AS-BUILTS AND SAMPLES Sample Clauses

AS-BUILTS AND SAMPLES. .1 In addition to requirements in General Conditions, maintain at the site for Contract Administrator one record copy of:
AutoNDA by SimpleDocs
AS-BUILTS AND SAMPLES. .1 Maintain at the site for Departmental Representative one record copy of: .1 Contract Drawings. .2 Specifications.
AS-BUILTS AND SAMPLES. .1 Maintain in addition to requirements in General Conditions, at site Contract Administrator and The City one record copy of:
AS-BUILTS AND SAMPLES. .1 Maintain, in addition to requirements in General Conditions, at site for Departmental Representative one record copy of:
AS-BUILTS AND SAMPLES. 1 Maintain at the site for Departmental Representative one record copy of: .1 Contract Drawings. .2 Specifications. .3 Addenda. .4 Change Orders and other modifications to the Contract. .5 Reviewed shop drawings, product data, and samples. .6 Field test records. .7 Inspection certificates. .8 Manufacturer's certificates. .2 Store record documents and samples in field office apart from documents used for construction. Provide files, racks, and secure storage. .3 Label record documents and file in accordance with Section number listings in List of Contents of this Project Manual. Label each document "PROJECT RECORD" in neat, large, printed letters. .4 Maintain record documents in clean, dry and legible condition. Do not use record documents .5 for construction purposes. Keep record documents and samples available for inspection by Departmental Representative.

Related to AS-BUILTS AND SAMPLES

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Standard Samples Bid Specifications may indicate that the Product to be purchased must be equal to a standard sample on display in a place designated by the Commissioner and such sample will be made available to the Bidder for examination prior to the opening date. Failure by the Bidder to examine such sample shall not entitle the Bidder to any relief from the conditions imposed by the Bid Specifications.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.

  • Safety Equipment Should the employment duties of an employee in the bargaining unit require use of any equipment or gear to insure the safety of the employee or others, the District agrees to furnish such equipment or gear.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • UNIFORMS AND SAFETY EQUIPMENT 214. For employees required by the Appointing Officer to wear a uniform, beginning in fiscal year 2006-2007 and continuing for the duration of this Agreement, the City agrees to provide a uniform allowance each year in the amount of eight hundred fifty dollars ($850). The City will pay the uniform allowance in the payroll that includes September 1 of each year. Represented employees must be on duty status or approved leave on each September 1 to be eligible for the uniform allowance. Any eligible employee hired on or after March 1 will receive fifty percent (50%) of the uniform allowance that year.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

Time is Money Join Law Insider Premium to draft better contracts faster.