TASK 8 definition

TASK 8. PIN FABRICATION The recipient shall work with selected pin fabrication vendors and perform the following subtasks: 3.8.1 Define pin plating requirements and acceptable plating systems and process for initial VSPA-264 production parts. 3.8.2 Evaluate selective plating techniques for Gold (Au) and Lead-Tin (PbSn) systems as an alternative to all gold. 3.8.3 Evaluate alternative plating systems, including, as a minimum, palladium, for application to VSPA SCM technology. 3.8.4 Evaluate alternative pin materials for potential improvement in overall manufacturability, reliability, and cost. 3.8.5 Define and evaluate alternative pin singulation processes. 3.8.6 Issue reports documenting the findings of each of the following subtasks: 3.8.2, 3.8.3, 3.8.4, and 3.8.5.
TASK 8. PIN FABRICATION The recipient shall work with selected pin fabrication vendors and perform the following subtasks: 4.8.1 Evaluate alternative pin fabrication techniques, such as etching and wire machining, with the objective of reduced costs, increased flexibility, and improved reliability and manufacturability. 4.8.2 Define and demonstrate the pin fabrication process for RF specific designs. 4.8.3 Issue reports documenting the findings of subtask 4.8.
TASK 8. County shall contract for a preliminary analysis of traffic and vehicle miles traveled (VMT), also noting the Hwy. 28 intersection capacity.

Examples of TASK 8 in a sentence

  • Provide technical assistance on grant applications.• Responsible Party: TCTC, Steering Committee, Cal Bike TaskDeliverable 7.1Workshop Agenda, Technical Assistance materials, meetingnotes TASK 8.

  • TASK 8: BUSINESS DEVELOPMENT PROGRAM (BDP) ELEMENT INITIAL PLAN Within 45 days of the notice to proceed date, the BDP plan must be submitted to the Department for review and be fully approved and ready to be implemented.

  • TASK 8 - PREPARATION OF MANUFACTURING DOCUMENTATION The supplier shall undertake final preparation and handover of all documentation and hardware prototypes at the completion of the project to undertake small batch manufacturing by VIA’s manufacturers.

  • LOCATION OF INLAKE SAMPLE SITES TASK 8 Elutriate sampling One elutriate sample set will be collected in each lake during the project period.

  • TASK 8 – Spill ResponseProvide assistance and support to EHS when responding to incidental, non-emergency spills.

  • Schedule: This project will be completed in FY 2021.Budget: $ 100,000 Study areaWORK TASK 8: Long Range Planning, Modeling, GIS & DataObjective and Description: A list of projects developed by the Technical Advisory Committee in FY ‘20 will be evaluated for expected performance across a variety of measures pertinent to state and local transportation goals and objectives using the metropolitan travel demand model and tools developed for SMART SCALE, Virginia’s project selection process.

  • Under the CHAMPUS DRG-based pay- ment system, hospitals are paid a pre- determined amount per discharge for inpatient hospital services furnished to CHAMPUS beneficiaries.(3) Pricing of claims.

  • TASK 8 (Optional Task 2) -Further roosting habitat searches shall be completed in areas across FC and the PCMS where roosting habitat exists.

  • Schedule: This project will be completed in FY 2020.Budget: $ 100,000 Study areaWORK TASK 8: Long Range Planning, Modeling, GIS & DataObjective and Description: A Constrained Long-Range Plan (CLRP) of strategically targeted, tested and affordable projects will be developed for amendment to the 2040 Metropolitan Transportation Plan.

  • TASK 8: COMPLETE SUBAREA PLANUsing the information from previous tasks and feedback from the community and stakeholders, the Consultant will prepare a subarea plan that includes attainable strategies that facilitate the transformation of the District into a walkable, transit-supportive, equitable, complete airport business district and residential community.


More Definitions of TASK 8

TASK 8. COMPARE MODELED ENERGY USE TO ACTUAL ENERGY USE
TASK 8. Based on the kinetic results and on completion of Task 7, SCi will prepare two PROX catalysts on large substrate suitable for the Epyx 50 kWe system (a few liters in volume) for evaluation in the pilot plant facility with real reformate. Epyx will provide these large substrates and its properties in a size and configuration compatible with the SCi manufacturing process.
TASK 8. XxXxxxxxx Drive & Xxxxxxx Road $6,100 – Lump Sum Task 9: Xxxxx Road & Xxxxxxx Parkway $13,500 – Lump Sum

Related to TASK 8

  • Task Order means a separate order issued under this Contract.

  • Task means a fixed quantity of work;

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • DESCRIPTION OF WORK [INSERT] SUBMISSION DEADLINE: [INSERT] APPROXIMATE SPECIFICATIONS: [ ] words; [ ] pages; [ ] images/drawings/figures

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.

  • Work Order means an individually negotiated document that is executed by both Parties and which authorizes a Project, if any, in an indefinite quantity Contract.

  • Programme of work means the Programme of work submitted by the contractor and approved by the Engineer-in-charge and includes and amendment thereto made from time to time and approved by the Engineer-in-charge;

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • lb means pound.

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Maintenance Services means SAP’s then-current maintenance and/or support services offered under and described in detail in the applicable SAP PartnerEdge Model.

  • Technical Support Services means the technical support and maintenance Services provided by us according to our then-current technical support policy and procedure listed at xxxxxxxxxxxxx.xxx (“Technical Support Policy”) when the Services are purchased.

  • SOW means the document specifying, without limitation, the scope, objective, and time frame of the Work that Supplier will perform for Cisco.

  • Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;

  • Design Services means architect services, engineer services or landscape architect services.

  • Task Force means the Louisiana Coastal Wetlands Conservation and Restoration Task Force which shall consist of the Secretary, who shall serve as chairman, the Administrator, the Governor, the Secretary of the Interior, the Secretary of Agriculture and the Secretary of Commerce; and

  • Scope of Works means the sections of the RFQ detailing the technical requirements of the work to be carried out as existing at the Date of Acceptance of the Quotation and any modification of such Works thereafter directed or the use of which has been permitted by the Superintendent for the purposes of the Contract.

  • Cost of work , in table above, shall mean the agreement amount of the work.

  • Service Description means pre-defined descriptions of services found at http://www.sap.com/servicedescriptions current as of the effective date of the Order Form which in conjunction with a Scope Document (if any) defines the Services to be provided and becomes part of the Order Form.

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Support and Maintenance Services means the support and maintenance services described in Section 1 of these Support Terms.

  • Type of Work means (insert the type of work you expect to supply the Agency Worker into);

  • Service Descriptions means user manuals and other documentation relating to the Services that are made available to Customer by Provider in digital or hardcopy form, as updated from time to time.

  • Prime Contract means the contract between LOCKHEED MARTIN and the U.S. Government or between LOCKHEED MARTIN and its higher-tier contractor who has a contract with the U.S. Government.

  • Prime Contractor means, in relation to a multiple-employer workplace,

  • Design-build team means an entity that consists of: