Monitoring by PSI and Sponsor Sample Clauses

Monitoring by PSI and Sponsor. (a) PSI, the Sponsor and their representatives may monitor and/or meet with the Investigator and the Study Personnel at the Investigative Site during normal business hours and with reasonable 6.2
AutoNDA by SimpleDocs

Related to Monitoring by PSI and Sponsor

  • Project Monitoring by the State The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Drug Testing Procedures a. The testing procedures and safeguards provided in this policy shall be adhered to by any laboratory personnel administering departmental drug tests.

  • Approval of Contractor’s Staff 7.3.1 County has the absolute right to approve or disapprove all of the Contractor’s staff performing work hereunder and any proposed changes in the Contractor’s staff, including, but not limited to, the Contractor’s Project Manager.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia: