Final Monitoring Schematic Sample Clauses

Final Monitoring Schematic. (All Projects >= 30 kW and/or projects paired with on-site renewable generators)
AutoNDA by SimpleDocs
Final Monitoring Schematic. (for projects that are 30 kW or larger and/or projects paired with on-site renewable generators) The final monitoring schematic is an electrical single line diagram (SLD) that includes the energy storage system, the inverter, the PBI meter, the utility meter, the load panel and, when applicable, the on-site renewable generator with which the energy storage system is paired. Documentation must also be provided if there is a change in the make and model of the meters to be used (from what was submitted with the Preliminary Monitoring Plan at the Reservation Request). The Applicant must also provide the name of the Performance Data Provider (PDP) they are contracting with. A copy of the contract between the PDP and the Applicant may be requested at the Program Administrator’s discretion.
Final Monitoring Schematic. (for projects that are 30 kW or larger) The final monitoring schematic includes an electrical single line diagram (SLD) that includes the generator, the PBI meter, the utility meter, and the load panel. CHP projects must also include a Process and Instrumentation Diagram (P&ID) that shows the configuration of the generator(s), heat recovery system, pumps, heat exchangers, and thermal load equipment as well as the fuel and thermal metering points. Documentation must also be provided if there is a change in the make and model of the meters to be used (from what was submitted with the Proposed Monitoring Plan at the Proof of Project Milestone). The applicant must also provide the name of the Performance Data Provider (PDP) they are contracting with. A copy of the contract between the PDP and the applicant may be requested at the Program Administrator’s discretion.

Related to Final Monitoring Schematic

  • Monitoring Services IDT staff shall, using methods that include face-to-face and other contacts with the member, monitor the services a member receives. This monitoring shall ensure that:

  • Monitoring Plan keep up with the objectives from the cadetship practice booklet; taking daily notes as well as learning new information every day; currently reporting to the supervisor. Evaluation plan: the final result should be in accordance with the traineeship’s aims and objectives, achieving an improvement of specialty knowledge and language skills. The level of language competence9 in English that the trainee already has or agrees to acquire by the start of the mobility period is: A1 ☐ A2 ☐ B1 ☐ B2 ☒ C1 ☐ C2 ☐ Native speaker ☐ Table B - Sending Institution Please use only one of the following three boxes: 10 The traineeship is embedded in the curriculum and upon satisfactory completion of the traineeship, the institution undertakes to:Award ……...…ECTS credits (or equivalent)11 Give a grade based on: Traineeship certificate ☒ Final report ☒ Interview ☐ Record the traineeship in the trainee's Transcript of Records and Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☒ No ☐ The traineeship is voluntary and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Give a grade: Yes ☐ No ☐ If yes, please indicate if this will be based on: Traineeship certificate ☐ Final report ☐ Interview ☐ Record the traineeship in the trainee's Transcript of Records: Yes ☐ No ☐ Record the traineeship in the trainee's Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☐ No ☐ The traineeship is carried out by a recent graduate and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Record the traineeship in the trainee's Europass Mobility Document (highly recommended): Yes ☐ No ☐ Accident insurance for the trainee The Sending Institution will provide an accident insurance to the trainee (if not provided by the Receiving Organisation/Enterprise): Yes ☐ No ☒ The accident insurance covers: - accidents during travels made for work purposes: Yes ☐ No ☒ - accidents on the way to work and back from work: Yes ☐ No ☒

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Maintenance Programme 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.