Generator Interconnection Process and Subscriber PTO Project Interconnection Sample Clauses

Generator Interconnection Process and Subscriber PTO Project Interconnection. Background The ISO has in place the Generator Interconnection and Deliverability Allocation Procedure, Appendix DD and Section 25 of the ISO tariff that governs generator interconnection. Generation to be connected to the Subscriber Participating TO transmission facilities during the construction and initial operation of those transmission facilities is required to go through the generator interconnection process to be connected to the ISO controlled grid like any other generator. If during the study process associated with development of the Subscriber Participating TO transmission facilities identifies additional network upgrades on the existing ISO system, the ISO tariff currently requires the interconnection customer to upfront finance those upgrades and be reimbursed by the affected Participating TO. In the Interconnection Process Enhancement 2021 initiative, the ISO addressed the question of reimbursement when the ISO is an affected system. The ISO proposed that external interconnection customers will be eligible for repayment of amounts advanced for network upgrades internal to the ISO need to maintain reliability, and the transmission owner will reimburse them in cash within five years of commercial operation of the generating facility.14 However, in the case where a subscriber-funded the transmission line will become part of the ISO controlled grid, but was not approved through the TPP process, there is an issues as to whether the initial generator causing the line to be built to connect to the ISO should be responsible for both the transmission interconnection and deliverability network upgrades, if applicable. For example, with respect to the proposed TransWest project and its subscriber, Public Company of Wyoming, could be responsible for upgrades on the existing ISO system as part of the overall interconnection of the Subscriber Participating TO project and might not be eligible for reimbursement for those costs. The thought is that the Subscriber PTO Model is predicated on not increasing the ISO’s TAC since the project was not chosen in the TPP process. However, if the affected Participating TOs included the generator interconnection upgrades, then the TAC would be increased. The ISO is seeking stakeholder comments on this detail. 14 Tariff Amendment to Implement Interconnection Process Enhancements filed January 26, 2023 (FERC Docket No. ER23-941) The generator will sign the three-party Generator Interconnection Agreement and be governed by ...
AutoNDA by SimpleDocs

Related to Generator Interconnection Process and Subscriber PTO Project Interconnection

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • By Interconnection Customer Interconnection Customer may unilaterally terminate the Interconnection Service Agreement pursuant to Applicable Laws and Regulations upon providing Transmission Provider and the Interconnected Transmission Owner sixty (60) days prior written notice thereof, provided that Interconnection Customer is not then in Default under the Interconnection Service Agreement.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change: