Inwater Noise. In-water noise from construction can result from dredging, blasting, fill placement, pile driving, and waterborne vessel movements. Construction noise generated in assembly of bridge or ferry landing structures above the water can be transmitted into the water through steel or concrete structures. Inwater blasting might be necessary to prepare the foundations for inwater piers and would be needed under Alternative F3 to improve the navigation conditions in the channel west of Xxxxxxx Island. Noise levels associated with pile removal, driving, and pre-drilling, as well as with other aspects of the proposed action, might temporarily be elevated above existing background noise levels. Xxxxx et al. (1996) investigated the impacts of driving large concrete piles on juvenile pink and chum salmon behavior and distribution in Everett Harbor, Washington. The authors reported that there might be changes in general behavior and school size, and that fish appeared to be driven toward the acoustically isolated side of the site during pile driving. However, the prevalence of fish schools did not change substantially with or without pile driving, and schools were often observed about the pile-driving rigs themselves. No impacts on feeding were reported. The study concluded that any effects of concrete pile-driving noise on juvenile salmonid fitness would be very difficult to measure quantitatively. More recent experience in Puget Sound and elsewhere, however, has documented more severe effects from use of an impact hammer to drive large diameter, hollow steel piles such as those that will be required for this project (although any pile driving for this project is anticipated to use a vibratory hammer, instead of an impact hammer). Effects are believed to be exacerbated when driving piles into hard substrates (e.g., gravel, cobble) when compared with effects while driving into softer sands or mud. Impact driving of 24-inch steel piles in late 2002 at a ferry terminal in Puget Sound resulted in mortality of a number of marine perch (Embiotocidae), and similar or larger piles, driven by impact hammer at the Port of Seattle, resulted in mortality of Pacific xxxxxxx (X. Xxxxxx, WDFW, personal communications). However, impact driving of 24-inch piles at the Mukilteo, Washington, ferry dock in early 2003 did not result in documented fish kills; a bubble curtain was deployed at Mukilteo and shown to substantially reduce measured water-borne sound pressures (X. Xxxxxxxx, Pentec, ...
AutoNDA by SimpleDocs

Related to Inwater Noise

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • WATERBEDS The Tenant: (check one)

  • Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.

  • Recycling If this Agreement provides for the purchase or use of goods specified in PCC 12207 (for example, certain paper products, office supplies, mulch, glass products, lubricating oils, plastic products, paint, antifreeze, tires and tire-derived products, and metal products), this section is applicable with respect to those goods. Without limiting the foregoing, if this Agreement includes (i) document printing, (ii) parts cleaning, or (iii) janitorial and building maintenance services, this section is applicable. Contractor shall use recycled products in the performance of this Agreement to the maximum extent doing so is economically feasible. Upon request, Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the PCC 12200, in such goods regardless of whether the goods meet the requirements of PCC 12209. With respect to printer or duplication cartridges that comply with the requirements of PCC 12156(e), the certification required by this subdivision shall specify that the cartridges so comply.

  • Platby In consideration for the proper performance of the Study by Site in compliance with the terms and conditions of this Agreement, payments shall be made in accordance with the provisions set forth in Attachment A, with the last payment being made after the Site completes all its obligations hereunder, and IQVIA has received all properly completed CRFs and, if IQVIA requests, all other Confidential Information (as defined below). V souvislosti s řádným plněním Studie Místem provádění klinického hodnocení, a to v souladu s podmínkami a ustanoveními této Smlouvy, budou poskytovány platby dle podmínek a ustanovení definovaných v Příloze A, přičemž poslední platba bude uskutečněna poté, co Místo provádění klinického hodnocení splní a dokončí veškeré závazky, jež mu vyplývají z této Smlouvy, a IQVIA obdrží veškeré řádně vyplněné CRF a, bude-li tak IQVIA vyžadovat, veškeré další Důvěrné informace The estimated value of financial payment under this Agreement shall be approximately CZK 903.042,-. DrugDev will receive Site invoices and process payments unless otherwise agreed. Any queries regarding Site invoices or payments should be directed to XxxxXxx at the contact details outlined in Attachment A. All payments will be made in favor of the Institution. (ve smyslu níže uvedené definice). Předpokládaná hodnota finančního plnění dle této Smlouvy činí přibližně 903.042,- Kč. Nebude-li ujednáno jinak, faktury od Místa provádění klinického hodnocení obdrží a platby bude zpracovávat společnost DrugDev. Veškeré dotazy ohledně faktur Místa provádění klinického hodnocení nebo plateb mají být adresovány společnosti DrugDev, jejíž kontaktní údaje jsou uvedeny v Příloze A. Veškeré platby budou uskutečněny ve prospěch Poskytovatele...

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.