Building Requirements and Sizes Sample Clauses

Building Requirements and Sizes. The control, administration, maintenance, and warehouse areas shall be arranged to provide sufficient space for plant operations and maintenance activities. These areas may be combined into one building (and may be one or two stories with a high-bay/low-bay arrangement). The warehouse, maintenance, and areas shall be designed with 20-foot (minimum) eave height. The control room, electrical switchgear room, battery room, administration facilities, instrument and electronics area shall have minimum 14‑foot eave height. The buildings shall house areas including the administration areas, control room, control equipment room, battery room, electrical equipment, communications room, maintenance area (including an I&C area), and warehouse. These buildings will be enclosed, weather tight buildings. The high-bay areas will contain the plant maintenance area and warehouse area and shall include a roll-up steel door(s) to accept large pieces of equipment. The low-bay areas will contain the station control room, battery room, electronics room, offices, and washroom and locker area. The control, administration, maintenance, and warehouse areas shall be provided with power receptacles, and telephone and communications connections, as required and applicable. The maintenance and warehouse areas shall be provided with service and instrument air drops, service water drops, and welding stations. The quantity and locations are subject to Purchaser approval. Only the administration, control, and maintenance areas shall be designed to meet the requirements of the Americans with Disabilities Act (ADA), unless additional areas are required by local or state authorities. Space allocation for the various buildings and work areas are noted below. Building and work areas sizes are approximate and will be finalized during the detailed design phase of the project. Buildings and Work Areas Size (Sq Ft) Minimum Inside Height (ft) Buildings Administration/ Control Building 5,000 10 Warehouse Building 6,000 18 Water Treatment Building 10,000 18 Boiler Feed Building (one per HRSG) 1,700 10 Cooling Tower Water Treatment 1,125 10 Emergency Generator Building 900 16 Gas Compressor Building 1,600 20 Electrical Switchgear Building 3,000 10 Switchyard Control House 1,800 10 Administration/Control Building Rooms Control Room 1,000 10 DCS Room 400 10 Communication Room 200 10 Men’s Restroom 150 8 Women’s Restroom 150 8 Lunch Room & Kitchen 280 8 File Room 200 8 Training Room/Library 200 8 Conferen...
AutoNDA by SimpleDocs

Related to Building Requirements and Sizes

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Space Requirements The Construction Administrator will conduct a review of the adequacy of space allotments for maintenance of mechanical, telephone, and fire protection equipment.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

  • Training Requirements Grantee shall:

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Bidding Requirements The Advertisement or Invitation to Bid, Instructions to Bidders, Bid security form, if any, and the Bid form with any supplements.

  • ORDERING REQUIREMENTS Eligible Purchasers shall order Goods and/or Services from this Master Contract, consistent with the terms hereof and by using any ordering mechanism agreeable both to Contractor and Purchaser but including, at a minimum, a purchase order. When practicable, Contractor and Purchaser also shall use telephone orders, email orders, web-based orders, and similar procurement methods (collectively “Purchaser Order”). All Purchase Orders must reference the Master Contract number. The terms of this Master Contract shall apply to any Purchase Order and, in the event of any conflict, the terms of this Master Contract shall prevail. Notwithstanding any provision to the contrary, in no event shall any ‘click-agreement,’ software or web-based application terms and conditions, or any other agreement modify the terms and conditions of this Master Contract.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.