ENGINEERING AND CONSTRUCTION REQUIREMENTS Sample Clauses

ENGINEERING AND CONSTRUCTION REQUIREMENTS. 3.1 All elements of engineering and construction of Generating Facilities are Seller’s responsibility. 3.2 Seller shall provide services as described herein and pursuant to Exhibit 11 – Engineering and Construction Requirements. 3.3 Seller shall establish mutually agreeable milestones with the Buyer to complete all Work in this Agreement. 3.4 Seller shall provide bi-weekly status reports throughout this phase, as well as any additional briefing requested by Buyer. 3.5 Seller will create, maintain and provide to Buyer, minutes of meetings between Buyer’s representatives and Seller’s Project Management Team.
AutoNDA by SimpleDocs
ENGINEERING AND CONSTRUCTION REQUIREMENTS. 3.1 All elements of engineering, construction and installation of the applicable Generating Facilities and compliance with all state, local and utility requirements are Seller’s sole responsibility, provided that Buyer cooperates in good faith with Seller to satisfy the local and state requirements and those of the Local Electric Utility. 3.2 Seller shall provide services as described herein and pursuant to Exhibit 5 [Engineering and Construction Requirements]. 3.3 Seller must comply with all insurance requirements as set forth in Exhibit 10 [Insurance Requirements]. 3.4 Seller shall provide bi-weekly status reports throughout the design and construction phase, as well as any additional briefing requested by Xxxxx. 3.5 Seller will create, maintain and provide to Buyer, minutes of meetings between Xxxxx’s representatives and Seller’s Project Management Team.
ENGINEERING AND CONSTRUCTION REQUIREMENTS. All elements of engineering and construction of RPG Systems are Seller’s responsibility. Seller shall provide services as described herein and pursuant to Attachment 5 – Engineering and Construction Requirements. Seller shall establish mutually agreeable milestones with the Buyer to complete al Work in this Agreement. Seller shall provide bi-weekly status reports throughout this phase, as well as any additional briefing requested by Xxxxx. Seller will create, maintain and provide to Buyer, minutes of meetings between Xxxxx’s representatives and Seller’s Project Management Team. CEQA Compliance Compliance with the California Environmental Quality Act (“CEQA”), Pub. Res. Code § 21000 et seq., is a condition precedent to the Buyer’s obligations under this Agreement. The Seller shall not have any right to install the System until the Buyer has fully complied with CEQA and issued a notice to proceed to Seller. Xxxxx agrees to begin the initial analysis within ten (10) days after the effective date of this Agreement. If that analysis indicates that an exemption or negative declaration will suffice, then Xxxxx will proceed to complete the exemption or negative declaration in accordance with applicable law. Seller shall promptly reimburse Buyer for Buyer costs for such analysis and completion of exemption or negative declaration no later than 30 days after Xxxxx sends invoice for same to Seller. Seller shall promptly proceed to perform its obligations under this Agreement. If the Buyer determines that a mitigated negative declaration (“MND”) or environmental impact report (“EIR”) is required to comply with CEQA, then Seller shall be responsible for paying Buyer all costs associated with preparing the MND or EIR and complying with CEQA, including but not limited to environmental consultant costs and implementation of any feasible mitigation measures or alternatives the Buyer determines is needed to mitigate or avoid the project’s potentially significant environmental impacts. Buyer shall notify Seller of its determination that an MND or EIR is required, and the estimated costs and timing of preparing the MND or EIR. If after such notice, the Seller determines not to proceed, then this Agreement shall terminate and neither Party shall have any further obligations or liability to the other. Such a determination not to proceed on the part of the Seller may only be reasonably based on the exceptional costs associated with the MND or EIR and mitigation measures or alter...
ENGINEERING AND CONSTRUCTION REQUIREMENTS. All elements of design, engineering and construction of the System are Seller’s responsibility. Seller shall design, engineer and construct the System in accordance with the engineering and construction requirements set forth on Exhibit 6-1 hereto (the “Engineering and Construction Requirements”) and timelines for milestones set forth on Exhibit 8 (the “Milestones”).
ENGINEERING AND CONSTRUCTION REQUIREMENTS. 3.1 All elements of engineering and construction of RPG Systems are Seller’s responsibility. 3.2 Seller shall provide services as described herein and pursuant to Attachment 5 – Engineering and Construction Requirements. 3.3 Seller shall establish mutually agreeable milestones with the Buyer to complete al Work in this Agreement. 3.4 Seller shall provide bi-weekly status reports throughout this phase, as well as any additional briefing requested by Xxxxx. 3.5 Seller will create, maintain and provide to Buyer, minutes of meetings between Xxxxx’s representatives and Seller’s Project Management Team.
ENGINEERING AND CONSTRUCTION REQUIREMENTS 

Related to ENGINEERING AND CONSTRUCTION REQUIREMENTS

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State. 4.3.2 The Contractor shall be responsible to the State for the acts and omissions of his / her employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with the Contractor. 4.3.3 The Contractor shall not be relieved from his / her obligations to perform the Work in accordance with the Contract Documents either by the activities or duties of the Architect in his / her administration of the Contract, or by inspections, tests or approvals required or performed under Paragraph 7.7 by persons other than the Contractor. 4.3.4 The Contractor shall acquaint himself (herself / itself) with the limits of the property or right- of-way of the State and shall not trespass on other property. The Contractor shall adequately protect the project, adjacent property and the public, and shall be responsible for any damage or injury due to the Contractor’s act or neglect, and shall save the State harmless in respect thereto. 4.3.5 All work shall be done in such a manner as not to interfere with the State’s operating functions. Contractor and his employees shall familiarize themselves and comply with all rules and regulations applicable to the project. 4.3.6 The Contractor shall keep the premises free from liens arising out of or from the Project. Contractor shall obtain and submit waivers of liens with a request for a progress or final payment.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;

  • Design Requirements The DG Facility shall be installed in compliance with Wisconsin Administrative Code Chapter PSC 119.

