Proof Consultant shall have the meaning set forth in Clause 10.2;
Proof Consultant shall have the meaning as set forth in Clause 10.2.2; “Provisional Certificate” shall have the meaning as set forth in Clause 12.2; “Punch List”shall have the meaning as set forth in Clause 12.2.1;
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; Contract AgreementPage 23 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH- 37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” (3rd Call) Mar 2023 “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; “Scheduled Completion Date” shall be the date set forth in Clause 10.3; “Scheduled Construction Period” means the period commencing from the Appointed Date and ending on Scheduled Completion Date; “Scope of the Project” shall have the meaning set forth in Clause 2.1; “Section” means a part of the Project Highway; “Site” shall have the meaning set forth in Clause 8.1; “Specifications and Standards” means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; "Stage Payment Statement" shall have the meaning set forth in Clause 19.4; “Structures” means an elevated road or a flyover, as the case maybe; “Sub-contractor” means any person or persons to whom a part of the Works or the Maintenance has been subcontracted by the Contractor and the permitted legal successors in title to such person, but not an assignee to suchperson; “Suspension” shall have the meaning set forth in Article 22; “Specialised Work” means the work which requires expertise or particular skill/technique or an advanced level of knowledge in the specific field for und...
Examples of Proof Consultant in a sentence
The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively.
The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant.
More Definitions of Proof Consultant
Proof Consultant. - “Proof Consultant” shall mean a person/firm/company appointed by the department for undertaking independent proof checking of designs of this scheme to be prepared by the Consultant.
Proof Consultant. "Proof Consultant” shall mean a person/firm/company approved by Engineer- in-charge for undertaking independent proof checking of designs of this scheme to be prepared by the Consultant.
Proof Consultant means a reputed firm/ Institution engaged by the Consultant or IIT Palakkad as the case may be for undertaking independent proof checking/ vetting of drawings and designs etc. carried out by the Consultant.
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; Contract AgreementPage 24 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; Contract AgreementPage 23 of 159 Widening & Upgradation to 4-lane with paved shoulder from km 16.700 (end of Seer Hamdan Bypass) to km 39.450 (start of Pahalgam Bypass), Package-II of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode January’ 2024 “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; “Scheduled Completion Date” shall be the date set forth in Clause 10.3; “Scheduled Construction Period” means the period commencing from the Appointed Date and ending on Scheduled Completion Date; “Scope of the Project” shall have the meaning set forth in Clause 2.1; “Section” means a part of the Project Highway; “Site” shall have the meaning set forth in Clause 8.1; “Specifications and Standards” means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; "Stage Payment Statement" shall have the meaning set forth in Clause 19.4; “Structures” means an elevated road or a flyover, as the case maybe; “Sub-contractor” means any person or persons to whom a part of the Works or the Maintenance has been subcontracted by the Contractor and the permitted legal successors in title to such person, but not an assignee to suchperson; “Suspension” shall have the meaning set forth in Article 22; “Specialized Work” means the work which requires expertise or particular skill/technique or an advanced level of knowledge in the specific field for undertaking the work as required in the Project. “Taking Over Certificate” shall have...
Proof Consultant. - “Main Consultant” shall mean a person/firm/company appointed by the department for undertaking detailed designs of this scheme.
Proof Consultant means a person who is an engineer/civil/structural engineer or a group/firm of engineers/structural engineers having post-graduate qualification in civil/structural engineering with ten years’ experience in structural design and evaluation thereof, for multistoried and specialized structure, and/ or an institute of the following type, employed for evaluation/checking of the structural design of the buildings referred to in the relevant Form BC-V(A2) for all buildings above 15 meters height (including stilt) (Please see Annexure “A”):-