-out of the KC-390 for Sales Work. “Fraud” means conduct including the following elements: (a) representation made of material fact, (b) that was untrue, (c) which the Party making the representation knew to be untrue at the time such representation was made, (d) with the intent to deceive and for the purpose of inducing the recipient to act upon it, (e) on which the recipient relied and (f) as a result of such reliance, the recipient suffered Losses. “Fundamental Representation” means the representations and warranties of each Member, as applicable, set forth in Sections 3.1(a) (Organization; Authorization), 3.1(b) (No Prior Operations or Liabilities), 3.1(c) (Sufficiency of IP), 4.1 (Incorporation; Authorization) and 4.5 (Brokers). “Governance Documents” means each of the Certificate of Formation and the LLC Agreement. 4 “Engineering Services Agreements” means the Engineering Services Agreements to be entered into by and between the Company and the other parties thereto, in accordance with the principles set forth in the Commercial Document Framework. “Excluded Orders” means (a) all orders from FAB for use by FAB, (b) any order that becomes an Additional Excluded Order in accordance with Section 5.9 and (c) the specific orders set forth on Schedule 1.1(a). “Executory Period Orders” means any In-Scope Business orders originated between the date hereof and the Closing; provided that such orders shall not include any order which is a Loss Order. “FAB” means the Brazilian Air Force (Força Aérea Brasileira). “FAB License” means a written, definitive, duly executed and binding agreement (not including a letter of intent or any other preliminary written agreement) with FAB permitting Embraer to license or sublicense to the Company, as the case may be, the Intellectual Property required to enable the Company to conduct the In-Scope Business in accordance with the Business Plan and to comply with its obligations under the Defense JV Commercial Agreements, which shall, in any case, with respect to all Intellectual Property related to the KC-390 in which FAB has rights, whether through ownership, contract, operation of law or otherwise, include (i) a license, (with the right to sublicense) or sublicense (with the further right to sublicense), as the case may be, which will be exclusive in the United States, to the Company for use of such Intellectual Property by the Company and the Members in the In-Scope Business, and (ii) a waiver or...
Final Assembly Work means final assembly and check-out of the KC-390 for Sales Work. “Fraud” means conduct including the following elements: (a) representation made of material fact, (b) that was untrue, (c) which the Party making the representation knew to be untrue at the time such representation was made, (d) with the intent to deceive and for the purpose of inducing the recipient to act upon it, (e) on which the recipient relied and (f) as a result of such reliance, the recipient suffered Losses. “Fundamental Representation” means the representations and warranties of each Member, as applicable, set forth in Sections 3.1(a) (Organization; Authorization), 3.1(b) (No Prior Operations or Liabilities), 3.1(c) (Sufficiency of IP), 4.1 (Incorporation; Authorization) and 4.5 (Brokers). “Governance Documents” means each of the Certificate of Formation and the LLC Agreement. 4

Examples of Final Assembly Work in a sentence

  • INDEMNIZACIÓN EN MATERIA DE SALUD YSEGURIDAD El Comprador acusará recibo de las Fichas de Seguridad suministradas por el Vendedor tal y como queda estipulado en las leyes y reglamentos vigentes, en esta Ficha se incluirán advertencias con toda la información sobre seguridad y salud referentes al Producto y /o los recipientes que contienen el Producto.

  • Purchaser shall (i) perform the Final Assembly Work which is set forth in Exhibit P hereto.

  • Purchaser shall complete the Final Assembly Work with respect to all Turbines in conformance with the procedures and requirements set forth in Exhibit P.

Related to Final Assembly Work

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Installation Works means, as the context so requires,

  • Electrical work Means any labor or material used in installing, altering, maintaining, or extending an electrical wiring system and the appurtenances, apparatus, or equipment used in connection with the use of electrical energy in, on, outside, or attached to a building, residence, structure, property, or premises. The term includes service entrance conductors as defined by the National Electrical Code.

  • Fabrication means making up data or results and recording or reporting them.

  • Project Improvements means site improvements and facilities that are:

  • General Assembly means the General Assembly of the United Nations.

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Tooling means tools funded or provided by the Buyer.

  • Additional Work to mean additions or deletions or modifications to the amount, type or value of the Work and Services as required in this Contract, as directed and/or approved by the County.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • DAY WORK means on item of work requiring the employment of labour with or without materials as the case may be, which, in the opinion of the Senior Engineer /Civil-in-charge, is not capable of being evaluated by the accepted methods of measurement or assessment and is paid for on the basis of the actual labour and materials utilised on the particular item of work referred to.

  • Design-build team means an entity that consists of:

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Nuclear installation means any installation of such class or description as may be prescribed by regulations made by the relevant Secretary of State from time to time by statutory instrument, being an installation designed or adapted for:

  • Construction Work means any work in connection with⎯

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Contractor Equipment means all appliances and things of whatsoever nature (other than temporary works) required for execution and completion of works and remedying of any defects, therein. But does not include plant, materials or other things intended to form or forming part of the permanent works.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;