EMISSION UNITS Sample Clauses

EMISSION UNITS. ‌ The emissions units located at the facility at the time of permit issuance are: Emission Unit Description Manufacturer /Model Date of Construction Emission Control Equipment Hazardous Waste Combustors Incineration Unit #2 (Incinerator) with a Maximum Heat Capacity of 16 mmBtu/hr Trade Waste Incineration, TWI- 2000, Series 2 October 1986 Activated Carbon Injection (see condition 1.4), Joy- Niro Spray Dryer Absorber (SDA-2), Pulse Flo Fabric Filter (BH-2) Emission Unit Description Manufacturer /Model Date of Construction Emission Control Equipment Incineration Unit #3 (Incinerator) with a Maximum Heat Capacity of 16 mmBtu/hr Trade Waste Incineration, TWI- 2000, Series 2 November 1987 Activated Carbon Injection (see condition 1.4), Joy- Niro Spray Dryer Absorber (SDA-3), Pulse Flo Fabric Filter (BH-3) Incineration Unit #4 (Rotary Kiln) with a Maximum Heat Capacity of 50 mmBtu/hr International Waste Energy, PY*ROX June 1988 Tempering Chamber, Activated Carbon Injection, Spray Dryer Absorber, Fabric Filter Material Processing Areas Waste Processing Units (Area 1 and Area 2) 1988 None Lab Pack Repack Unit 1988 Drum Crusher Empty drums are crushed 1984 None Emission Unit Description Manufacturer /Model Date of Construction Emission Control Equipment Storage Tanks for Liquid Wastes Tanks #2 (4,931 gals), #4 (4,931 gals), #6 (7,200 gals), #8 (5,820 gals), #10 (12,869 gals), #20 (12,869 gals), #30 (12,869 gals), #40 (12,869 gals), #50 (12,869 gals), #60 (12,869 gals), #300 (19,850 gals), #302 (30,000 gals), #304 (30,000 gals), #306 (30,000 gals), #308 (30,000 gals), #310 (30,000 gals), #312 (10,000 gals) and #314 (10,000 gals) Modern Welding April 2002 for #2 and #4; June 2004 for #10 and #20; March 2009 for #30; 1988 for the others Activated Carbon Absorption Systems on each storage tank vent Storage tank for #2 fuel oil: Tank #390 (30,000 gals) Modern Welding 1988 None Bulk Solid Waste Storage Facility Temporary storage of bulk solid wastes in pits prior to being fed to Incineration Unit #4 1988 Cyclone, Airtol Baghouse (BF Bldg- BH-1), Carbon Adsorption Unit (BF Bldg-CA) Gasoline Storage Tank 550 gallon tank, equipped with submerged loading pipe June 2012 None Boiler Natural Gas-Fired Boiler with a Maximum Heat Capacity of 10.6 mmBtu/hr (Boiler #1) Xxxxxxx Xxxxxx, 250 November 1995 None Emergency Generators (2) Two #2 Fuel oil-fired Emergency Generators each with Maximum Heat Capacity of 0.40 mmBtu/hr (<112 kilowatts (kW)) 1988 None Emission Unit Description Ma...
AutoNDA by SimpleDocs

Related to EMISSION UNITS

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures.

  • Dedicated Transport A DS0-, DS1-, or DS3-capacity transmission facility between Verizon switches (as identified in the LERG) or UNE Wire Centers, within a LATA, that is dedicated to a particular end user or carrier. Dedicated Transport is sometimes referred to as dedicated interoffice facilities ("IOF"). Dedicated Transport does not include any facility that does not connect a pair of Verizon UNE Wire Centers.

  • Clearcutting Units All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Receipt Points The Points of Receipt are listed in Appendix 2.

  • Training Units “Training Units” are Red Hat's training credits that may be redeemed by you for any Training as set forth at xxxxx://xxx.xxxxxx.xxx/training/specials/multi_student_discount/ and xxxxx://xxx.xxxxxx.xxx/training/corporate/TUs/.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

Time is Money Join Law Insider Premium to draft better contracts faster.