GEOMETRIC DESIGN SCHEMATIC (OF RECOMMENDED ALTERNATIVE Sample Clauses

GEOMETRIC DESIGN SCHEMATIC (OF RECOMMENDED ALTERNATIVE. Prepare the geometric design schematic horizontal layout to a design scale of 1 inch = 100 foot (or 1 inch = 200 foot, when directed by the FBCTRA.) Develop the schematic layout, exhibits, and attachments in English units. All Microsoft Office, MicroStation, Keyhole Markup Language (KML), Keyhole Markup Language Zipped (KMZ), and Bentley OpenRoads Designer computer graphic files furnished to the FBCTRA must be submitted on CD, DVD, or USB flash drive to the FBCTRA in their native format. Coordinate geometric schematic design with the Segment B-3 design team at the Sienna Levee and with the Segment C design team at FM 2759. Develop geometric design schematics based on the conceptual schematics after the basic layout, lane arrangement, and anticipated ROW and easement impacts depicted on the conceptual schematics are approved. Utilize Bentley OpenRoads Designer tools in performing this task. The geometric design schematics must include both a plan view and profile view. The geometric schematic plan view must contain the following design elements:
AutoNDA by SimpleDocs

Related to GEOMETRIC DESIGN SCHEMATIC (OF RECOMMENDED ALTERNATIVE

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Alternative Work Schedules Alternative work schedule means an approved schedule for an Employee that deviates from the work week described in Section 1, Section 2, or a schedule that deviates from a worksite’s normal schedule. Employees who work a “shift work schedule” as part of a rotating group of individuals who must continuously maintain a 24-hour operation or facility are not eligible for an alternative work schedule.

  • ELECTRICITY INFORMATION EXCHANGE PROTOCOLS 31.1 Protocols for exchanging information: The Distributor and the Trader must, when exchanging information to which an EIEP listed in Schedule 3 relates, comply with that EIEP.

  • Alternate Work Schedule An alternate work schedule is any work schedule where an employee is regularly scheduled to work five (5) days per week, but the employee’s regularly scheduled two (2) days off are NOT Saturday and Sunday.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

Time is Money Join Law Insider Premium to draft better contracts faster.