Installation Documentation Sample Clauses

Installation Documentation. 19 5.3.6 Commissioning...................................................19 5.4
AutoNDA by SimpleDocs
Installation Documentation. The Seller shall deliver full installation documentation as defined in the document ,,Lieferumfang Aufbaudokumentation".
Installation Documentation. Within sixty (60) days after the execution of each Service Order, Customer will provide Switch with all required installation documentation. Switch will promptly provide Customer with notice of that all installation documentation has been received. If Customer fails to provide Switch with all required installation documentation, billing shall commence on the date set forth on the Service Order.
Installation Documentation. 45 B-9.1.2 INSTALLATION INSPECTIONS...............................................................46 SHIPPING..........................................................................................46 TRAINING..........................................................................................46
Installation Documentation. Supplier must at least two (2) weeks following the receipt of a Purchase Order provide AMD all information and documentation that is necessary or required for proper site preparation for installation.
Installation Documentation. Following the installation of the ICMv Inmate Telephone System the following documents shall be presented to the County. Over the life of the contract several of these documents, such as station maps, facility and user lists are subject to revision. When revisions are made Contractor shall provide County the revised versions and/or updates within 7 working days of completion.  Installation Checklists  Inmate Telephone Station Map  Inmate Telephone Trunk Map  Facility User ListEquipment List, Descriptions, and Locations  Workstation List with IP and Location InformationSupport Line and Non-Trunk Analog Line List  IT/Frame for Data and Voice Transmission Information  Site Schedules  Facility Block-Diagram  Equipment Photos (if requested and approved)  Service Incident Report  Service Contact InformationService Escalation Procedures and Contracts  ICMv User Manuals  Any other documentation specifically required by the Orange County
Installation Documentation. Seller shall provide Buyer with all relevant documentation for the goods, including operations and maintenance manuals, preventative maintenance procedures and lists of recommended parts; all of which shall be written in English and provided in the quantity requested by Buyer for the goods. Any installation services required in connection with the goods will be provided by Seller at no additional cost to Buyer, unless otherwise set forth in writing on the face of this Order. Buyer and Seller shall agree in writing on the schedule for such installation. If Buyer will be installing the goods, Seller will provide Buyer with all drawings and instructions on how to install the goods. Such documentation, drawings and instructions shall be provided electronically and in hard copy.
AutoNDA by SimpleDocs
Installation Documentation. Customer (or its sublicensee) will provide Supplier with all required installation documentation for any Customer Equipment, as further described in the applicable Service Order.

Related to Installation Documentation

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet

  • Construction Documents Phase Bidding or Negotiation Phase:

  • Product Documentation You should review the policy documents carefully to ensure they accurately reflect the cover, conditions, limits and other terms that you require. Particular attention should be paid to policy conditions and warranties as failure to comply with these could invalidate your policy. Claims can arise, under certain types of insurance contract, long after the expiry of the policy. It is therefore important that you retain and keep safely all documents associated with your policy.

  • Closing Documentation The Parent shall have received the --------------------- following documents, agreements and instruments from the Company: (i) an opinion of Xxxx Xxxx Xxxx & Freidenrich LLP, dated the Closing Date and addressed to the Parent and Newco, in substantially the form of Exhibit F hereto; --------- (ii) certificates dated as of a recent date from the Secretary of State of the States of Delaware and any other applicable states to the effect that each of the Company and its Subsidiaries is duly incorporated and in good standing in such state and stating that the Company and its Subsidiaries owes no franchise taxes in such state and listing all documents of the Company and its Subsidiaries on file with said Secretary of State; (iii) a copy of the Certificate of Incorporation of the Company, including all amendments thereto, certified as of a recent date by the Secretary of State of the State of Delaware; (iv) evidence, reasonably satisfactory to the Parent, of the authority and incumbency of the persons acting on behalf of the Company in connection with the execution of any document delivered in connection with this Agreement; (v) Uniform Commercial Code Search Reports on Form UCC-11 with respect to the Company and its Subsidiaries from the states and local jurisdictions where the principal place of business of the Company and its Subsidiaries and their respective assets are located, the search reports of which shall confirm compliance with Section 3.15 (and Schedule thereto) of this Agreement; (vi) the corporate minute books and stock record books of the Company and its Subsidiaries; (vii) estoppel letters of lenders to the Company, in form and substance reasonably satisfactory to the Parent, with respect to amounts (including any pre-payment penalties) owing by the Company as of the Closing; and (viii) such other instruments and documents as the Parent shall reasonably request not inconsistent with the provisions hereof.

  • Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.

  • Source Documentation Accounting records must be supported by such source documentation as canceled checks, bank statements, invoices, paid bills, donor letters, time and attendance records, activity reports, travel reports, contractual and consultant agreements, and subaward documentation. All supporting documentation should be clearly identified with the Award and general ledger accounts which are to be charged or credited. (i) The documentation standards for salary charges to grants are prescribed by 2 CFR 200.430, and in the cost principles applicable to the entity’s organization (Paragraphs 7.4 through 7.7). (ii) If records do not meet the standards in 2 CFR 200.430, then Grantor may notify Grantee in PART TWO, PART THREE or Exhibit G of the requirement to submit Personnel activity reports. See 2 CFR 200.430(i)(8). Personnel activity reports shall account on an after-the-fact basis for one hundred percent (100%) of the employee's actual time, separately indicating the time spent on the grant, other grants or projects, vacation or sick leave, and administrative time, if applicable. The reports must be signed by the employee, approved by the appropriate official, and coincide with a pay period. These time records should be used to record the distribution of salary costs to the appropriate accounts no less frequently than quarterly. (iii) Formal agreements with independent contractors, such as consultants, must include a description of the services to be performed, the period of performance, the fee and method of payment, an itemization of travel and other costs which are chargeable to the agreement, and the signatures of both the contractor and an appropriate official of Grantee. (iv) If third party in-kind (non-cash) contributions are used for Grant purposes, the valuation of these contributions must be supported with adequate documentation.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!