Job Descriptions The Employer agrees to supply each employee with a copy of her current job description. Upon request, the Union and the Bargaining Unit Chair shall be provided copies of all job descriptions in the bargaining unit.
(b) - Job Descriptions A copy of the current job description for a bargaining unit position shall be made available to the Union upon request. When a new classification which is covered by terms of this collective agreement is created, a copy of the job description shall be forwarded to the Union at the time that the Hospital notifies the local Union of the rate of pay pursuant to article 20.01(a) above.
Job Description The Employer agrees to draw up job descriptions for all positions for which the Union is bargaining agent. These descriptions shall be presented and discussed with the Union and shall become the recognized job descriptions unless the Union presents written objection within thirty (30) calendar days.
Job Duties It is understood by the parties that every incidental duty connected with operations enumerated in job descriptions is not always specifically described and employees may be required to perform other job-related duties not specifically contained in the job description; however, employees required to perform such duties shall be qualified for the work to be performed.
SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer shall be responsible for the procurement, engineering and construction of the Interconnection Customer’s Interconnection Facilities and the Connecting Transmission Owner’s Interconnection Facilities. The Interconnection Customer will design and construct the Interconnection Customer’s Interconnection Facilities and Connecting Transmission Owner’s Interconnection Facility in accordance with the applicable requirements of Connecting Transmission Owner, as set out in the Connecting Transmission Owner’s Bulletin 86-01, to the extent not inconsistent with the terms of this Agreement or the NYISO OATT. To the extent not inconsistent with the terms of this Agreement or the NYISO OATT, Interconnection Customer will: • Provide the engineering and design resources to develop complete construction drawings for the new 34.5kV terminal within Connecting Transmission Owner’s Bennington Substation according to current Connecting Transmission Owner standards; • Perform all necessary technical and environmental studies required for the Interconnection Facilities per Connecting Transmission Owner standards; • Procure all Substation Protection & Control equipment required for the Interconnection Facilities per Connecting Transmission Owner standards; SERVICE AGREEMENT NO. 2526 • Provide the substation construction resources to construct the new 34.5kV terminal including but not limited to the installation of two additional bay structures along with two, three phase 34.5kV circuit breakers and associated motor operated disconnect switches which will be added to each of the incoming line terminals from Cowlesville and Wales Center Substation. The incoming line for Niagara Solar project will require the addition of one, three phase 34.5kV circuit breaker and associated motor operated disconnect switches. In addition to the 34kV circuit breaker and associated switches structures, bus, control cables, protection and control equipment, primary metering equipment, SCADA, etc. within the Connecting Transmission Owner’s Bennington Substation; • Complete testing and commissioning of the new construction of Interconnection Facilities per Connecting Transmission Owner standards; • Complete the Inspection Form included in the Connecting Transmission Owner’s Final Technical Review for the Niagara Solar Project; • Notify Connecting Transmission Owner at least two weeks in advance of commissioning; • Provide certified test reports prior to commissioning per Connecting Transmission Owner standards; • Provide a contact person for local Connecting Transmission Owner Operations; and • Design and install the solar equipment. All project engineering and design work related to the interconnection at Connecting Transmission Owner’s Bennington Substation shall be per Connecting Transmission Owner’s current standards. All of Interconnection Customer’s engineering and design project documentation shall be approved by Connecting Transmission Owner. The work at the Bennington Substation for the Small Generating Facility shall be per the Connecting Transmission Owner’s standards and under the supervision of Connecting Transmission Owner’s Field Construction Manager (“FCM”). A list of engineering contractors and substation construction contractors currently approved by the Connecting Transmission Owner is available. However, the Interconnection Customer may propose an alternate engineering contractor and/or substation construction contractor for review and acceptance by the Connecting Transmission Owner.
General Duties and Responsibilities 1. Responsibilities under the General Conditions of the Contract for Construction: In addition to the responsibilities herein set forth, Consulting Engineer/Architect agrees to be responsible for those matters identified in the General Conditions as being responsibilities of the Consulting Engineer/Architect. Consulting Engineer/Architect specifically acknowledges receipt of a copy of the General Conditions and acceptance of the responsibilities as set forth therein.
SERVICES AND RESPONSIBILITIES 2.1 Contractor hereby agrees to perform the services described and for the fee set forth in the Scope of Work. The Contractor shall be solely responsible for the satisfactory and complete execution of the Scope Work. The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Scope of Work. The Scope of Work shall generally be performed at the direction of the NMCRA and completed and completed within that certain number of days from the issuance of a Work Order by the NMCRA to the Contractor (the “Term”). Time is of the essence in the performance of all obligations within the Term. Final Completion of the Scope of Work shall be completed prior to the expiration of the Term and the failure of the Contractor to do so shall be a material default under this Agreement. “
Duties and Responsibilities (a) The Auction Agent is acting solely as agent for the Company hereunder and owes no fiduciary duties to any other Person by reason of this Agreement.
Roles and Responsibilities 1. The Donor States shall make funds available in support of eligible programmes proposed by the Beneficiary State and agreed on by the Financial Mechanism Committee within the priority sectors listed in Article 3.1 of Protocol 38c and the programme areas listed in the Annex to Protocol 38c. The Donor States and the Beneficiary State shall cooperate on the preparation of concept notes defining the scope and planned results for each programme.