Carried to Final Summary Sample Clauses

Carried to Final Summary. R Section No.1 PRELIMINARIES AND GENERAL Xxxx Xx. 1 Preliminaries Prepared By Inveslot (Pty) Ltd Item No 1 CIVIL ENGINEERING WORKS XXXX Xx.2 PLUMBING AND DRAINAGE (STORMWATER) PREAMBLES: (For preambles refer to "Specification of Materials and Methods to b used" PW 371) NOTES: Unless otherwise stated all items in this bill shall be deemed to fall Work Group No. 148 for Xxxxxxx Formula purposes STORMWATER Install 200dia HDPE pipes for stormwater from the monument e into Quantity Rate R Amount with trenchless technologies including pipe m 70 2 Install 300 x 300mm square dish grate & frame 9.2KG CI or similar approved grid inlets complete connected to new Stormwater pipe and MH No 4 3 200mm dia. Cleaning eyes No 2 4 Connect into existing 450 dia Stormwater pipe No 2 Carried Forward to S ummary CIVIL ENGINEERING WORKS Bill No. 2 Plumbing & drainage (Stormwater) Prepared By Investlot (Pty) Ltd Item No CIVIL ENGINEERING WORKS BILL No.3 EXTERNAL WORKS PREAMBLES Tenderers are referred to the relevant clauses in the Model Preambles for Trades (Latest Edition) as published by the Association of South African Quantity Surveyors and to the Supplementary Preambles which are incorporated in these Bills of Quantities before pricing this schedule SUPPLEMENTARY PREAMBLES Descriptions For full descriptions and supplementary preambles applicable to this section, see also previous bills Nature of ground A soil investigation will be carried out on site by the engineer, and the report will be annexed to these bills of quantities. Descriptions of all excavations shall be deemed to include all ground conditions classified as earth described in the annexed report and where conditions of a more difficult character are indicated these are separately measured Carting away of excavated material Description of carting away of excavated material shall deemed to include loading of excavated material onto trucks directly from the excavations, or alternatively, from stock piles situated on the building site Carried Forward CIVIL ENGINEERING WORKS Bill No. 3 External Works Prepared By Investlot (Pty) Ltd Quantity Rate R Amount Item No Brought Forward Concrete pipes Pipes shall be jointed with ogee joints with rubber collars or socket and spigot joints with rubber rings uPVC pipes and fittings Sewer and drainage pipes and fittings shall be jointed and sealed with butyl rubber rings Soil, waste and vent pipes and fittings shall be solvent weld jounted and finished smooth uPVC pressure pipes an...
AutoNDA by SimpleDocs
Carried to Final Summary. Section No. 1 Preliminaries Bill No. 1 PRELIMINARIES Prepared by: Xxxxxx Xxxxxxxx Surveyors R Amount Item No SECTION NO. 2 Quantity Rate BILL NO. 1 ALTERATIONS PREAMBLES For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades SUPPLEMENTARY PREAMBLES Nature of the works Tenderers are advised to visit the site and to satisfy themselves as to the nature and extent of the work to be done and provide in their tenders for any items not specifically mentioned which they may deem necessary for the proper completion of the work. Tenderers are advised that the existing buildings will not be in occupation during the progress of the work but that nearby new buildings will be in occupation and due allowance must be made for the work being carried out at such times and in such a manner as will least interfere with the routine of the occupants and as may be directed by the architect.
