Total Outage Hours definition

Total Outage Hours means the total number of Monthly Scheduled Hours during which the Logical Partition was unavailable for your use. Unavailable time is calculated by summing the IBM problem records for the Logical Partition for the month. Both your personnel and IBM operational personnel initiate problem records.

Examples of Total Outage Hours in a sentence

  • Uptime: The percentage uptime shall be calculated on monthly basis as follows: Availability = (Total No. of hours in a month – Total Outage Hours in Month) x 100 (Total No. of Hours in a Month)In case if monthly uptime falls below the guaranteed level, MCGM will be imposed a penalty as per below mentioned slab of that particular equipment value and same will be deducted from any bill payable to the vendor during the contract / warranty period.

  • Interestingly, though both the documents were relied by PW-1, but there is major difference in the agreement dated 6-11-2013 submitted by PW-1 and one seized by IO.

  • Uptime: The percentage uptime shall be calculated on Quarterly basis as follows: Availability = (Total no of Hours in a quarter – Total Outage Hours in a quarter)) x 100% (Total No of Hours in quarter) We hereby undertake to ensure uptime of 95.0% on quarterly basis for NTP Solution.

  • Penalty Clause: Uptime:The percentage uptime shall be calculated on monthly basis as follows: Availability = (Total no of Hours in month – Total Outage Hours in month) x 100%(Total No of Hours in month) Bidder should give uptime guarantee of 95% on monthly basis for all remote locations.

  • SOLUTION FOR IDBI BANK Penalty Clause: Uptime: The percentage uptime shall be calculated on monthly basis as follows: Availability = (Total no of Hours in month – Total Outage Hours in month) x 100% / (Total No of Hours in month) Bidder should give uptime guarantee of 99% on monthly basis.

  • Appendix A / Roles The School E-safety Lead / Jonathan Lees:  The Crossley Heath School has a designated e-safety lead who reports to the Designated Safeguarding Lead(DSL), Governors and coordinates e-safety provision across the school.

  • Availability in the Sify backbone is measured as follows- Availability (in %) = (Total no of Hours in a Quarter – Total Outage Hours in a Quarter) x 100% (Total No of Hours in a Quarter) The target availability objective per month for Sify’s Internet connection and its backbone network in the country (excluding unavailability due to scheduled maintenance) will be as defined in Annexure 1A, 1B, & 1C.

  • The percentage uptime shall be calculated on monthly basis as follows: Availability = (Total no of Hours in month - Total Outage Hours in month) x 100% (Total No of Hours in month)In case uptime falls below the guaranteed level, the Bank will impose a penalty of 0.5% of the contract value for each percent below the guaranteed level, subject to the ceiling of 5% annually.

  • The percentage uptime shall be calculated on monthly basis as follows: Availability = (Total no of Hours in month – Total Outage Hours in month) x 100% (Total No of Hours in month)In case uptime falls below the guaranteed level, the Bank will impose a penalty of 0.5% of the contract value for each percent below the guaranteed level, subject to the ceiling of 5% annually.

  • The debtor further states that her income has increased and stabilized.

Related to Total Outage Hours

  • Kilowatt-hour or “kWh” shall mean three decimal six million (3.6 10E6) Joule

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Service Availability The total number of minutes in a calendar quarter that the Tyler Software is capable of receiving, processing, and responding to requests, excluding maintenance windows, Client Error Incidents and Force Majeure.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Network Availability means the capability of the equipment to resume functions after a remotely initiated trigger has been detected by a network port;

  • Peak Hours or “Peak Period” means the period with the highest ridership during the entire transit service day as determined by the transit operator. Must include at least one hour during the morning commute hours and one during evening commute hours, Monday through Friday. Each Peak Period cannot be longer than three hours.

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Core Hours means the period beginning at 8am and ending at 6.30pm on any day from Monday to Friday except Good Friday, Christmas Day or bank holidays;

  • Clock hours means the actual number of hours or time a participant spends attending the instructional portion of a training designed to develop or enhance early care and education or school–age care competencies.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Base Hours means the hours of work for which a staff member receives compensation. Base hours shall include overtime hours for which a staff member is paid additional or overtime compensation, and hours for which a staff member receives workers’ compensation benefits. Base hours shall also include hours a staff member would have worked except for having been in military service. Base hours do not include hours for when a staff member receives other types of compensation, such as administrative, personal leave, vacation, or sick leave.

  • credit meter means a meter where an account is issued subsequent to the consumption of electricity;

  • Load means energy consumed by Customers together with allocated losses and unaccounted for energy;

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Planned Downtime means planned downtime for upgrades and maintenance to the Services scheduled in advance of such upgrades and maintenance.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • On-Peak Hours means Hour Ending (“HE”) 0800 through HE 2300 EPT, Monday through Friday, excluding Saturday, Sunday and PJM holidays.

  • Capacity Export Transmission Customer means a customer taking point to point transmission service under Tariff, Part II to export capacity from a generation resource located in the PJM Region that has qualified for an exception to the RPM must-offer requirement as described in Tariff, Attachment DD, section 6.6(g).

  • Peak-Hour Dispatch means, for purposes of calculating the Energy and Ancillary Services Revenue Offset under Tariff, Attachment DD, section 5, an assumption, as more fully set forth in the PJM Manuals, that the Reference Resource is committed in the Day-Ahead Energy Market in four distinct blocks of four hours of continuous output for each block from the peak-hour period beginning with the hour ending 0800 EPT through to the hour ending 2300 EPT for any day when the average day-ahead LMP for the area for which the Net Cost of New Entry is being determined is greater than, or equal to, the cost to generate (including the cost for a complete start and shutdown cycle) for at least two hours during each four-hour block, where such blocks shall be assumed to be committed independently; provided that, if there are not at least two economic hours in any given four-hour block, then the Reference Resource shall be assumed not to be committed for such block; and to the extent not committed in any such block in the Day- Ahead Energy Market under the above conditions based on Day-Ahead LMPs, is dispatched in the Real-Time Energy Market for such block if the Real-Time LMP is greater than or equal to the cost to generate under the same conditions as described above for the Day-Ahead Energy Market. Peak Market Activity:

  • Unscheduled Outage means any outage that is not a “Scheduled Outage”. “Committed Time” shall mean, as to each Business Day, one hour before the trading session for that day is scheduled to open on the NYSE and one hour after the trading session on the NYSE for that day finally closes, but excluding the following periods of Scheduled Outage (defined below). A “Scheduled Outage” shall mean (1) those time periods from 12 AM Saturday to 6:00 AM Sunday each week and 11:00 PM to 12:00 AM daily, during which Computershare’s System maybe unavailable due to routine maintenance; and (2) any time period as to which Company has received prior notice. ≥99.5% <99.5% to ≥98% <98%

  • System Availability means, with respect to any particular calendar month, the ratio obtained by subtracting Unscheduled Downtime during such month from the Total Monthly Time, and thereafter dividing the difference so obtained by the Total Monthly Time. Represented algebraically, System Availability for any particular calendar month is determined as follows: