ELECTRICAL DESIGN REQUIREMENTS Sample Clauses

ELECTRICAL DESIGN REQUIREMENTS. The requirements for the design of the electrical distribution system and the morality lighting shall be submitted to the Town of Ajax for review and approval prior to the commencement of the design.
AutoNDA by SimpleDocs
ELECTRICAL DESIGN REQUIREMENTS. The existing transformer specification is as follows: Secondary Primary 70kVP 1370mAM 380V 252A The existing transformers are rated to supply 270.4µA/m2 to the field. It is the Contractor’s responsibility to design and provide a single adequately sized HFPS unit per field for the application at Duvha Power Station that has as a minimum the following secondary output rating: 80 1900 The minimum method of cooling employed is Oil Natural Air Natural (ONAN) taking site altitude and temperature rise into consideration. Based on the applicable ambient and environmental conditions ONWF (Oil Natural Water Forced) cooling is not preferred. High Frequency is defined as operating at 20 kHz or above on the secondary side. The Contractor supplies a three-phase HFPS that shall result in the ESP efficiency improvement and yield an overall optimal output. The scope includes but is not limited to replacing the first 3 fields’ conventional Transformer Rectifier with the HFPSs on both casings per unit. It is not the intent of this project to change the existing electrical power reticulation including the power supply configuration as much as possible. • The expectation is that the 1250kVA Precipitator Transformer must be adequate for the installation of HFPS on the first 3 fields. • The Contractor notifies the Employer by means of a power reticulation study whether the 1250kVA Precipitator Transformer is adequate to accommodate HFPS on the remaining fields to allow the Employer to make the necessary arrangements to accommodate HFPS’s at a later stage on the remaining fields. • The Contractor verifies the phase balancing on the remaining fields that are fitted with Rectifier Transformers after installation of the HFPS on the first 3 fields. The new HFPSs are adequately designed to operate optimally under the following abnormal conditions. • The new HFPSs must be adequately designed to operate optimally under the following abnormal conditions: o Continuous primary voltage overloading at 110% and undervoltage of 90% of the transformer design o The HFTs should comply to the volt dip immunity criteria as per Eskom standard 240- 56361454 for primary under Voltage disturbances: ▪ A three phase voltage drop to zero for 0.2 s ▪ A voltage drop to 75% of nominal voltage for 1 s ▪ A voltage drop to 85% of nominal voltage for 60 s. ▪ The Contractor will be responsible for demonstrating under test conditions that this criteria is met. • Ambient temperatures of up to 50°C in full sun on to...

Related to ELECTRICAL DESIGN REQUIREMENTS

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Technical Requirements 4.5.3.1 Tandem Switching shall have the same capabilities or equivalent capabilities as those described in Telcordia TR-TSY-000540 Issue 2R2, Tandem Supplement, June 1, 1990. The requirements for Tandem Switching include but are not limited to the following: 4.5.3.1.1 Tandem Switching shall provide signaling to establish a tandem connection; 4.5.3.1.2 Tandem Switching will provide screening as jointly agreed to by <<customer_short_name>> and BellSouth; 4.5.3.1.3 Where applicable, Tandem Switching shall provide AIN triggers supporting AIN features where such routing is not available from the originating end office switch, to the extent such Tandem switch has such capability; 4.5.3.1.4 Where applicable, Tandem Switching shall provide access to Toll Free number database; 4.5.3.1.5 Tandem Switching shall provide connectivity to Public Safety Answering Point (PSAP)s where 911 solutions are deployed and the tandem is used for 911; and 4.5.3.1.6 Where appropriate, Tandem Switching shall provide connectivity for the purpose of routing transit traffic to and from other carriers. 4.5.3.2 BellSouth may perform testing and fault isolation on the underlying switch that is providing Tandem Switching. Such testing shall be testing routinely performed by BellSouth. The results and reports of the testing shall be made available to <<customer_short_name>>. 4.5.3.3 BellSouth shall control congestion points and network abnormalities. All traffic will be restricted in a non-discriminatory manner. 4.5.3.4 Tandem Switching shall process originating toll free traffic received from <<customer_short_name>>’s local switch. 4.5.3.5 In support of AIN triggers and features, Tandem Switching shall provide SSP capabilities when these capabilities are not available from the Local Switching Network Element to the extent such Tandem Switch has such capability.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Network Requirements Customer shall be responsible for ensuring that all aspects of the applicable network environment(s) adhere to the applicable standards and requirements specified in the Documentation and are configured appropriately to its proposed use of Ordered SaaS Services.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Compliance with Accessibility Standards All parties to this Agreement shall ensure that the plans for and the construction of all projects subject to this Agreement are in compliance with standards issued or approved by the Texas Department of Licensing and Regulation (TDLR) as meeting or consistent with minimum accessibility requirements of the Americans with Disabilities Act (P.L. 101-336) (ADA).

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)