Carried to Final Summary. Section No. 2 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Item No BILL NO. 01 Quantity Rate ALTERATIONS PREAMBLES For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder SUPPLEMENTARY PREAMBLES The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL This Bill of Quantities must be read in conjunction with the attached specifications and details View site Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained General The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent Carried Forward R Section No. 3 Bill No. 1 Alterations Bespoke Global Efficacy Ramgoolam (Pty) Ltd Amount Brought Forward R The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc) (CPAP WORK GROUP NO. 102) unless otherwise stated REMOVAL OF EXISTING WORK Taking out and removing doors, windows, etc, including thresholds, xxxxx, etc (building up openings and making good finishes elsewhere)
Carried to Final Summary. Section No. 1 PRELIMINARIES AND GENERALS Xxxx Xx. 1 PRELIMINARIES POLOKWANE MUNICIPALITY REFURBLISHMENT TO BAKONI MALAPA OPEN AIR MUSEUM Item Item Item Item Item R R Item No 2/1/1 2/1/2 2/1/3 2/1/4 2/1/5 2/1/6 2/1/7 SECTION 2 BILL NO. 1 ALTERATIONS ( PROVISIONAL ) NOTE : Unless otherwise stated herein, all items in this bill shall be deemed to fall into Work Group No. 102 for CPAP formula purposes REMOVAL OF EXISTING WORK Taking out and removing doors, windows, etc including thresholds, xxxxx, etc (Remove demolished material from site) Timber single door 813 x 2032mm high overall includings locks, etc No Timber single door 813 x 2032mm high overall incl steel frame from 110mm brick wall No Breaking down and removing brickwork, including plaster etc 110mm brick wall m2 220mm brick wall m2 440mm brick wall m2 Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork Plaster from walls m2 Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork 25mm Granolithic from floors m2 Carried Forward Section No. 2 RENOVATIONS Bill No. 1 Alterations POLOKWANE MUNICIPALITY REFURBLISHMENT TO BAKONI MALAPA OPEN AIR MUSEUM Quantity 2 3 19 1 12 200 27 Rate R Amount 2/1/8 2/1/9 2/1/10 2/1/11 2/1/12 2/1/13 2/1/14 2/1/15 Brought Forward Hacking up/off and removing ceramic tile floor and wall finishes, including removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc Tiles to floors m2 Tiles to walls m2 Taking out and removing piping, sanitary fittings, etc including disconnecting piping from fittings and blocking all water and sanitary points Galvanised steel piping including fittings and brackets m Wash hand basin, including short lengths of piping, etc No Vitreous china WC pan with cistern and including short lengths of piping, etc No stainless steel flat back urinal trough including short lengths of piping, etc No Taking out and removing glass and mirrors Glass from steel windows including cleaning out rebates and preparing for new glass m2 REMOVAL OF EXISTING WORK Breaking up and removing mass concrete 100mm Thick surface beds m2 Carried Forward to Summary of Section Xx. 0 Xxxxxxx Xx. 0 RENOVATIONS Bill No. 1 Alterations POLOKWANE MUNICIPALITY REFURBLISHMENT TO BAKONI MALAPA OPEN AIR MUSEUM 27 2 20 6 3 3 3 400 R R Item No 2/2/1 2/2/2 2/2/3 2/2/4 2/2/5 2/2/6 2/2/7 BILL NO 2 FOUNDATIONS (PROVISIONAL) PREAMBLES For preambles see "Specification...
Carried to Final Summary. Section No. 1 Preliminaries and General Xxxx No. 1 Preliminaries and General R R Item No 1 2 3 SECTION 2 PRETORIA NATIONAL BOTANICAL GARDEN XXXX NO.1 ALTERATIONS (THATCH) REMOVAL OF EXISTING WORK Taking down and removing thatch roofs, etc Thatch roofs not exceeding 175mm thick including glass fibre ridge cappings (battens to remain) AA: 0 AB: 0 AC: 9 AD: 0 AE: 0 AF: 28 AG: 27 AH: 0 AI: 0 AJ: 0 AK: 9 AL: 20 AM: 0 AN: 0 AO: 0 m2 Glass fibre ridge capping AA: 0 AB: 2 AC: 0 AD: 0 AE: 4 AF: 6 AG: 0 AH: 0 AI: 0 AJ: 3 AK: 0 AL: 0 AM: 0 AN: 1 AO: 0 m PREPARATORY WORK TO EXISTING SURFACES Prepare grass ridges to recieve glass fibre ridges (ridge measured elsewhere) AA: 4 AB: 0 AC: 0 AD: 5 AE: 0 AF: 0 AG: 0 AH: 4 AI: 20 AJ: 0 AK: 0 AL: 0 AM: 3 AN: 0 AO: 10 m Carried Forward to Summary of Xxxxxxx Xx. 0 Xxxxxxx Xx. 0 Xxxxxxxx National Botanical Garden Xxxx No. 1 Thatch- Alterations Quantity 92 16 46 Rate R Amount
Carried to Final Summary. COMMENT It is hoped that a simplified Preliminaries Bill No 1 for nominated or selected subcontract works will lead to a more uniform and practical approach when compiling tender documents for the wide variety and scope of such works in the building industry. Statistics have shown that for each N/S Subcontract Agreement (NSSA) sold four Principal Building Agreements (PBA) are sold – this should be the other way round! To increase the sales of the NSSA JBCC has reduced the price thereof compared to what it sells the PBA for, but unfortunately this has resulted in only a minor increase in the sales of the NSSA
Carried to Final Summary. Section No. 1 PRELIMINARIES AND GENERAL Xxxx No. 1 PRELIMINARIES Item R R
AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.