NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 560.00 Rft P. Rft 3 P/F compression fitting for HDPE Pipes. i. Tee Bend size 90mmx90mm 1.00 Nos. Each P/F compression fitting for HDPE Pipes. ii. Equal Bend size 90mmx90mm 1.00 Nos. Each 4 P/F PE 80 Butt fusion fitting for HDPE Pipes. i. Stub End (short collar) 90 mm (PN-8) 4.00 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WS) EZ WASA BID SHEET Name of Work: PROVIDING / LAYING OF 3" I/D (HDPE) WATER SUPPLY PIPELINE & P/F SLUICE VALVE 3" I/D IN COMMITTEE MOHALLAH INFRONT OF MC GIRLS SCHOOL, MILLAT COLONY UC 42, WASA RAWALPINDI. Estimated Cost Rs. 340,200/- Xxxxxxx Money 6804/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 270.00 Cft P.% Cft 12312.95 33245 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 1350.00 Cft P.%o Cft 8403.10 11344 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 360.00 Rft P. Rft 197.35 71046 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 3276.90 6554 5 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 1.00 Nos. Each 18272.30 18272 6 Providing / fixing of Cast iron specials of BSS Class B complete. 20.00 Kgs P. Kg 130.15 2603 7 Rehandling and ramming of earthwork (80% of excavation) 1080.00 Cft P.%o Cft 2798.40 3022 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 540.00 Cft P.%o Cft 10244.40 5532 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 135.00 Cft P.% Cft 27346.20 36917 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 135.00 Cft P.% Cft 36557.40 49352 MRS Item Total (A) Rs:- 237888 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
AutoNDA by SimpleDocs
NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 370.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (S&D) WASA BID SHEET Name of Work: PROVIDING AND LAYING OF SEWER LINE AT MAGISTRATE COLONY CIVIL LINE UC 45 WASA RAWALPINDI. Estimated Cost Rs. 352,500/- Xxxxxxx Money 7050/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx
NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 140.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (S&D) WASA BID SHEET Name of Work: PROVIDING AND LAYING OF SEWER LINE AT F-BLOCK FROM F-297 TO F-298, F-BLOCK UC 13 WASA RAWALPINDI. Estimated Cost Rs. 470,700/- Xxxxxxx Money 9414/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx
NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 310.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor
NON- MRS ITEMS. All electrical items given below shall be read in conjunction with parts of the Specifications and electrical drawings except otherwise indicated. The Electrical Works include design, supply, transportation, installation, testing and commissioning of the following items of works as mentioned in this BOQ (unless specifically stated otherwise) including all material, labour, tools, accessories, related civil works, etc., as required for proper completion of each item as per specifications unless otherwise mentioned. (Any necessary material not mentioned in specifications, electrical drawings and here in this BOQ required for proper installation, testing and commissioning of equipment and materials shall be included in BOQ rates.
NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 400.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (S&D) WASA BID SHEET Name of Work: PROVIDING AND LAYING OF SEWER LINE AT INFRONT OF SAINT XXXX STREET UC 15 WASA RAWALPINDI. Estimated Cost Rs. 490,200/- Xxxxxxx Money 9804/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling Cement Concrete 1:2:4 Plain 177.74 Cft Per % Cft 12312.95 21885 2 Dismantling Cement Concrete 1:4:8 Plain 134.65 Cft Per % Cft 6156.50 8290 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2692.97 Cft Per %0 Cft 12926.85 34812 4 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.12" i/d 178.50 Rft Per Rft 756.60 135053 5 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 177.74 Cft Per % Cft 27346.20 48605 6 Pacca brick work other than building in cement sand mortar (1:4) complete. 131.35 Cft Per % Cft 36297.85 47677 7 Cement plaster (1:4) 1/2" thick 158.64 Sft P. % Sft 3518.30 5581 8 Cement concrete plain including placing, compacting, finishing and curing complete: (1:2:4) 283.72 Cft Per % Cft 36557.40 103721 9 Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 11224.95 33675 10 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 2444.95 Cft Per %0 Cft 2798.40 6842 11 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 560.41 Cft Per %0 Cft 16257.20 9111 MRS Xxxx Total (A) Rs:- 455251 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
NON- MRS ITEMS. 1.0 Earthwork
AutoNDA by SimpleDocs
NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 720.00 Rft P. Rft 2 Provision of House connection from newly laid pipeline 24.00 Nos. Each 3 Providing /fixing of Non Return valve of BSS B complete in all respect. 1.00 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor
NON- MRS ITEMS. 1 Provision made for electric resistivity survey for location of suitable site of tubewells. 8.00 Nos. Each
NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 480 Rft P. Rft 2 Replacement connections of leakage house 18 Nos. Each Contractor Dy. Director (WS) EZ WASA BID SHEET Name of Work: PROVIDING / LAYING OF 3" WATER SUPPLY PIPELINE IN BLOCK NO. 0 XXXXXX XX. 3 FAISAL COLONY WASA RAWALPINDI. Estimated Cost Rs. 434,900/- Xxxxxxx Money 8698/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 420.50 Cft P.% Cft 12312.95 51776 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 1682.00 Cft P.%o Cft 8403.10 14134 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 550.00 Rft P. Rft 197.35 108543 5 Providing / fixing of Cast iron specials of BSS Class B complete. 89.50 Kgs P. Kg 130.15 11648 6 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 1.00 Nos. Each 18272.00 18272 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 1345.60 Cft P.%o Cft 2798.40 3766 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 756.90 Cft P.%o Cft 10128.20 7666 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 210.25 Cft P.% Cft 27346.20 57495 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 210.25 Cft P.% Cft 36557.40 76862 MRS Item Total (A) Rs:- 356716 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-