  • Applicable Law and Construction This Lease may be executed in counterparts, shall be construed as a sealed instrument, and shall be governed exclusively by the provisions hereof and by the laws of the state where the Property is located without regard to principles of choice of law or conflicts of law. A facsimile signature to this Lease shall be sufficient to prove the execution by a party. If any provisions shall to any extent be invalid, the remainder shall not be affected. Other than contemporaneous instruments executed and delivered of even date, if any, this Lease contains all of the agreements between Landlord and Tenant relating in any way to the Premises and supersedes all prior agreements and dealings between them. There are no oral agreements between Landlord and Tenant relating to this Lease or the Premises. This Lease may be amended only by instrument in writing executed and delivered by both Landlord and Tenant. The provisions of this Lease shall bind Landlord and Tenant and their respective successors and assigns, and shall inure to the benefit of Landlord and its successors and assigns and of Tenant and its permitted successors and assigns, subject to Article 13. The titles are for convenience only and shall not be considered a part of this Lease. This Lease shall not be construed more strictly against one party than against the other merely by virtue of the fact that it may have been prepared primarily by counsel for one of the parties, it being recognized that both Landlord and Tenant have contributed substantially and materially to the preparation of this Lease. If Tenant is granted any extension or other option, to be effective the exercise (and notice thereof) shall be unconditional; and if Tenant purports to condition the exercise of any option or to vary its terms in any manner, then the purported exercise shall be ineffective. The enumeration of specific examples of a general provision shall not be construed as a limitation of the general provision. Unless a party’s approval or consent is required by the express terms of this Lease not to be unreasonably withheld, such approval or consent may be withheld in the party’s sole discretion. The submission of a form of this Lease or any summary of its terms shall not constitute an offer by Landlord to Tenant; but a leasehold shall only be created and the parties bound when this Lease is executed and delivered by both Landlord and Tenant and approved by the holder of any mortgage of the Premises having the right to approve this Lease. Nothing herein shall be construed as creating the relationship between Landlord and Tenant of principal and agent, or of partners or joint venturers or any relationship other than landlord and tenant. This Lease and all consents, notices, approvals and all other related documents may be reproduced by any party by any electronic means or by facsimile, photographic, microfilm, microfiche or other reproduction process and the originals may be destroyed; and each party agrees that any reproductions shall be as admissible in evidence in any judicial or administrative proceeding as the original itself (whether or not the original is in existence and whether or not reproduction was made in the regular course of business), and that any further reproduction of such reproduction shall likewise be admissible. If any payment in the nature of interest provided for in this Lease shall exceed the maximum interest permitted under controlling law, as established by final judgment of a court, then such interest shall instead be at the maximum permitted interest rate as established by such judgment.

  • Review and Construction of Documents Each Party herein expressly represents and warrants to all other Parties hereto that (a) before executing this Agreement, said Party has fully informed itself of the terms, contents, conditions and effects of this Agreement; (b) said Party has relied solely and completely upon its own judgment in executing this Agreement; (c) said Party has had the opportunity to seek and has obtained the advice of its own legal, tax and business advisors before executing this Agreement; (d) said Party has acted voluntarily and of its own free will in executing this Agreement; and (e) this Agreement is the result of arm’s length negotiations conducted by and among the Parties and their respective counsel.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians. (ii) The Contractor shall, pursuant to the notice under Clause 11.17 (i), suspend the Works or any part thereof for such time and in such manner as may be specified by the Authority and thereupon carry out remedial measures to secure the safety of suspended works, the Users and pedestrians. The Contractor may by notice require the Authority’s Engineer to inspect such remedial measures forthwith and make a report to the Authority recommending whether or not the suspension hereunder may be revoked. Upon receiving the recommendations of the Authority’s Engineer, the Authority shall either revoke such suspension or instruct the Contractor to carry out such other and further remedial measures as may be necessary in the reasonable opinion of the Authority, and the procedure set forth in this Clause 11.17 shall be repeated until the suspension hereunder is revoked. (iii) Subject to the provisions of Clause 21.6, all reasonable costs incurred for maintaining and protecting the Works or part thereof during the period of suspension (the “Preservation Costs”), shall be borne by the Contractor; provided that if the suspension has occurred as a result of any breach of this Agreement by the Authority, the Preservation Costs shall be borne by the Authority. (iv) If suspension of Works is for reasons not attributable to the Contractor, the Authority’s Engineer shall determine any Time Extension to which the Contractor is reasonably entitled.

  • Training Requirements Grantee shall: A. Authorize and require staff (including volunteers) to attend training, conferences, and meetings as directed by DSHS; B. Appropriately budget funds in order to meet training requirements in a timely manner, and ensure that staff and volunteers are trained as specified in the training requirements listed at xxxxx://xxx.xxxx.xxxxx.xxx/hivstd/training/ and as otherwise specified by DSHS. Grantee shall document that these training requirements are met; and C. Ensure that staff hired for HIV and syphilis testing are trained to perform blood draws within three (3) months of employment.