Equipments of Renewable Energies Sample Clauses

Equipments of Renewable Energies. CERE will carry out the Certification Process of several client products (see models in offer) according to the regulation included into the offer. Some models will be tested and some other will be included as variant models (when applicable). This variant model acceptance criteria will be: Provided that they have same hardware and firmware than the tested inverter and fulfill one of the following option • Within a family, higher and lower power units shall be tested. • Variant models can be included if the current is within ± 50% of the output rated current tested. - For RD 244/2019 the rule is +50% and -80% of the nominal current tested - For VDE, the criterion is specified on Clause 2.12.2 of FGW TR8 Rev 9 for Type 2 generators (choose one): o 1 √10 times and twice of the rated power of the power generating unit to be measured. o The power limits shown above can be exceeded or fallen short of, upon consultation with the certification body. The additional transfer must be justified in the certificate and all the process shalk be documented in the internal documentation. • In the case of a modular system, all the variant models can be included testing the module with lower power. The Client models under the scope of work of this offer are described into the offer. The proposed testing laboratory for the process is: • CERE. If the client does not accept, this must be communicated to CERE before starting the process in order to find other accredited testing laboratory according to ISO 17025 ILAC member for the standard of the certification process. Inspections: • Initial Inspection: it is necessary an initial inspection before issuing the final certificate. • Annual Certification Maintenance: Every year shall be done the annual inspections according to the CERE inspection procedure. The inspections conditions are shown in the Certification Conditions enclosed in the offer. In order to carry out the work, CERE should receive the following information for each of the PRODUCT to be certified: • Application form • Electrical scheme. • List of critical components. • Algorithm control version and firmware version. • Instructions’ manual. • Quality certificate according to ISO 9001 of the manufacturer company • Trademark • Model • Nominal Power • Electrical characteristics of input and output (V, I, f) • Control software versión The certification process is carried out taking into account the following conditions: • Corresponds only to CERE determinate if some dif...
AutoNDA by SimpleDocs

Related to Equipments of Renewable Energies

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Availability of Verizon Telecommunications Services 3.1 Verizon will provide a Verizon Telecommunications Service to Z-Tel for resale pursuant to this Attachment where and to the same extent, but only where and to the same extent, that such Verizon Telecommunications Service is provided to Verizon’s Customers. 3.2 Except as otherwise required by Applicable Law, subject to Section 3.1, Verizon shall have the right to add, modify, grandfather, discontinue or withdraw, Verizon Telecommunications Services at any time, without the consent of Z-Tel. 3.3 To the extent required by Applicable Law, the Verizon Telecommunications Services to be provided to Z-Tel for resale pursuant to this Attachment will include a Verizon Telecommunications Service customer-specific contract service arrangement (“CSA”) (such as a customer specific pricing arrangement or individual case based pricing arrangement) that Verizon is providing to a Verizon Customer at the time the CSA is requested by Z-Tel.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Procurement of Small Works Works estimated to cost $250,000 equivalent or less per contract, up to an aggregate amount not to exceed $800,000 equivalent, may be procured under lump-sum, fixed-price contracts awarded on the basis of quotations obtained from three (3) qualified domestic contractors in response to a written invitation. The invitation shall include a detailed description of the works, including basic specifications, the required completion date, a basic form of agreement acceptable to the Bank, and relevant drawings, where applicable. The award shall be made to the contractor who offers the lowest price quotation for the required work, and who has the experience and resources to complete the contract successfully. Part D: Review by the Bank of Procurement Decisions

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Nature of Business; International Operations Neither the Borrower nor any Restricted Subsidiary will allow any material change to be made in the character of its business as an independent oil and gas exploration and production company. From and after the date hereof, the Borrower and its Domestic Subsidiaries will not acquire or make any other expenditure (whether such expenditure is capital, operating or otherwise) in or related to, any Oil and Gas Properties not located within the geographical boundaries of the United States.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!