Preconstruction Services During the Design & Preconstruction Phase, the Design-Builder shall provide such design and preconstruction services as are necessary to properly advance the Project. Without limiting the generality of the foregoing, during the Preconstruction Phase, the Design-Builder shall: (i) work with its Architect and any design consultants to advance the design for the Project in consultation with Client Agency, the Department and its Program Manager; (ii) obtain bids from trade subcontractors to perform the work described in the Design Development Documents and provide bid tabulations to the Department; (iii) engage in any value engineering and scoping exercises necessary to return the cost of the work to the Project Budget; (iv) engage in preconstruction activities, including identifying any long-lead items; (v) develop a GMP proposal for the Project; and (vi) enter into a GMP for the Project. Throughout the Design & Preconstruction Phase, the Design-Builder shall schedule and attend regular meetings with the Department, the Program Manager and the Architect. A list of preconstruction deliverables is set forth in Exhibit C.
Ambulance Services Ground Ambulance Air and Water Ambulance
Surgery Services This plan covers surgery services to treat a disease or injury when: • the operation is not experimental or investigational, or cosmetic in nature; • the operation is being performed at the appropriate place of service; and • the physician is licensed to perform the surgery. This plan covers reconstructive surgery and procedures when the services are performed to relieve pain, or to correct or improve bodily function that is impaired as a result of: • a birth defect; • an accidental injury; • a disease; or • a previous covered surgical procedure. Functional indications for surgical correction do not include psychological, psychiatric or emotional reasons. This plan covers the procedures listed below to treat functional impairments. • abdominal wall surgery including panniculectomy (other than an abdominoplasty); • blepharoplasty and ptosis repair; • gastric bypass or gastric banding; • nasal reconstruction and septorhinoplasty; • orthognathic surgery including mandibular and maxillary osteotomy; • reduction mammoplasty; • removal of breast implants; • removal or treatment of proliferative vascular lesions and hemangiomas; • treatment of varicose veins; or • gynecomastia.
Design Services The Engineer shall perform services during the schematic design phase, the design development phase, the contract documents phase, and the bidding period as hereinafter specified.
Technical Services Party B will provide technical services and training to Party A, taking advantage of Party B’s advanced network, website and multimedia technologies to improve Party A’s system integration. Such technical services shall include: (a) administering, managing and maintaining Party A’s information application system and website system infrastructure; (b) providing system optimization plans and implementing optimization features; (c) assuring the security and reliability of the website application systems; (d) procuring, installing and supporting the relevant products produced by Party B, and providing training in the use of those products; (e) managing and maintaining all network and providing technologies to assure the reliability and efficiency thereof; (f) providing information technology services and assuring the reliable operation of the information infrastructure.
Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR
Transportation Services i) In the event that transportation services for a student served by CONTRACTOR pursuant to an Individual Services Agreement are to be provided by a party other than CONTRACTOR or the LEA or its transportation providers, such services shall be reflected in a separate agreement signed by the parties hereto, and provided to the LEA and SELPA Director by the CONTRACTOR. Except as provided below, CONTRACTOR shall compensate the transportation provider directly for such services, and shall charge the LEA for such services at the actual and reasonable rates billed by the transportation provider, plus a ten percent (.
Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three
Service Commencement Date The date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Section 15.3 or Section 29.1 under the Tariff.
Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.