Infrastructure and Other Upgrades Sample Clauses

Infrastructure and Other Upgrades. (a) The Tenant shall be responsible for the construction and expense of the infrastructure upgrades to all services and utilities, including water, sewer, storm sewer, gas and, if necessary, hydro electricity services, within the Retail Lands required to be constructed as part of the Retail Project, as Approved by the Landlord. The Tenant shall remit to the Landlord, on behalf of OSEG as a project management fee, three percent (3%) of the Hard Costs and Soft Costs of such infrastructure upgrades. (b) Notwithstanding subparagraph (a), the Tenant shall not be responsible for (i) alleviating downstream capacity issues in the City’s water management system that result from the construction of infrastructure upgrades pursuant to this Section 4.4 and the costs incurred in connection therewith; and (ii) the incremental cost of any electricity transformer to be located on the Retail Lands to the extent that it has additional capacity not directly required for the Retail Project. (c) The City shall reimburse the Tenant for incremental design and construction costs of the Retail Component resulting from (i) the Design Solutions, including any increase in the cost of infrastructure upgrades pursuant to this Section 4.4 that results from the Design Solutions, (ii) the imposition by the City of sustainable site development, water efficiency, energy efficiency, materials selection and indoor environmental quality requirements that are greater than those required to achieve Silver certification under the Leadership in Energy and Environmental Design (LEED) Green Building Rating System for Core and Shell Development (known as LEED CS), except as required under applicable Law of general application, and (iii) the imposition by the City of accessibility requirements that are greater than those required under applicable Law of general application.
AutoNDA by SimpleDocs

Related to Infrastructure and Other Upgrades

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Turnaround There shall be a 10 hour rest period between the termination of work on one call and the commencement of work on the next call (see paragraph (f) below for specific rules) and a fifty-four (54) consecutive hour break for a five day week, and thirty-four (34) consecutive hour break for a six day week).

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to ICG.

  • MAINTENANCE AND REPAIR; RULES Tenant will, at its sole expense, keep and maintain the Premises and appurtenances in good and sanitary condition and repair during the term of this Agreement and any renewal thereof. Without limiting the generality of the foregoing, Tenant shall: (a) Not obstruct the driveways, sidewalks, courts, entry ways, stairs and/or halls, which shall be used for the purposes of ingress and egress only; (b) Keep all windows, glass, window coverings, doors, locks and hardware in good, clean order and repair; (c) Not obstruct or cover the windows or doors; (d) Not leave windows or doors in an open position during any inclement weather; (e) Not hang any laundry, clothing, sheets, etc. from any window, rail, porch or balcony nor air or dry any of same within any yard area or space; (f) Not cause or permit any locks or hooks to be placed upon any door or window without the prior written consent of Landlord; (g) Keep all air conditioning filters clean and free from dirt; (h) Keep all lavatories, sinks, toilets, and all other water and plumbing apparatus in good order and repair and shall use same only for the purposes for which they were constructed. Tenant shall not allow any sweepings, rubbish, sand, rags, ashes or other substances to be thrown or deposited therein. Any damage to any such apparatus and the cost of clearing stopped plumbing resulting from misuse shall be borne by Tenant; (i) And Tenant's family and guests shall at all times maintain order in the Premises and at all places on the Premises, and shall not make or permit any loud or improper noises, or otherwise disturb other residents; (j) Keep all radios, television sets, stereos, phonographs, etc., turned down to a level of sound that does not annoy or interfere with other residents; (k) Deposit all trash, garbage, rubbish or refuse in the locations provided therefor and shall not allow any trash, garbage, rubbish or refuse to be deposited or permitted to stand on the exterior of any building or within the common elements; (l) Abide by and be bound by any and all rules and regulations affecting the Premises or the common area appurtenant thereto which may be adopted or promulgated by the Condominium or Homeowners' Association having control over them.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.