Item Notes definition

Item Notes. LABOR RATES: Amount that the contractor will bill the Owner for services provided. Labor rates shall include all health and welfare benefits, insurance, taxes, overhead and profit, and all other applicable fringe benefits. $45.00 $45.00 Supervisor Enter the Labor Rate per "Hour" Quantity: 1 UOM: HR Price: Total:
Item Notes. LABOR RATES: Amount that the contractor will bill the Owner for services provided. Labor rates shall include all health and welfare benefits, insurance, taxes, overhead and profit, and all other applicable fringe benefits. $98.00 $98.00 Third Fencing Crew with Truck & Basic Tools Enter the Labor Rate per "Hour" Quantity: 1 UOM: HR Price: Total:
Item Notes. Enter the per "EACH" price that will be charged for service categorized as Right-of-Way. Price must include all labor, mobilization, materials, equipment, hauling, disposal, cleaning up work site and any other costs associated with doing such work. Total: Xxxxx Removal 13" to 18" Diameter - DBH, Right-of-Way Quantity: 1 UOM: EA Unit Price: $98.99 $98.99

Examples of Item Notes in a sentence

  • Price above rack adjustment (for example .02 per gallon) Item Notes: Vendor must indicate minimum amount if applicable.

  • Price above rack adjustment (for example .02 per $ gallon) Item Notes: Vendor must indicate minimum amount if applicable.

  • Install Cabinet such that the door of the Material, Installation, and Bid Item Notes for Permanent Traffic Data Acquisition StationsRevised November, 2012 cabinet faces the roadway.

  • Grout for inductive loop installation shall be non-shrink, shall meet the requirements of the Standard Specifications for Road and Bridge Construction, Material, Installation, and Bid Item Notes for Permanent Traffic Data Acquisition StationsRevised November, 2012 and shall be included on the KYTC Division of Materials, List of Approved Materials.

  • Saw Slot Sealant shall be non-shrink, non-stringing, moisture cure, polyurethane Material, Installation, and Bid Item Notes for Permanent Traffic Data Acquisition StationsRevised November, 2012 encapsulant suitable for use in both asphalt and concrete pavements.


More Definitions of Item Notes

Item Notes. An invoice showing the type of equipment AND cost of rental from 3rd Party Vendor may be requested with the final invoice to verify quoted price. Percentage Markup of Material, excluding freight. Quantity: 1 UOM: Percentage Total: Item Notes: An invoice showing the material type AND cost of material from 3rd Party Vendor may be requested with the final invoice to verify quoted price. Percentage Markup of Subcontractor Costs. Quantity: 1 UOM: Percentage Total: Item Notes: An invoice showing the amount charged by Subcontractor may be requested with the final invoice to verify quoted price. Emergency Services Quantity: 1
Item Notes. UOM: HR Price: Total: Emergency services are defined as those services which are specifically required after normal business hours (5:00pm - 7:00am). The City will not allow added cost when the Contractor's time is outside the normal business hours due to scheduling issues with the Contractor. Supplier Notes: 75$ an hour per man $75.00 $75.00
Item Notes. LABOR RATES: Amount that the contractor will bill the owner for services provided. Labor rates shall include all health and welfare benefits, insurance, taxes, overhead and profit, and all other applicable fringe benefits. $100.00 $100.00 Skilled Roofer-Certified Installer Enter the Labor Rate per "Hour" Quantity: 1 UOM: HR Price: Total:
Item Notes. LABOR RATES: Amount that the contractor will bill the owner for services provided. Labor rates shall include all health and welfare benefits, insurance, taxes, overhead and profit, and all other applicable fringe benefits. $80.00 $80.00 Percentage Markup of Rental Equipment Quantity: 1 UOM: Percentage Total:
Item Notes. Enter the per "EACH" price that will be charged for service categorized as Right-of-Way. Price must include all labor, mobilization, materials, equipment, hauling, disposal, cleaning up work site and any other costs associated with doing such work. Total: Xxxxx Removal 7" to 12" Diameter - DBH, Non- Right-of-Way Quantity: 1 UOM: EA Unit Price: $69.95 $69.95 Item Notes: Enter the per "EACH" price that will be charged for service categorized as Right-of-Way. Price must include all labor, mobilization, materials, equipment, hauling, disposal, cleaning up work site and any other costs associated with doing such work. Total: Xxxxx Removal 13" to 18" Diameter - DBH, Non- Right-of-Way Quantity: 1 UOM: EA Unit Price: $138.95 $138.95 Item Notes: Enter the per "EACH" price that will be charged for service categorized as Right-of-Way. Price must include all labor, mobilization, materials, equipment, hauling, disposal, cleaning up work site and any other costs associated with doing such work. Total: Xxxxx Removal 19" to 24" diameter - DBH, Non- Right-of-Way Quantity: 1 UOM: EA Unit Price: $169.95 $169.95 Item Notes: Enter the per "EACH" price that will be charged for service categorized as Right-of-Way. Price must include all labor, mobilization, materials, equipment, hauling, disposal, cleaning up work site and any other costs associated with doing such work. Total: Xxxxx Removal 25" to 30" Diameter - DBH, Non- Right-of-Way Quantity: 1 UOM: EA Unit Price: $315.99 $315.99
Item Notes. LABOR RATES: Amount that the contractor will bill the Owner for services provided. Labor rates shall include all health and welfare benefits, insurance, taxes, overhead and profit, and all other applicable fringe benefits. $45.00 $45.00 Percentage Markup of Rental Equipment Quantity: 1 UOM: EA Total: Item Notes: An invoice showing the equipment type AND cost of equipment from 3rd Party Vendor may be requested with the final invoice to verify quoted price. Percentage Markup of Material, Excluding Freight Quantity: 1 UOM: EA Total: Item Notes: An invoice showing the equipment type AND cost of equipment from 3rd Party Vendor may be requested with the final invoice to verify quoted price. Percentage Markup of Subcontractor Costs Quantity: 1 UOM: EA Total: Item Notes: An invoice showing the charged by a Subcontractor may be requested with the final invoice to verify quoted price. Emergency Services Quantity: 1 UOM: HR Price: Total: Item Notes: Emergency services are defined as those services which are specifically required after normal business hours (5:00pm - 7:00am). The City will not allow added cost when the Contractor's time is outside the normal business hours due to scheduling issues with the Contractor. $135.00 $135.00 Fill in the following Tables in the areas as shown. If an item does not apply, please do not make an entry in that column. Number of Working Days to Complete First Fencing Crew with Truck & Basic Tools $45.00 Second Fencing Crew with Truck & Basic Tools $45.00 Third Fencing Crew with Truck & Basic Tools $45.00 Emergency Services $135.00 Total Rental Equipment Costs 10% Total Materials Cost 5% Total Shipping/Freight Cost Sub No. 1 5% Sub No. 2 5% TOTAL ESTIMATED COST -- NOT TO EXCEED: $ Change Order #: Accepted: Not Accepted : Department Agency/Rep 1 Revised 11/21/2016
Item Notes. This list shall include all tires that you are authorized to sell.