Development Outputs Sample Clauses

Development Outputs.  National capacities in the development and application a country-driven ICAM methodology: Development of a common broad framework shared by different Ministries / Departments for the integration and application of coastal management objectives (tourism, land use, agriculture, water, etc.). Development of overall objectives guiding priorities, decisions and infrastructure investment plans by different Ministries / Departments with responsibilities in the development, protection and use of resources in coastal areas.  National experience in the policy and institutional integration of cross-sectoral coastal issues: Greater appreciation of the thematic, spatial and institutional interdependence of sectoral activities and improved capacity for strengthening the horizontal (across Departments) and vertical (national and local level) integration of policies with respect to those activities.  National experience in the application of ICAM tools and techniques: Incorporation of the tools of ICAM (CCA, SEA, EIRV) in the policy formulation process and use of such tools in establishing a common approach to the preparation, evaluation and review of plans and programmes in tourism, land use planning, agriculture, water resource management, transport infrastructure, environmental conservation, etc.  Exchange of national experience at the regional level: Greater awareness of prevailing coastal management approaches, problems and solution in the Mediterranean region and capacity to share, transfer and receive experiences and lessons within a common methodological context. Outputs at the level of each individual activity:  Half-yearly Progress Reports;  Technical Specifications;  Mission Reports;  Case Studies, training and workshops reports;  Final Project Reports;
AutoNDA by SimpleDocs

Related to Development Outputs

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Research Project 3.1 These Materials and Data will be used by Recipient's PI solely in connection with the Research Project, as named and described in the attached research application (insert Research Project name below):

  • Commercialization Intrexon shall have the right to develop and Commercialize the Reverted Products itself or with one or more Third Parties, and shall have the right, without obligation to Fibrocell, to take any such actions in connection with such activities as Intrexon (or its designee), at its discretion, deems appropriate.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!