Limits of Construction Sample Clauses

Limits of Construction. The physical area within which the Builder is to perform work according to the Documents.
AutoNDA by SimpleDocs
Limits of Construction. Reference ☐ ☐ ☐
Limits of Construction. In general, work will take place in existing sites with the goal of minimal disturbance to existing and adjacent properties, facilities, vegetation and grades. The Limits of Construction shall be defined as one (1) metre beyond the defined disturbed area on the plan, or as directed by the City. All areas within the Limits of Construction shall be restored with topsoil and sod (max 3:1 slopes) as per the specifications, contract drawings or as directed onsite by the City. All restorations are to match existing grades and must allow for positive drainage away from pathways and structures. The Company is responsible to make good all damages that are caused by their forces to areas outside the Limits of Construction and to existing facilities and surfaces at the Company’s cost, to the satisfaction of the City. Where construction beyond the Limits of Construction is approved by the City (for grading purposes, etc.) restoration costs will be charged at the unit price for topsoil and sod.
Limits of Construction. The Project Site, construction limits, and dredge limits available to the Contractor for accomplishing the Work are documented herein and/or are shown on the Contract Plans. The Contractor may not store Plant or equipment, including sediment pipeline, in excess of what is needed for this Contract within the Work Area. The Contractor shall confine his/her Plant, equipment, and operations of personnel to areas permitted by law, ordinances, Permits, and the requirements of the Contract Documents. The Work Area is defined from the continuous line of vegetation or the bayside/landside mean high water line, whichever is further north, extending gulfward to the toe of the beach fill template including the beach slope tolerance. The Work Area also encompasses the borrow area, pump-out areas, conveyance corridors, and temporary access and staging areas shown on the Plans.
Limits of Construction. The limits of construction DGN file as provided by the EOR will be imported or referenced to the master CADD file. Additional labeling will be added as required. The PSM is required to advise the EOR of any noted discrepancies between the limits of construction line and the existing/proposed right of way lines, and for making adjustments as needed when a resolution is determined.
Limits of Construction. Stake the limits of construction at a minimum of 100 foot intervals including any major angle points.

Related to Limits of Construction

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Principles of Construction All references to sections and schedules are to sections and schedules in or to this Agreement unless otherwise specified. All uses of the word “including” shall mean “including, without limitation” unless the context shall indicate otherwise. Unless otherwise specified, the words “hereof,” “herein” and “hereunder” and words of similar import when used in this Agreement shall refer to this Agreement as a whole and not to any particular provision of this Agreement. Unless otherwise specified, all meanings attributed to defined terms herein shall be equally applicable to both the singular and plural forms of the terms so defined.

  • Certain Matters of Construction The terms “herein,” “hereof,” “hereunder” and other words of similar import refer to this Agreement as a whole and not to any particular section, paragraph or subdivision. Any pronoun used shall be deemed to cover all genders. In the computation of periods of time from a specified date to a later specified date, “from” means “from and including,” and “to” and “until” each mean “to but excluding.” The terms “including” and “include” shall mean “including, without limitation” and, for purposes of each Loan Document, the parties agree that the rule of ejusdem generis shall not be applicable to limit any provision. Section titles appear as a matter of convenience only and shall not affect the interpretation of any Loan Document. All references to (a) laws or statutes include all related rules, regulations, interpretations, amendments and successor provisions; (b) any document, instrument or agreement include any amendments, waivers and other modifications, extensions or renewals (to the extent permitted by the Loan Documents); (c) any section mean, unless the context otherwise requires, a section of this Agreement; (d) any exhibits or schedules mean, unless the context otherwise requires, exhibits and schedules attached hereto, which are hereby incorporated by reference; (e) any Person include successors and assigns; (f) time of day mean time of day at Lenders’ notice addresses under Section 13.3.1; or (g) discretion of any Lender mean the sole and absolute discretion of such Person. All calculations of fundings of the Loans, and payments of Obligations shall be in Dollars and, unless the context otherwise requires, all determinations made from time to time under the Loan Documents shall be made in light of the circumstances existing at such time. Borrowers shall have the burden of establishing any alleged negligence, misconduct or lack of good faith by any Lender under any Loan Documents. No provision of any Loan Documents shall be construed against any party by reason of such party having, or being deemed to have, drafted the provision.

  • Rule of Construction No rule of construction requiring interpretation against the drafting Party hereof shall apply in the interpretation of this Agreement.

  • No Rule of Construction The parties acknowledge that this Agreement was initially prepared by the Department solely as a convenience and that all parties hereto, and their counsel, have read and fully negotiated all the language used in the Agreement. The parties acknowledge that, because all parties and their counsel participated in negotiating and drafting this Agreement, no rule of construction shall apply to this Agreement that construes ambiguous or unclear language in favor of or against any party because such party drafted this Agreement.

  • Definitions and Principles of Construction Section 1.1 Defined Terms 1 Section 1.2 Principles of Constructions 1

  • Rules of Construction Unless the context otherwise requires: (1) a term has the meaning assigned to it; (2) an accounting term not otherwise defined has the meaning assigned to it in accordance with GAAP;

  • Certain Rules of Construction No party shall be considered as being responsible for the drafting of this Agreement for the purpose of applying any rule construing ambiguities against the drafter or otherwise. No draft of this Agreement shall be taken into account in construing this Agreement. Any provision of this Agreement which requires an agreement in writing shall be deemed to require that the writing in question be signed by the Executive and an authorized representative of the Company.

  • Manner of Construction Landlord may impose, as a condition of its consent to any and all Alterations or repairs of the Premises or about the Premises, such requirements as Landlord in its reasonable discretion may deem desirable, including, but not limited to, the requirement that upon Landlord’s request, Tenant shall, at Tenant’s expense, remove such Alterations upon the expiration or any early termination of the Lease Term (upon Tenant’s request, Landlord shall specify, at the time of its consent, which Alteration, if any, must be removed upon expiration or early termination of the Lease Term), and/or the requirement that Tenant utilize for such purposes only contractors, materials, mechanics and materialmen approved by Landlord. Tenant shall construct such Alterations and perform such repairs in conformance with any and all applicable rules and regulations of any federal, state, county or municipal code or ordinance and pursuant to a valid building permit, issued by the City of Irvine in conformance with Landlord’s construction rules and regulations. All work with respect to any Alterations must be done in a good and workmanlike manner and diligently prosecuted to completion to the end that the Premises shall at all times be a complete unit except during the period of work. In performing the work of any such Alterations, Tenant shall have the work performed in such manner as not to obstruct access to the Building or the common areas by any other tenant of the Building, and as not to obstruct the business of Landlord or other tenants in the Building, or interfere with the labor force working in the Building. If Tenant makes any Alterations, Tenant agrees to carry “Builder’s All Risk” insurance in an amount approved by Landlord covering the construction of such Alterations, and such other insurance as Landlord may require, it being understood and agreed that all of such Alterations shall be insured by Tenant pursuant to Article 10 of this Lease immediately upon completion thereof. In addition, Landlord may, in its discretion, require Tenant to obtain a lien and completion bond or some alternate form of security satisfactory to Landlord in an amount sufficient to ensure the lien-free completion of such Alterations and naming Landlord as a co-obligee. Upon completion of any Alterations, Tenant shall (i) cause a timely Notice of Completion to be recorded in the office of the Recorder of Irvine County in accordance with the terms of Section 3093 of the Civil Code of the State of California or any successor statute, (ii) deliver to Landlord a reproducible copy of the “as built” drawings of the Alterations, and (iii) deliver to Landlord evidence of payment, contractors’ affidavits and full and final waivers of all liens for labor, services or materials.