Examples of Tier 1 Evaluation in a sentence
A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.
Each of the evaluation statements on this checklist shall be marked compliant (C), non-compliant (NC), or not applicable (N/A) for a Tier 1 Evaluation.
The submission must include the checklists and backup calculations from the Tier 1 Evaluation.
Tier 1 Evaluation Procedures (1) The basic methodology for a Tier 1 Evaluation shall be the comparison of the highest concentration of each contaminant in each media to the TRGs provided in the Tier 1 TRG table.
If the exposure point concentrations (see Tier 1 Evaluation for an explanation of the representative concentrations) of the CoCs are below the RBSLs, further assessment and/or cleanup is not necessary (see No Further Action Decisions).
A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.· “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.
Additional Site Assessment may be required to fully evaluate the current and future exposure pathways identified in the Tier 1 Evaluation.
Tier 2 Evaluation Options (1) Tier 2 Evaluation is a more in-depth evaluation of site-specific conditions beyond the Tier 1 Evaluation methodology.
Default values may be used for material properties for a Tier 1 Evaluation.In addition to the information required for a Tier 1 Evaluation, sufficient information shall be collected for a Tier 2 Evaluation to complete the required Tier 2 Procedures.
For a Tier 1 Evaluation, the following default values may beassumed: f' c of 3000 psi for concrete, Fy of 40 ksifor reinforcing steel, Fy of 36 ksi for structural steel, f'm of 1500 psi for masonry.