Permanent BMP As-Built Certification Clause Samples

Permanent BMP As-Built Certification. Design Professional will perform site observations to confirm that the site improvements for the project have been constructed in conformance with the City of San Diego’s 2018 Storm Water Standards, as reflected in the Green Infrastructure Report and construction plans for the project. The approved Green Infrastructure Report and Green Infrastructure Plan Sheets will be used to verify if field conditions reflect the intended layout for Low Impact Development (LID) site design, source control, and pollutant control BMP(s), as-applicable. If the field conditions are not found to be in conformance, then the specific items of concern will be discussed with the City of San Diego. Discussion could include corrective measures, alternative solutions and subsequent processing and approval through the City. Perform a total of up to four (4) site visits, and complete of the Permanent BMP Construction Self Certification Form (DS-563) for twelve (12) water quality BMPs. Each water quality BMP will be visited twice: once when the subgrade is installed with class 2 permeable base and once again when the water quality BMPs are completed (i.e., bioretention soil mix installed, rock- lining, and confirmed to have suitable percolation [where applicable]). It is assumed that the contractor will be responsible for providing percolation tests at BMPs that are expected to allow for infiltration. • Permanent BMP Construction Self Certification Form (DS-563)