EXCAVATING AND BACKFILLING Sample Clauses

EXCAVATING AND BACKFILLING. A. An excavation shall be considered unclassified excavation and include all materials encountered. B. Excavate trenches of sufficient depth and width to permit proper handling and installation of pipe and fittings. C. If the pulling method is used, the pipe "plow" shall be a vibratory type. Starting and finishing holes for pipe pulling shall not exceed a 1'-0" by 3'-0" opening. D. Excavate to depths required to provide 2" depth of earth fill or sand bedding for piping when rock or other unsuitable bearing material is encountered. X. Xxxx to match adjacent grade elevations with approved earth fill materials. Place and compact fill in layers not greater than 6" depth. Provide approved earth fill or sand to a point 4" above the top of pipe. Fill to within 6" of final grade with approved excavated or borrow fill materials free of lumps or rocks larger than 2" in any dimension. Provide clean topsoil free of rocks and debris for top 6" of fill. Install irrigation lines with a minimum cover of 24" for main lines. 12" for laterals based on existing finished grades. F. Excavate trenches and install piping and fill during the same working day. Do not leave trenches or partially filled trenches open overnight. G. Promptly notify the Architect of unexpected sub-surface conditions.
AutoNDA by SimpleDocs
EXCAVATING AND BACKFILLING. A. Excavating shall be considered unclassified and shall include all materials encountered, except materials that cannot be excavated by normal mechanical means. Excavate trenches of sufficient depth and width to permit proper handling and installation of pipe and fittings. Excavate to depths required to provide 2" depth of earth fill or sand bedding for piping when rock or other unsuitable bearing material is encountered. B. Pipe pulling will be allowed for lateral pipe only, provided soil moisture content and other conditions are suitable to allow for full depth of bury with a minimum of stretching and scraping of the pipe, DPSCD reserves the right to determine suitability or conditions, If the pulling method is used, the pipe "plow" shall be a vibratory type. C. Fill to match adjacent grade elevation with approved earth fill material. Place and compact fill in layers not greater than 8" depth. D. Provide approved fine-grained earth fill or sand to point 4" above the top of pipe, where soil conditions are rocky or otherwise objection able. E. Fill to within 6" of final grade with approved excavated or borrowed fill materials free of lumps or rocks larger than 2" in any dimension. F. The top 6" of backfill shall be topsoil, free of rocks, subsoil or trash. Any special soil mixture shall be replaced to the original condition it was prior to irrigation installation. G. Except as indicated, install irrigation mains with a minimum cover of 18" based on finished grades. Install irrigation laterals with a minimum cover of 14" based on finished grades. H. Excavate trenches and install piping and backfill during the same working day. Do not leave open trenches or partially filled trenches open overnight.
EXCAVATING AND BACKFILLING. Excavations required for the installation of conduit, foundations, and other facilities shall be performed in a manner to cause the least possible damage to the streets, sidewalks, and other improvements, including private property. 1. Excavations shall not be larger than necessary for the proper installation of conduit, electrical facilities, and foundations. 2. Excavating shall not be performed until immediately before installation of conduit, facilities, and foundations. Excavations shall not remain open overnight except as approved by the Engineer and only when adequate protection for the public, including pedestrians, is provided. The material from the excavation shall be placed in a position where the least disruption and obstruction to vehicular and pedestrian traffic will be realized and the least interference with surface drainage will occur. Surplus excavated material shall be removed and disposed of by the Contractor outside of the right-of-way. At the end of each day's work, and at other times when construction operations are suspended, equipment and other obstructions shall be removed from the right-of-way. Structural excavation and backfill shall conform to the requirements of Sections 206, "Structure Excavation," and 207, "Structure Backfill." Trench excavations shall be backfilled in conformance with the requirements of Section 208, "Trench Excavation and Backfill." Backfilled excavations shall be kept well filled and maintained in a smooth and well- drained condition, until permanent resurfacing is completed as specified in Subsection 208.03.21, "Cutting and Restoring Street Surfacing." Unless otherwise specified in the Contract Documents, excavation in the street and highway shall be performed in such a manner that not more than 1 lane of traffic is restricted in either direction at any time, or as approved by the Engineer. All streets upon or within which any work is being done shall be kept open to all traffic by the Contractor, as specified in Subsection 104.04, "Maintenance of Traffic," unless otherwise provided in the Special Provisions, or as approved by the Engineer. Surface and underground materials, irrigation systems, utilities, and other constructions shall be restored in kind to or exceeding the original conditions by the Contractor as part of the excavation and backfilling operations. Barricading shall conform to the latest editions of the Traffic Control Plans for Highway Work Zones for the Xxxxx County Area and the Manual o...

Related to EXCAVATING AND BACKFILLING

  • CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Screening After you sign and date the consent document, you will begin screening. The purpose of the screening is to find out if you meet all of the requirements to take part in the study. Procedures that will be completed during the study (including screening) are described below. If you do not meet the requirements, you will not be able to take part in the study. The study investigator or study staff will explain why. As part of screening, you must complete all of the items listed below: • Give your race, age, gender, and ethnicity • Give your medical history o You must review and confirm the information in your medical history questionnaire • Give your drug, alcohol, and tobacco use history • Give your past and current medication and treatment history. This includes any over-the-counter or prescription drugs, such as vitamins, dietary supplements, or herbal supplements, taken in the past 28 days • Height and weight will be measured • Physical exam will be done • Electrocardiogram (ECG) will be collected. An ECG measures the electrical activity of the heart • You may be tested for COVID-19 o Blood tests for human immunodeficiency virus (HIV), hepatitis B, and hepatitis C o Blood tests to see how your blood clots ▪ Fibrinogen ▪ PT/INR/aPTT o Blood tests for amylase and lipase (enzymes that help with digestion, Part B only) o Blood tests for a lipid (fats) panel (Part B only) ▪ Total cholesterol ▪ Triglycerides ▪ HDL ▪ Direct HDL o Blood tests to check your thyroid function (Part B and Part C only) ▪ TSH ▪ Free T4 o Urine to test for drugs of abuse (illegal and prescription) o Urine tests to check your albumin/ creatinine ratio o Females who have not had a period for at least 12 months in a row will have a blood hormone test to confirm they cannot have children • The study investigator may decide to do an alcohol breath test • The use of proper birth control will be reviewed (males only) • You will be asked “How do you feel?” HIV, hepatitis B, and hepatitis C will be tested at screening. If anyone is exposed to your blood during the study, you will have these tests done again. If you have a positive test, you cannot be in or remain in the study. HIV is the virus that causes acquired immunodeficiency syndrome (AIDS). If your HIV test is positive, you will be told about the results. It may take weeks or months after being infected with HIV for the test to be positive. The HIV test is not always right. Having certain infections or positive test results may have to be reported to the State Department of Health. This includes results for HIV, hepatitis, and other infections. If you have any questions about what information is required to be reported, please ask the study investigator or study staff. Although this testing is meant to be private, complete privacy cannot be guaranteed. For example, it is possible for a court of law to get health or study records without your permission.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly. 4.14.2 The Contractor shall not damage or endanger any portion of the Work or the work of the State or any separate contractors by cutting, patching or otherwise altering any work, or by excavation. The Contractor shall not cut or otherwise alter the work of the State or any separate contractor except with the written consent of the State and of such separate contractor. The Contractor shall not unreasonably withhold from the State or any separate contractor his consent to cutting or otherwise altering the Work.