Rated Capacity means the Average Daily Flow for which the Works are approved to handle;
Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.
Contract Capacity has the meaning set forth in Section 3.1(f).
Nominal Rated Capability means the nominal maximum rated capability in megawatts of a Transmission Interconnection Customer’s Customer Facility or the nominal increase in transmission capability in megawatts of the Transmission System resulting from the interconnection or addition of a Transmission Interconnection Customer’s Customer Facility, as determined in accordance with pertinent Applicable Standards and specified in the Interconnection Service Agreement.
Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.
Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.
Storage Capacity means any combination of space, injectability and deliverability.
Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;
System Capacity means the operational capacity of the Gathering System at any applicable point in time.
Rated Voltage means the manufacturer’s design voltage at which the transmission system is designed to operate or such lower voltage at which the line is charged, for the time being, in consultation with Transmission System Users;
Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.
Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.
Available RP Capacity Amount means (i) the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 7.06(d), (g), (h) and (l) minus (ii) the sum of the amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (A) make Restricted Payments in reliance on Sections 7.06 (g), (h) or (l), (B) incur Liens pursuant to Section 7.01(bb), (C) make Investments pursuant to Section 7.02(n), (D) incur Indebtedness pursuant to Section 7.03(y) and (E) make prepayments, redemptions, purchases, defeasances and other payments in respect of Junior Financings prior to their scheduled maturity utilizing the Available RP Capacity Amount pursuant to Section 7.13 plus (iii) the aggregate principal amount of Indebtedness prepaid prior to or substantially concurrently at such time, solely to the extent such Indebtedness (A) was secured by Liens pursuant to Section 7.01(bb) or (B) was incurred pursuant to Section 7.03(y) and not secured pursuant to Section 7.01(bb) (it being understood that the amount under this clause (iii) shall only be available for use under Sections 7.01(bb) and/or 7.03(y), as applicable).
RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes.
Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.
Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]
Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;
Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.
Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.
Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).
Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,
Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.
Bid Capacity meanss capacity offered by the bidder in his Bid under invitation.