CONTRACTOR’S RESPONSIBILITIES DURING CONSTRUCTION OF WATER TREATMENT PLANT Sample Clauses

CONTRACTOR’S RESPONSIBILITIES DURING CONSTRUCTION OF WATER TREATMENT PLANT. The Contractor shall have visited the project site before submitting the offer in order to assess onsite consistency and extent of work required, as well as the local operational and environmental constraints. The Contractor shall provide all labour, materials, equipment, tools and supervision necessary to undertake the works. During the construction of the new and expanded WTP, the Works Contractor will have to maintain production in the existing plant as far as possible. Any interruptions in production from the existing plant must be notified in advance to RUJWASCO and the Engineer and agreed. If required, the Works Contractor will have to schedule any interruptions for during the night, to minimise inconvenience for consumers. Where mechanical and electrical equipment is to be installed in existing facilities, the Contractor shall be responsible for protecting all existing plant, building works and services. Any damage caused by the Contractor to existing structures or services shall be repaired to the satisfaction of the Engineer. The Contractor shall immediately carry out essential repairs to any buildings, structures or services damaged by him during the execution of the Works and shall maintain them until such time as final reinstatement and repairs are completed. The Works Contractor will also be responsible for implementing strict controls during the works to ensure no contamination of the water from the existing plant. The Contractor will only be permitted to proceed with works on the basis of Method Statements, approved by the Engineer. Design drawings must be submitted to the Client / Engineer to obtain his approval before ordering of any Plant, after which rehabilitation / upgrading works will commence. As-built documents will be provided after completion of works. Taking over will be carried out following the completion of testing, training and acceptance by the Engineer of the required documents, particularly O&M manuals and as-built drawings. Contractor’s training must be based on the already approved O&M manuals and is subject to acceptance by the Engineer. Essential spare parts will also be supplied to RUJWASCO and contact details of suppliers will be given for non-essential spare parts. Training for the raw water pumping station and treatment plant will include a test run period, under the responsibility of the Contractor, supervised by the Engineer. RUJWASCO will be given sufficient notice of the recommended numbers of operators and the...
AutoNDA by SimpleDocs

Related to CONTRACTOR’S RESPONSIBILITIES DURING CONSTRUCTION OF WATER TREATMENT PLANT

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • CONSTRUCTION MANAGER’S RESPONSIBILITIES The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 2.1 and 2.2. The Construction Manager’s Construction Phase responsibilities are set forth in Section 2.3. The Owner and Construction Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of the Preconstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.

  • Contractor’s Responsibilities Unless stated specifically to the contrary in the tender with full supporting explanations, the contractor will be deemed to have concurred as a practical manufacturer with the design and layout of the works as being sufficient to ensure reliability and safety in operation, freedom from undue stresses and satisfactory performance in all other essentials as a working material.

  • CONTRACTOR'S RESPONSIBILITY Nothing herein shall be construed as limiting in any way the extent to which contractor/renter may be held responsible for damages resulting from contractor/renter’s operations, acts, omissions or negligence. Insurance coverage obtained in the minimum amounts specified above shall not relieve contractor/renter of liability in excess of such minimum coverage, nor shall it preclude the fair from taking other actions available to it under contract documents or by law, including, but not limited to, actions pursuant to contractor/renter’s indemnity obligations. The contractor/renter indemnity obligations shall survive the expiration, termination or assignment of this contract.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Contractor Responsibilities 19.1. Contractor shall perform national criminal history checks for Ohio, Indiana, and Kentucky, and 10-panel drug screening tests on all prospective employees performing work under this RFP or coming onto a CMHA property and any resulting contract and provide summaries of the results to the Authority if requested. For the purposes of this section, the term “employees” includes contractor. Prospective employees whose criminal background check discloses a misdemeanor or felony involving crimes of moral turpitude, sexual offenses or harm to persons or property shall not be employed to perform work under this RFP or any resulting contract. Contractor is required to perform drug screening of all employees and to ensure acceptable test results. Criminal history and drug screening checks will be completed at the sole expense of the contractor. Any employee of the Contractor suspected of being under the influence of drugs and or alcohol will be reported to the appropriate personnel at CMHA and/or other local law enforcement. If the employee is determined to be under the influence of drugs or alcohol in any form or manner, or believed by proper authority to be dealing in illicit sale of alcohol or drugs they will be removed and shall not be allowed to return to any job site on the Authority’s property. The Contractor’s contract may be suspended and/or terminated should such a situation occur or if the Contractor fails to submit results pursuant to this section.

  • Construction Responsibilities The party named in Article 1, Responsible Parties, under AGREEMENT is responsible for the following: