Description Cost Sample Clauses

Description Cost. 1 Inspection cost in the country of origin per engineer. (If not included in the main offer).
AutoNDA by SimpleDocs
Description Cost. Asbestos Survey (Lump Sum - includes field time, report, and PLM analysis of up to 30 bulk samples) $1,500.00 Terracon’s invoice will be submitted to the Client upon completion of the proposed services. If conditions are encountered at the site, which require significant changes in the scope of services or a significant increase in the anticipated number of samples which will increase the cost of the survey, you will be contacted for discussion and approval of such changes before we proceed. Items to be provided by the Client include: • The legal right-of-entry to conduct the limited survey. • Any restrictions or special access requirements regarding the site shall be made known to Terracon prior to site mobilization. • Any known environmental conditions at the site (i.e., hazardous materials or processes, specialized protective equipment requirements, unsound structural members, etc.) shall also be communicated to Terracon prior to site mobilization. • A diagram of the building layout such as a scaled Architect’s drawing or construction drawings (if available) will be provided to Terracon prior to site mobilization. DocuSign Envelope ID: 81E25826-88E9-45D3-8845-9A374D69E3E0 DocuSign Envelope ID: 6A3D2AE8-2559-4BBB-85B9-D0EE92DCE303 DocuSign Envelope ID: 81E25826-88E9-45D3-8845-9A374D69E3E0 DocuSign Envelope ID: 6A3D2AE8-2559-4BBB-85B9-D0EE92DCE303 TFC Contract No. 00-000-000 Assignment No. 28 - Exhibit B Terracon Consultants, Inc.
Description Cost. Gulfstream American Corp, Model G-1159A Aircraft which consists of the following components: $ 12,475,000.00 (a) Airframe bearing FAA Registration Xxxx N123MR and Manufacturer's Serial No. 455; (b) Two (2) Rolls Royce 511-8 engines bearing Manufacturer's Serial Nos. 11332 and 11333 respectively (each of which has 750 or more rated takeoff horsepower or the equivalent of such horsepower); (c) N/A propellers bearing, respectively bearing, Manufacturer's Serial Nos. and , each being rated as follows: (d) Standard accessories and optional equipment and such other items fitted or installed on the Aircraft and set forth hereinafter: (e) Those items of Lessee Furnished Equipment described in a xxxx of sale or bills of sale therefor (copies of which are appended hereto), delivered by Lessee to Lessor which constitute appliances and equipment which will be installed on the Aircraft; (f) Sales Tax $ 0.00 (g) Other $ 0.00 Capitalized Lessor's Cost $ 12,475,000.00 (a) Four-by-six inch plaque to be maintained in cockpit and affixed in conspicuous position stating: General Electric Capital Corporation, Lessor and Lienholder. , Lessee under a certain Lease dated as of , has operational control of this aircraft. (b) Similar markings shall be permanently affixed to each engine. Initials: Lessee: XXXXX XXXXXXXXX Lessor: XXXXXXX X. XXXXXXXX Lessor & Mailing Address: Lessee & Mailing Address: General Electric Capital Corporation 00 Xxx Xxxxxxxxx Xxxx Xxxxxxx, XX 00000-0000 Mandalay Resort Group 0000 Xxx Xxxxx Xxxx. Xxxxx, Xxx Xxxxx, XX 00000 Capitalized terms not defined herein shall have the meanings assigned to them in the Aircraft Lease Agreement identified above.
Description Cost. Series #1 Arc Jet Testing $2,284,000 2. CFD support for Series #1 $180,000 3. Series #2 Arc Jet Testing $1,180,000 4. CFD support for Series #2 $90,000
Description Cost. Standard Plus Subscription (per user) £125.00 Client Access (per user) £0.00 Device Access (per device) £85.00 Platform Fee £450.00

Related to Description Cost

  • Construction Cost 3.1. Construction Cost does not include the fees of the ARCHITECT/ENGINEER and consultants, the cost of the land, rights- of-way, or other costs, which is the responsibility of the State as provided in Paragraphs 2.2 through 2.3. or any of the contingencies available for the project unless specifically stated otherwise. 3.2. Labor furnished by the State for the Project, however, with respect only to the construction of such components thereof as have been designed by the ARCHITECT/ENGINEER, shall be included in the Construction Cost at current market rates. Materials and equipment furnished by the State shall be included at current market prices, except that used materials and equipment shall be included as if purchased new for the Project.

  • Project Cost An updated cost spreadsheet reflecting the current forecasted cost vs. the latest approved budget vs. the baseline budget should be included in this section. One way to track project cost is to show: (1) Baseline Budget, (2) Latest Approved Budget, (3) Current Forecasted Cost Estimate, (4) Expenditures or Commitments to Date, and (5) Variance between Current Forecasted Cost and Latest Approved Budget. Line items should include all significant cost centers, such as prior costs, right-of-way, preliminary engineering, environmental mitigation, general engineering consultant, section design contracts, construction administration, utilities, construction packages, force accounts/task orders, wrap-up insurance, construction contingencies, management contingencies, and other contingencies. The line items can be broken-up in enough detail such that specific areas of cost change can be sufficiently tracked and future improvements made to the overall cost estimating methodology. A Program Total line should be included at the bottom of the spreadsheet. Narratives, tables, and/or graphs should accompany the updated cost spreadsheet, basically detailing the current cost status, reasons for cost deviations, impacts of cost overruns, and efforts to mitigate cost overruns. The following information should be provided:

  • PROPERTY DESCRIPTION The undersigned Xxxxxxxxx agrees to purchase from the undersigned owner (seller) through Ohio Real Estate Auctions, County, OH and known as

  • Construction Cost Budget The total cost to District of all elements of the Project designed or specified by the Architect, as adjusted at the end of each design phase in accordance with this Agreement. The Construction Cost Budget does not include the compensation of the Architect and the Architect’s Consultants, the cost of land, rights-of-way, financing or other costs which are the responsibility of the District, including construction management.

  • Construction Costs Under no circumstances shall the Consultant be liable for extra costs or other consequences due to unknown conditions or related to the failure of contractors to perform work in accordance with the plans and specifications. Consultant shall have no liability whatsoever for any costs arising out of the Client’s decision to obtain bids or proceed with construction before the Consultant has issued final, fully-approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!