Wind Solar Hybrid Power Project means the wind-solar hybrid power project where the rated power capacity of one resource is at least 33% of the rated power capacity of the other resource;
Wind Solar Hybrid Power Project means the wind-solar hybrid power project where the rated power capacity of one resource is atleast 25% of the rated power capacity of the other resource.
Wind Solar Hybrid Power Project means the Wind-Solar hybrid power generation facility of Contracted Capacity of ………..[Insert capacity as per LoA] MW, where the rated power capacity of one resource is at least 33% of the Contracted Capacity, located at ……………. [Insert name(s) of the village(s)] in …. [Insert name(s) of the District(s) and State(s)] having a separate control system, metering and a single point or separate points of injection into the grid at Delivery/Interconnection/Metering point(s) at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. The rated capacities of the various components are as follows: Solar PV component: MW Wind Power component: MW (to be filled as per project configuration). This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;
Examples of Wind Solar Hybrid Power Project in a sentence
The Project should satisfy the Wind Solar Hybrid Power Project conditions and the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, the commissioning capacity shall be calculated as per the above Recital 4.
The Project should satisfy the Wind Solar Hybrid Power Project conditions and the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, the commissioning capacity shall be calculated as per the above Recital 6.
More Definitions of Wind Solar Hybrid Power Project
Wind Solar Hybrid Power Project or “Hybrid Power Project” shall mean the Wind-Solar hybrid power generation facility of Contracted Capacity of [Insert capacity as per LoA] MW, where the rated power capacity of one resource (wind or solar) is at least 33% of the Contracted Capacity, located at ……………. [Insert name(s) of the place] in …. [Insert name(s) of the District(s) and State(s)] having a separate control system, metering and a single/multiple point(s) of injection into the grid at Delivery/Interconnection/Metering point(s) at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. The rated capacities of the various components are as follows: Solar PV component: MW Wind Power component: MW (to be filled as per project configuration). The project shall include all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;
Wind Solar Hybrid Power Project means the wind-solar hybrid power project where the rated installed Project Capacity of the components are defined in Schedule-2. The Developers shall demonstrate the rated capacities of each component separately at the input side of the sub-pooling substation.
Wind Solar Hybrid Power Project means the Wind-Solar hybrid power generation facility of Contracted Capacity of [Insert capacity as per LoA] MW, where the rated power capacity of one resource is at least 33% of the Contracted Capacity, located at [Insert name(s) of the village(s)] in [Insert name(s) of the District(s) and State(s)] having a separate control system, metering and a single/multiple point(s) of injection into the grid at Delivery/Interconnection/Metering point(s) at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. The rated capacities of the various components are as follows: Solar PV component: MW Wind Power component: MW (to be filled as per project configuration). This includes all units/modules and auxiliaries and associated facilities, bay(s) for transmission system in the switchyard, dedicated transmission line up to the interconnection/ Metering Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power to CESC;
Wind Solar Hybrid Power Project means the Solar PV and Wind Power generation facilities of Contracted Capacity of [INSERT CAPACITY] MW, Wind and Solar Power Project, with rated power capacities in the ratio of at least 2:1 respectively, provided the Project is a Hybrid Project under the Guidelines, located at , State: ………. having a separate control system, metering and a single/multiple point(s) of injection into the grid at Delivery/Interconnection/Metering point(s) at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. The rated capacities of the various components are as follows: Solar PV component MW Wind Power component MW This includes all units/modules and auxiliaries and associated facilities, bay(s) for transmission system in the switchyard, dedicated transmission line up to the Interconnection/ Metering Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power to CESC;
Wind Solar Hybrid Power Project means the wind-solar hybrid power project where the rated power capacity of one resource is atleast 25% of the rated power capacity of the other resource. (For eg, if a single Hybrid Project Capacity comprises 200 MW of rated Wind Power capacity, the minimum rated project capacity for the corresponding Solar Project component shall be 50 MW, and the Hybrid Project capacity for the above arrangement shall be the sum of the rated capacities of the two components.)
Wind Solar Hybrid Power Project means the wind solar hybrid power project where the rated power capacity of solar power project shall not be more than 33% of the total contracted capacity.
Wind Solar Hybrid Power Project means the Wind-Solar hybrid power generation facility of Contracted Capacity of [Insert capacity as per LoA] MW, where the rated power capacity of one resource is at least 33% of the Contracted Capacity, located at ……………. [Insert name(s) of the village(s)] in …. [Insert name(s) of the District(s) and State(s)] having a separate control system, metering and a single/multiple point(s) of injection into the grid at Delivery/Interconnection/Metering point(s) at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. The Project also includes Energy Storage System of at least 1 MW for each Contracted Capacity of 1 MW. HPD shall deliver 4 MWh per day to the RUVNL through the ESS. To clarify HPD shall be able to supply 1 MW capacity for four (4) hours a day as per requirements of RUVNL. The rated capacities of the various components are as follows: • Solar PV component: MW • Wind Power component: MW • ESS component: MW/MWh (to be filled as per project configuration). Project includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement; The ESS component may be co-located with the Solar PV or with Wind Power generating components, or may be located separately, under a single Project. In case the ESS component is located separately from the Solar PV/Wind generating components, the charges for charging and discharging the ESS, as applicable under GNA/LTA regulations and other orders issued by MoP/CERC will be borne by the HPD.