Interregional Planning Process Sample Clauses

Interregional Planning Process. The ISO, the Transmission Owners, and Market Participants and other interested parties shall coordinate system planning activities with neighboring planning regions (i.e., the ISO/RTO Regions and adjacent portions of Canada). The Interregional Planning Protocol includes a description of the committee structure, processes, and procedures through which system planning activities are openly and transparently coordinated by the ISO/RTO Regions. The objective of the interregional planning process is to contribute to the on-going reliability and the enhanced operational and economic performance of the ISO/RTO Regions through: (1) exchange of relevant data and information; (2) coordination of procedures to evaluate certain interconnection and transmission service requests; (3) periodic comprehensive interregional assessments; (4) identification and evaluation of potential Interregional Transmission Projects that can address regional needs in a manner that may be more efficient or cost-effective than separate regional solutions, in accordance with the requirements of Order No. 1000; (5) allocation of costs among the ISO/RTO Regions of Interregional Transmission Projects, identified in accordance with the Interregional Planning Protocol and approved by each region, pursuant to the cost allocation methodology set forth in Section 31.5.7 herein. The planning activities of the ISO/RTO Regions shall be conducted consistent with the planning criteria of each ISO/RTO Region’s regional reliability organization(s) as well as the relevant local reliability entities. The ISO/RTO Regions shall periodically produce a Northeastern Coordinated System Plan that integrates the system plans of all of the ISO/RTO Regions.
AutoNDA by SimpleDocs

Related to Interregional Planning Process

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

  • Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "C", which is attached hereto and forms part of this Agreement.

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • System Impact Study An assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights.

  • Training Programs All employees shall successfully complete all necessary training prior to being assigned work (e.g., all employees will complete health and safety training prior to being assigned to task). Nothing in this Article or provision shall constitute a waiver of either party’s bargaining obligations or defenses. The Employer still has an obligation to notify and bargain changes in terms and conditions of employment with the exclusive representative.

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Training Plan Within 90 days after the Effective Date, Good Shepherd shall develop a written plan (Training Plan) that outlines the steps Good Shepherd will take to ensure that: (a) all Covered Persons receive adequate training regarding Good Shepherd’s CIA requirements and Compliance Program, including the Code of Conduct and (b) all Relevant Covered Persons receive adequate training regarding: (i) the Federal health care program requirements regarding eligibility for hospice services upon initial admission, recertification for continued stay, and for Continuous Care, Respite Care, and General Inpatient Care; (ii) the role of physicians in making eligibility determinations; (iii) the accurate coding and submission of claims; (iv) policies, procedures, and other requirements applicable to the documentation of medical records; (v) the personal obligation of each individual involved in the claims submission process to ensure that such claims are accurate; (vi) applicable reimbursement statutes, regulations, and program requirements and directives; (vii) the legal sanctions for violations of the Federal health care program requirements; and (viii) examples of proper and improper eligibility determinations, documentation, and claims submission practices. The Training Plan shall include information regarding the training topics, the categories of Covered Persons and Relevant Covered Persons required to attend each training session, the length of the training, the schedule for training, and the format of the training. Within 30 days of the OIG’s receipt of Good Shepherd’s Training Plan, OIG will notify Good Shepherd of any comments or objections to the Training Plan. Absent notification by the OIG that the Training Plan is unacceptable, Good Shepherd may implement its Training Plan. Good Shepherd shall furnish training to its Covered Persons and Relevant Covered Persons pursuant to the Training Plan during each Reporting Period.

Time is Money Join Law Insider Premium to draft better contracts faster.