Fugitive Dust Sample Clauses

Fugitive Dust. A regular watering program shall be initiated to adequately control the amount of fugitive dust in accordance with applicable AQMD rules. Exposed soil surfaces shall be sprayed with water at least daily and as needed to mitigate dust (see also Article 36.08-c, Protection of Facilities).
AutoNDA by SimpleDocs
Fugitive Dust. ‌ The Certificate Holder shall implement appropriate mitigation measures to control fugitive dust from roads and construction activities. The Certificate Holder shall use water or a water-based environmentally safe dust palliative such as lignin, for dust control on unpaved roads during Project construction.
Fugitive Dust. Operator must submit to the City a dust mitigation plan. Silica dust must be contained to the maximum extent reasonably practicable during the hydraulic fracturing process. Dust associated with on-site activities and traffic on access roads shall be minimized throughout construction, drilling and operational activities such that there are no visible dust emissions from access roads or the Well Sites to the extent practical given wind conditions. No untreated produced water or other process fluids shall be used for dust suppression. The Operator will avoid creating dust or dust suppression activities within three hundred (300) feet of the ordinary high water xxxx of any waterbody, unless the dust suppressant is water. Material Safety Data Sheets (MSDS) for any chemical-based dust suppressant, other than magnesium chloride, shall be submitted to the City prior to use.
Fugitive Dust. Fugitive Dust" is defined as that dust which drifts beyond the lot line of property on which dust is raised (for example, beyond the ROW line). Turtle Creek shall be responsible for addressing Fugitive Dust caused by Turtle Creek and its contractors. Fugitive Dust must be addressed when it creates a nuisance. A nuisance must bother a person or party and as such, dust drifting onto a vacant lot, pasture or field may not be a nuisance. When requested by the County, Turtle Creek shall reasonably address or minimize Fugitive Dust using water, calcium chloride, or other commercially available reasonable means; whichever is deemed most appropriate.
Fugitive Dust. The Permittee shall take all reasonable precautions to minimize the emissions of fugitive dust in accordance with §300 of Rule 310 and Rule 310.01.
Fugitive Dust. You agree to comply with the Fugitive Dust Rules established by your Local Air Pollution Control District and take “every reasonable precaution to minimize emissions.” Check local rules at: xxxx://xxx.xxx.xx.xxx/drdb/drdb.htm.
Fugitive Dust. Developer shall be responsible for addressing Significant Fugitive Dust created by the Developer Parties. When requested by the County, Developer shall reasonably address or minimize Significant Fugitive Dust using water, calcium chloride, or appropriate other commercially available reasonable means in Developer’s reasonable discretion.
AutoNDA by SimpleDocs
Fugitive Dust. All practicable methods (including watering, re-vegetation, synthetic cover, and/or chemical stabilization) shall be used to minimize fugitive particulates. The contractor will be responsible for developing and implementing a fugitive dust control plan. The plan and completed Air Pollutant Emission Notice (APEN) application shall be submitted and approved by the Colorado Department of Public Health and Environment’s Air Pollution Control Division prior to construction- related activities, if required by state law. Northern Water and/or NISP Enterprise shall adhere to Section 8.11 of the Land Use Code related to Air Quality Standards.

Related to Fugitive Dust

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Video Display Terminals ‌ The Employer shall ensure that any new office equipment or facility required for use in conjunction with VDTs shall meet the standards recommended by the Workers' Compensation Board.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Sensitive data Where the transfer involves personal data revealing racial or ethnic origin, political opinions, religious or philosophical beliefs, or trade union membership, genetic data, or biometric data for the purpose of uniquely identifying a natural person, data concerning health or a person’s sex life or sexual orientation, or data relating to criminal convictions and offences (hereinafter ‘sensitive data’), the data importer shall apply the specific restrictions and/or additional safeguards described in Annex I.B.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!