Definitive Data Analytical Methods Sample Clauses

Definitive Data Analytical Methods. Analytical la boratories must be certified by the State of California for the project analytical methods and sample matrices prior to accepting project samples. Table 3-4 presents preparation methods, and Table 3-5 presents definitive analytical methods . Definitive analytical methods are approved methods that are designed to produce data within specified precision and accuracy limits and that are presented in a format that permits independent verification of the reported results. The lists of preparation and analysis methods should not be considered exhaustive. Appendix C presents reporting li mit tables for commonly -used methods. The tables in Appendix C are not intended to be used as exhaustive analyte lists. Analytes may be added or deleted to the list , and the list may be altered to meet the project objectives. Required target analytes shall be identified during the planning process , and project -specific target analyte lists and required reporting limits shall be included in each facility -specific work plan. Analytical methods should follow the requirements and guidelines presented in USEPA test methods. Primary sources for definitive analytical methodologies are:  Methods for Chemical Analysis of Water and Wastes (USEPA, 1983)  Methods for the Determination of Organic Com pounds in Drinking Water , Environmental Monitoring Systems Laboratory, Office of Research and Development, EPA -600/ 4-88/ 039 (USEPA, 1988)  Leaking Underground Fuel Tank Field Manual: Guidelines for Site Assessment, Cleanup, and Underground Storage Tank Closure (SWRCB, 1989)  Methods of Air Sampling and Analysis , Third Edition (Lodge, 1990)  Compendium of Method for the Determination of Toxic Organic Compounds in Ambient Air, Second Edition, EPA 625/R-96/010b (USEPA, 1997)  General Laboratory Testing Requirements for Petroleum Hydrocarbon Impact Sites (RWQCB, 2000)  Guide to Environmental Analytical Methods, Fifth Edition (Xxxxx, 2001a)  Laboratory Requirements for Soil and Water Sample Analysis (RWQCB, 2001b)  Laboratory QA/QC Requirements f or Metal Analyses (RWQCB, 2001c)  Manual for the Certification of Laboratories Analyzing Drinking Water – Criteria and Procedures/Quality Assurance , EPA 815-R-05-004 (USEPA, 2005)  Standard Methods for Examination of Water and Wastewater , 18th Edition (APHA / AWWA / WPCF, 2006a)  Annual Book of ASTM Standards , Various Volumes (ASTM, 2006b)  Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, EPA SW -846,...
AutoNDA by SimpleDocs

Related to Definitive Data Analytical Methods

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Technology Research Analyst Job# 1810 General Characteristics Maintains a strong understanding of the enterprise’s IT systems and architectures. Assists in the analysis of the requirements for the enterprise and applying emerging technologies to support long-term business objectives. Responsible for researching, collecting, and disseminating information on emerging technologies and key learnings throughout the enterprise. Researches and recommends changes to foundation architecture. Supports research projects to identify and evaluate emerging technologies. Interfaces with users and staff to evaluate possible implementation of the new technology in the enterprise, consistent with the goal of improving existing systems and technologies and in meeting the needs of the business. Analyzes and researches process of deployment and assists in this process.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Research Use Reporting To assure adherence to NIH GDS Policy, the PI agrees to provide annual Progress Updates as part of the annual Project Renewal or Project Close-out processes, prior to the expiration of the one (1) year data access period. The PI who is seeking Renewal or Close-out of a project agree to complete the appropriate online forms and provide specific information such as how the data have been used, including publications or presentations that resulted from the use of the requested dataset(s), a summary of any plans for future research use (if the PI is seeking renewal), any violations of the terms of access described within this Agreement and the implemented remediation, and information on any downstream intellectual property generated from the data. The PI also may include general comments regarding suggestions for improving the data access process in general. Information provided in the progress updates helps NIH evaluate program activities and may be considered by the NIH GDS governance committees as part of NIH’s effort to provide ongoing stewardship of data sharing activities subject to the NIH GDS Policy.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Time is Money Join Law Insider Premium to draft better contracts faster.