Carried to Final Summary Sample Clauses

Carried to Final Summary. Section No. 1 PRELIMINARIES Bill No. 1 Preliminaries TECHVOLUTION ENGINEERS Item R R Item No 2/1/1 2/1/2 2/1/3 2/1/4 2/1/5 SECTION NO. 2 BILL NO. 1 ALTERATIONS TEMPORARY BARRIERS, SCREENS, ETC Temporary barriers, screens, etc including removal Dust screen 2,1mm high between concrete floor and ceiling formed of suitable timber framing with micron polyethylene sheeting stapled on including corners, ends, etc m REMOVAL OF EXISTING WORK Taking down and removing roofs, floors, panelling, ceilings, partitions, etc Clay tiles roof covering and timber purlins (sloping) m2 Fibre cement roof covering and timber purlins (flat) m2 Gypsum plasterboard ceilings including cornices, timber brandering, etc m2 Taking up and removing vinyl floor coverings, carpeting, etc Vinyl tile floor covering including preparing screed for new vinyl floor covering m2 Carried Forward Section No. 2 BUILDERS WORK - ROOF REPAIRS AND REPLACEME Bill No. 1 Alterations TECHVOLUTION ENGINEERS Quantity 10 902 312 1,059 Rate R Amount 2/1/6 2/1/7 2/1/8 2/1/9 2/1/10 Brought Forward Carefully remove and later re-install in same positions Roof air vents including support structures and other accessories No PREPARATORY WORK TO EXISTING SURFACES Scrapping off existing paintwork and making good internal plaster to receive new paint m2 ALLOWANCES Repairing Existing Roof Structure Allow R40,000 (Forty Thousand Rand) for the inspection, documenting and repair of the existing roof structure Removal and re-installation of roof accessories Allow R12,500 (Twelve Thousand Five Hundred Rand)for the careful removal and re-installation of all roof accessories (except the roof air vents 12 in No. elsewhere measured) in line with manufacturer's recommendations Repairing/Upgrading Electrical Installations Allow R300,000 (Three Hundred Thousand Rand) for electrical investigation, checking for compliance of the entire building, upgrades, repairs, re-wiring, insulation of roof electrical components and issuance of an Electrical Certificate of Compliance Carried Forward to Summary of Section No. 2 Section No. 2 BUILDERS WORK - ROOF REPAIRS AND REPLACEME Bill No. 1 Alterations TECHVOLUTION ENGINEERS 12 354 R SUM SUM SUM R
AutoNDA by SimpleDocs
Carried to Final Summary. Section No. 2 The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL This Bill of Quantities must be read in conjunction with the attached specifications and details Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent Section No. 3 Bill No. 1 Alterations The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc) Taking out and removing doors, windows, etc, including thresholds, xxxxx, etc (building up openings and making good finishes elsewhere)
Carried to Final Summary. SECTION NO. 1 BILL NO. 1 PRELIMINARIES AND GENERAL Xxxx X X
Carried to Final Summary. Section No. 1 Preliminaries and General Xxxx No. 1 Preliminaries and General R R
Carried to Final Summary. UNIT Item Item Item Item Item Item QUANTITY 1 1 1 1 1 1 RATE AMOUNT
Carried to Final Summary. Section No. 1 PRELIMINARIES AND GENERAL Xxxx No. 1 PRELIMINARIES Item R R
Carried to Final Summary. Section No. 2
AutoNDA by SimpleDocs
Carried to Final Summary. R Section No.1 PRELIMINARIES AND GENERAL Xxxx Xx. 1 Preliminaries Prepared By Inveslot (Pty) Ltd
Carried to Final Summary. Section No.1 PRELIMINARIES AND GENERAL Xxxx Xx. 1 Preliminaries Prepared By Inveslot (Pty) Ltd Quantity Amount R 1 Item 2 Item
Carried to Final Summary. Section No. 1 Preliminaries Bill No. 1 PRELIMINARIES Prepared by: Xxxxxx Xxxxxxxx Surveyors R Amount For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades Tenderers are advised to visit the site and to satisfy themselves as to the nature and extent of the work to be done and provide in their tenders for any items not specifically mentioned which they may deem necessary for the proper completion of the work. Tenderers are advised that the existing buildings will not be in occupation during the progress of the work but that nearby new buildings will be in occupation and due allowance must be made for the work being carried out at such times and in such a manner as will least interfere with the routine of the occupants and as may be directed by the architect.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!