Design Basis Report Sample Clauses

Design Basis Report. Consultant shall provide a narrative report describing for each design discipline its the rationale for the proposed systems. Disciplines shall include architectural, structural, mechanical, electrical, electronics and security systems, types of equipment, materials and finishes, and site development and landscaping. The rationale shall include initial costs, lifecycle costs, life expectancy and maintenance considerations. The design basis report shall include, for major building systems or components, i.e. those comprising 25% of all building systems or components, a description of the top two or three options considered, an evaluation of their pros and cons and why the preferred option is recommended.
AutoNDA by SimpleDocs
Design Basis Report. Consultant shall provide a brief narrative report by each design discipline describing its proposed design philosophy with a description of, and the rationale for the proposed structural systems, mechanical systems, electrical, electronics and security systems, types of equipment, materials and finishes, site development and landscaping as required by the Project.
Design Basis Report. 1.1 Hold project kick-off meeting to review project scope and schedule, introduce key team members, and discuss design concepts and goals. 1.2 Review existing information provided by Owner including existing drawings, property information, water use records, industry growth projections, and records to determine a reasonable future capacity for the pump station. 1.3 Evaluate the two force main alignments presented in the facility plan, and up to one (1) additional alignment. Evaluation of the alignments presented in the facility plan will consider alternative pump station sites and modifications to the alignments that may better serve potential development in the existing farmland area northeast of the intersection of Interstate 280 and West Locust Street. Evaluate up to three (3) alignments for the gravity sewer from the intersection of Interstate 280 and West Locust Street to existing manhole WD- 37 east of Utah Avenue. 1.4 Develop hydraulic calculations to determine pump size, wet well size, and force main size for each of the two force main alignments. 1.5 Coordinate with Iowa DOT to confirm casing requirements within DOT right-of-way. 1.6 Develop a planning level opinion of probable construction cost for pump station, force main route alternatives, and lagoon abandonment. 1.7 Summarize information into a Design Basis Report, and provide recommendations for the pump station location and force main alignment. 1.8 Perform quality control check on the Design Basis Report. 1.9 Submit digital (PDF) copy of Design Basis Report to the Owner for review. 1.10 Attend Design Basis Report review meeting. 1.11 Incorporate Owner comments to finalize Design Basis Report. 1.12 Submit digital (PDF) copy of final Design Basis Report to the Owner.

Related to Design Basis Report

  • CMI/RAI MDS Report Recognizing the mutual objective of quality resident care, the Employer agrees to meet through the Union Management Committee with the Union as soon as practicable after the receipt of the annual CMI/RAI MDS report. The Employer agrees to provide the Union with staffing levels, and staffing mix information; the impact of related payroll costs on staffing levels and a written notice of the CMI/RAI MDS report for the facility. The purpose of this meeting is to discuss the impact of the CMI/RAI MDS report on the staffing levels in the Home, quality resident care, and provide the Union with an opportunity to make representation in that regard. The parties shall meet as necessary to discuss other changes or workload issues. The parties may invite additional participants to attend the meeting to support constructive review and discussion.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Progress Report By March 1 of each year, ***** will submit a written annual report to Stanford covering the preceding calendar year. The report will include information sufficient to enable Stanford to satisfy reporting requirements of the U.S. Government and for Stanford to ascertain progress by ***** toward meeting this Agreement’s diligence requirements. Each report will describe, where relevant: *****’s progress toward commercialization of Licensed Product, including work completed, key scientific discoveries, summary of work-in-progress, current schedule of anticipated events or milestones, market plans for introduction of Licensed Product, and significant corporate transactions involving Licensed Product. ***** will specifically describe how each Licensed Product is related to each Licensed Patent.

  • Progress Reports The Recipient shall submit to the OPWC, at the OPWC's request, summary reports detailing the progress of the Project pursuant to this Agreement and any additional reports containing such information as the OPWC may reasonably require.

  • Problem Statement School bus fleets are aging, and our communities have poor air quality. Replacing school buses with zero emission school buses will address both of these issues.

  • SUBMISSION OF THE MONTHLY MI REPORT 4.1 The completed MI Report shall be completed electronically and returned to the Authority by uploading the electronic MI Report computer file to MISO in accordance with the instructions provided in MISO. 4.2 The Authority reserves the right (acting reasonably) to specify that the MI Report be submitted by the Supplier using an alternative communication to that specified in paragraph 4.1 above such as email. The Supplier agrees to comply with any such instructions provided they do not materially increase the burden on the Supplier.

  • Monthly Compliance Certificate Within thirty (30) days after the last day of each month and together with the Monthly Financial Statements, a duly completed Compliance Certificate signed by a Responsible Officer, certifying that as of the end of such month, Borrower was in full compliance with all of the terms and conditions of this Agreement, and setting forth calculations showing compliance with the financial covenants set forth in this Agreement and such other information as Bank shall reasonably request;

  • COST REPORT 27 A. CONTRACTOR shall submit separate individual and/or consolidated Cost Reports for Period 28 One, Period Two, and Period Three, or for a portion thereof, to COUNTY no later than sixty (60) 29 calendar days following the period for which they are prepared or termination of this Agreement. 30 CONTRACTOR shall prepare the individual and/or consolidated Cost Report in accordance with all 31 applicable federal, state and COUNTY requirements, GAAP and the Special Provisions Paragraph of 32 this Agreement. CONTRACTOR shall allocate direct and indirect costs to and between programs, cost 33 centers, services, and funding sources in accordance with such requirements and consistent with prudent 34 business practice, which costs and allocations shall be supported by source documentation maintained 35 by CONTRACTOR, and available at any time to ADMINISTRATOR upon reasonable notice. In the 36 event CONTRACTOR has multiple Agreements for mental health services that are administered by 37 HCA, consolidation of the individual Cost Reports into a single consolidated Cost Report may be 1 required, as stipulated by ADMINISTRATOR. CONTRACTOR shall submit a consolidated Cost 2 Report to COUNTY no later than five (5) business days following approval by ADMINSTRATOR of 3 all individual Cost Reports to be incorporated into a consolidated Cost Report. 4 1. If CONTRACTOR fails to submit an accurate and complete individual and/or consolidated 5 Cost Report within the time period specified above, ADMINISTRATOR shall have sole discretion to 6 impose one or both of the following: 7 a. CONTRACTOR may be assessed a late penalty of five hundred dollars ($500) for each 8 business day after the above specified due date that the accurate and complete individual and/or 9 consolidated Cost Report is not submitted. Imposition of the late penalty shall be at the sole discretion 10 of the ADMINISTRATOR. The late penalty shall be assessed separately on each outstanding individual 11 and/or consolidated Cost Report due COUNTY by CONTRACTOR. 12 b. ADMINISTRATOR may withhold or delay any or all payments due CONTRACTOR 13 pursuant to any or all agreements between COUNTY and CONTRACTOR until such time that the 14 accurate and complete individual and/or consolidated Cost Report is delivered to ADMINISTRATOR. 15 2. CONTRACTOR may request, in advance and in writing, an extension of the due date of the 16 individual and/or consolidated Cost Report setting forth good cause for justification of the request.

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.